Boost Your Productivity!Translate documents (Ms-Word, Ms-Excel, ...) faster and better thanks to artificial intelligence!
https://pro.wordscope.com
https://blog. wordscope .com
Backbone ground track
Backbone track
COG
Centre track
Course over ground
Flight track
Ground track
Ground track noise
Ground track pointer
Ground track repeat cycle
Ground-track repeat cycle
Orbit repeat cycle
Orbit repeat period
Subsatellite path
Subsatellite track
Track

Vertaling van "Ground track " (Engels → Frans) :

TERMINOLOGIE
backbone ground track | backbone track | centre track

trajectoire nominale


ground track [ subsatellite track | subsatellite path ]

trace au sol [ trajectoire au sol | trace ]












orbit repeat cycle [ orbit repeat period | ground track repeat cycle | ground-track repeat cycle ]

cycle orbital [ période de répétitivité | cycle de répétitivité ]


track [ flight track | ground track ]

route [ route-sol ]


track | course over ground | COG

route sur le fond | route vraie
IN-CONTEXT TRANSLATIONS
Except where otherwise indicated in air traffic control clearances or specified by the competent authority, VFR flights in level cruising flight when operated above 900 m (3 000 ft) from the ground or water, or a higher datum as specified by the competent authority, shall be conducted at a cruising level appropriate to the track as specified in the table of cruising levels in Appendix 3.

Sauf indication contraire figurant dans les autorisations du contrôle de la circulation aérienne et sauf spécification contraire de l’autorité compétente, les vols VFR dans la phase de croisière en palier à une hauteur supérieure à 900 m (3 000 ft) au-dessus du sol ou de l’eau, ou au-dessus d’un niveau de référence supérieur spécifié par l’autorité compétente, sont effectués à l’un des niveaux de croisière correspondant à leur route, spécifiés dans le tableau des niveaux de croisière qui figure à l’appendice 3.


in an area where ground-based ADS-B equipment is in use, unless it is equipped with an ADS-B transmitter, with pressure-altitude reporting capability, which is continuously operating or which can be turned on when necessary by the tracking station.

dans une région où un équipement ADS-B basé au sol est en service, à moins que le ballon ne soit doté d’un émetteur ADS-B qui peut communiquer l’altitude-pression et qui fonctionne de façon continue ou qui peut être mis en marche au besoin par la station de poursuite.


in an area where ground-based SSR equipment is in use, unless it is equipped with a secondary surveillance radar transponder, with pressure-altitude reporting capability, which is continuously operating on an assigned code, or which can be turned on when necessary by the tracking station; or

dans une région où un équipement SSR basé au sol est en service, à moins que le ballon ne soit doté d’un transpondeur de radar secondaire de surveillance qui peut communiquer l’altitude-pression et qui fonctionne de façon continue sur un code assigné ou qui peut être mis en marche au besoin par la station de poursuite; ou


the balloon envelope is equipped with either a radar reflective device(s) or radar reflective material that will present an echo to surface radar operating in the 200 MHz to 2 700 MHz frequency range, and/or the balloon is equipped with such other devices as will permit continuous tracking by the operator beyond the range of ground-based radar.

que l’enveloppe du ballon ne soit équipée d’un ou plusieurs dispositifs ou d’un matériau réfléchissant les signaux radar et permettant d’obtenir un écho sur l’écran d’un radar de surface fonctionnant dans la gamme de fréquences 200 MHz à 2 700 MHz, et/ou que le ballon ne soit doté d’autres dispositifs qui permettront à l’opérateur radar d’assurer une poursuite continue au-delà de la portée du radar au sol.


For more results, go to https://pro.wordscope.com to translate your documents with Wordscope Pro!
This activity is known as space surveillance and tracking (SST), and is today mostly based on ground-based sensors such as telescopes and radars.

Cette activité, appelée «surveillance de l’espace et suivi des objets en orbite» (SST – Space surveillance and tracking), repose aujourd’hui essentiellement sur l’utilisation de capteurs au sol tels que des télescopes et des radars.


track rollers’ means the system that transmits the weight of the vehicle and crawler undercarriage to the ground via the track belt, transmits torque from the vehicle's drive system to the track belt and may produce a change of direction of the moving belt;

«galets de chenille», on entend le système qui transmet le poids du véhicule et du train chenillé au sol via la bande de chenille, qui transmet le couple du système d'entraînement du véhicule à la bande de chenille et qui peut produire un changement de direction de la bande en mouvement;


Track rollers’ means the system that transmits the weight of the vehicle and crawler undercarriage to the ground via the track belt, transmit torque from the vehicle’s drive system to the track belt and may produce a change of direction of the moving belt.

par «galets de chenille», on entend le système qui transmet le poids du véhicule et du train chenillé au sol par l’intermédiaire de la bande de chenille, qui transmet le couple du système d’entraînement du véhicule à la bande de chenille et qui peut produire un changement de direction de la bande en mouvement;


‘category T2’ comprises wheeled tractors with a minimum track width of less than 1 150 mm, with an unladen mass, in running order, of more than 600 kg, with a ground clearance of not more than 600 mm; if the height of the centre of gravity of the tractor (measured in relation to the ground) divided by the average minimum track for each axle exceeds 0,90, the maximum design speed shall be restricted to 30 km/h;

la «catégorie T2», qui comprend les tracteurs à roues dont la voie minimale est inférieure à 1 150 mm, la masse à vide en ordre de marche supérieure à 600 kg et la garde au sol inférieure ou égale à 600 mm; si la hauteur du centre de gravité du tracteur (mesurée par rapport au sol), divisée par la moyenne des voies minimales de chaque essieu est supérieure à 0,90, la vitesse maximale par construction est limitée à 30 km/h;


- Category T2: wheeled tractors with a maximum design speed of not more than 40 km/h, with a minimum track width of less than 1150 mm, with an unladen mass, in running order, of more than 600 kg and with a ground clearance of not more than 600 mm. However, where the height of the centre of gravity of the tractor(2) (measured in relation to the ground) divided by the average minimum track for each axle exceeds 0,90, the maximum design speed is restricted to 30 km/h.

- catégorie T2: tracteurs à roues dont la vitesse maximale par construction n'est pas supérieure à 40 km/h, dont la voie minimale est inférieure à 1150 mm, la masse à vide en ordre de marche supérieure à 600 kg, et la garde au sol inférieure ou égale à 600 mm; Toutefois, lorsque la valeur de la hauteur du centre de gravité du tracteur(2) (mesurée par rapport au sol), divisée par la moyenne des voies minimales de chaque essieu est supérieure à 0,90, la vitesse maximale par construction est limitée à 30 km/h,


- Category T2: wheeled tractors with a maximum design speed of not more than 40 km/h, with a minimum track width of less than 1150 mm, with an unladen mass, in running order, of more than 600 kg and with a ground clearance of not more than 600 mm. However, where the heigth of the centre of gravity of the tractor(1) (measured in relation to the ground) divided by the average minimum track for each axle exceeds 0,90, the maximum design speed is restricted to 30 km/h.

- catégorie T2: tracteurs à roues dont la vitesse maximale par construction n'est pas supérieure à 40 km/h, dont la voie minimale est inférieure à 1150 mm, la masse à vide en ordre de marche supérieure à 600 kg et la garde au sol inférieure ou égale à 600 mm; toutefois, lorsque la valeur de la hauteur du centre de gravité du tracteur(1) (mesurée par rapport au sol) divisée par la moyenne des voies minimales de chaque essieu est supérieure à 0,90, la vitesse maximale par construction est limitée à 30 km/h,




datacenter (1): www.wordscope.be (v4.0.br)

'Ground track' ->

Date index: 2024-09-16
w