Boost Your Productivity!Translate documents (Ms-Word, Ms-Excel, ...) faster and better thanks to artificial intelligence!
https://pro.wordscope.com
https://blog. wordscope .com
Applicable overhead cost
Construction manager
Construction project cost consultant
Construction project manager
Cost-shared project
Development project cost manager
Eligible overhead cost
Eligible project
Eligible project cost
Loan-to-project cost ratio
Project cost
Project costing
Project costs
Shared-cost project

Vertaling van "Eligible project cost " (Engels → Frans) :

TERMINOLOGIE


construction project cost consultant | development project cost manager | construction manager | construction project manager

directeur de la construction immobilière | directeur de la construction immobilière/directrice de la construction immobilière | directrice de la construction immobilière


applicable overhead cost [ eligible overhead cost ]

coûts indirects admissibles [ frais généraux admissibles ]


shared-cost project [ cost-shared project ]

projet à frais partagés








loan-to-project cost ratio

rapport prêt-coût de l'ensemble




IN-CONTEXT TRANSLATIONS
A total of 80 new projects with a total eligible project cost of EUR 2.4 billion were decided on by the Commission, Community funding for these new projects is over EUR 1.5 billion.

La Commission a approuvé 80 nouveaux projets représentant un coût total éligible de 2,4 milliards d'euros. Le financement communautaire de ces projets dépassera 1,5 milliard d'euros.


[3] As a result, the total ISPA contribution to projects funded in 2002 amounted to EUR 1.55 billion, representing an average grant rate of 64.9% of the total eligible project cost of EUR 2.39 billion, the remainder being financed by the applicant countries from national sources at central, regional, and/or local level, as well as by international financial institutions (IFIs).

Aussi, la contribution totale d'ISPA à des projets financés en 2002 s'élève à 1,55 milliard d'euros, représentant un taux moyen d'aide non remboursable de 64,9 % du coût éligible total de 2,39 milliards d'euros, le solde étant cofinancé par les pays candidats (sources nationales au niveau central, régional et/ou local) et par des institutions financières internationales (IFI).


The flat rate for the financing of the eligible indirect costs of the NMIs and DIs should be determined on the basis of the full indirect costs declared as eligible by NMIs and DIs participating in EMRP projects, which are stable and constitute a reliable approximation of the indirect costs to be incurred by NMIs and DIs participating in EMPIR projects.

Le taux forfaitaire pour le financement des coûts indirects éligibles des INM et des ID devrait être déterminé sur la base de la totalité des coûts indirects déclarés éligibles par les INM et les ID participant à des projets EMRP, qui sont stables et constituent une approximation fiable des coûts indirects que devront supporter les INM et les ID participant à des projets EMPIR.


If the actual costs exceed by 20 % the estimated costs, the Commission will have the opportunity to remove the project concerned from the list of eligible projects.

Si les coûts réels dépassent de 20 % les estimations, la Commission pourra retirer le projet en question de la liste des projets éligibles.


For more results, go to https://pro.wordscope.com to translate your documents with Wordscope Pro!
Costs for the use of such infrastructure shall not be eligible project costs.

Les coûts d'utilisation de ces infrastructures ne seront pas des coûts éligibles au titre des projets.


For the purposes of determining the appropriate threshold applicable to research and development project aid and feasibility studies pursuant to point (e), a project shall be considered to consist ‘predominantly’ of fundamental research or ‘predominantly’ of industrial research, if more than 50 % of the eligible project costs are incurred through activities which fall within the category of fundamental research or industrial research respectively.

Afin de déterminer le seuil approprié applicable aux aides en faveur des projets de recherche et de développement et aux études de faisabilité conformément au point e), un projet est considéré comme consistant «à titre principal» en de la recherche fondamentale ou «à titre principal» en de la recherche industrielle si plus de la moitié des coûts admissibles du projet sont liés à des activités relevant de la catégorie de la recherche fondamentale ou de ...[+++]


These costs are only considered eligible up to 70 % of total eligible project costs.

Ces coûts ne sont admissibles qu'à hauteur de 70 % des coûts totaux admissibles du projet.


(ii) the project involves effective cooperation between a company and a public research body, particularly in the context of coordination of national R D policies, where the public research body bears at least 10 % of the eligible project costs and has the right to publish the results insofar as they stem from research implemented by that body; or

ii) le projet repose sur une coopération effective entre une entreprise et un organisme public de recherche, notamment dans le contexte de la coordination des politiques nationales de recherche et développement, l'organisme public en question supportant au moins 10 % des coûts admissibles du projet et ayant le droit de publier les résultats dans la mesure où ceux-ci sont issus de recherches qu'il a lui-même effectuées, ou


In the proposed change eligible costs for additional infrastructure will be a maximum of 10 % of the eligible overall costs of the project.

Selon la modification proposée, les coûts éligibles concernant l'infrastructure auxiliaire ne dépassent pas 10 % du coût global éligible du projet.


The first is the problem of VAT, or more specifically the problem of classing this tax as an eligible project cost.

Le premier est la question de la TVA ou, plus précisément, le problème du classement de cette taxe parmi les dépenses éligibles dans le cadre des projets.




datacenter (1): www.wordscope.be (v4.0.br)

'Eligible project cost' ->

Date index: 2021-08-02
w