After a thorough examination of this case (the procedure was open on the 29 Sept. 93 - see IP (93)819), the Commission decision concludes that these aid measures, which are lower than the restructuring costs of the school, are linked to a genuine restructuring programme which will allow the school to attain viability.
Après un examen minutieux (la procédure a été ouverte le 29 septembre 1993, cfr IP (93)819), la Commission a estimé que cette aide, inférieure aux coûts de restructuration de l'école, est liée à un véritable programme de restructuration qui doit rendre l'école viable.