Boost Your Productivity!Translate documents (Ms-Word, Ms-Excel, ...) faster and better thanks to artificial intelligence!
https://pro.wordscope.com
https://blog. wordscope .com
Abbreviated address calling
Abbreviated address coding
Abbreviated dialing
Address code
Cable address code
D-frame
DC coded frame
Four-address code
Four-address instruction
Frame address code
Framed addressing machine stencil
P-frame
P-picture
Predicted frame
Predictive-coded frame
Predictive-coded picture
Short code dialing
Speed call
Speed calling
Speed dial

Traduction de «Frame address code » (Anglais → Français) :

TERMINOLOGIE
voir aussi les traductions en contexte ci-dessous


P-frame | predicted frame | predictive-coded picture | predictive-coded frame | P-picture

image P | image prédite


speed calling [ speed dial | speed call | abbreviated address calling | abbreviated dialing | abbreviated address coding | short code dialing ]

numérotation abrégée [ composition abrégée ]


four-address instruction [ four-address code ]

code à quatre positions


four-address code | four-address instruction

code à quatre positions




framed addressing machine stencil

stencil encadré pour machines à imprimer les adresses




TRADUCTIONS EN CONTEXTE
Question No. 654 Hon. John McKay: With regard to the proposed Rouge National Urban Park (RNUP): (a) how does the RNUP legislation and strategic plan incorporate the ecological integrity, water quality and quantity, and habitat restoration goals and priorities of (i) the Provincial Greenbelt Plan, (ii) the Rouge North Management Plan Section 4.1.1.2, (iii) the 2007 Rouge River Watershed Strategy and its targeted natural heritage system, (iv) the Little Rouge Corridor Management Plan (2007), (v) the Rouge Park Natural Heritage Action Plan (2008), (vi) the Toronto Great Lakes Area of Concern remedial action plan for Toronto, (vii) the federal report “How Much Habitat is Enough” and the recommendation of more than 30% forest ...[+++]

Question n 654 L'hon. John McKay: En ce qui concerne le Parc urbain national de la Rouge (PUNR) proposé: a) comment la législation et le plan stratégique tiennent-ils compte des buts et des priorités en matière d’intégrité de l’environnement, de quantité et de qualité de l’eau et de restauration de l’habitat (i) du Plan de la ceinture de verdure de la province, (ii) du Rouge North Management Plan (section 4.1.1.2), (iii) de la Rouge River Watershed Strategy (2007) et de son système patrimonial naturel ciblé, (iv) du Little Rouge Corridor Management Plan (2007), (v) du plan d’action pour la valorisation de patrimoine naturel de la Rouge ( ...[+++]




datacenter (1): www.wordscope.be (v4.0.br)

'Frame address code' ->

Date index: 2023-06-21
w