Boost Your Productivity!Translate documents (Ms-Word, Ms-Excel, ...) faster and better thanks to artificial intelligence!
https://pro.wordscope.com
https://blog. wordscope .com
Freeboard load line
Legal load line
Length at load line
Length at loaded waterline
Length on load water line
Load line
Load line mark
Load line that applies to winter sea water
Load waterline
Load-line
Load-line calculation
Loading lines
Loadline mark
W
Winter Load Line
Winter North Atlantic load line
Winter load line
Winter marks

Vertaling van "Winter Load Line " (Engels → Frans) :

TERMINOLOGIE
winter load line [ Winter Load Line | winter marks ]

ligne de charge d'hiver


load line that applies to winter sea water | winter load line | W [Abbr.]

ligne de charge d'hiver


winter North Atlantic load line

ligne de charge d'hiver de l'Atlantique Nord


load line | loading lines | load line mark | loadline mark | freeboard load line | legal load line | load waterline

ligne de charge | ligne de flottaison en charge | marque de ligne de charge


winter North Atlantic load line

ligne de charge d'hiver dans l'Atlantique Nord


winter North Atlantic load line

ligne de charge d'hiver dans l'Atlantique Nord




load line [ load-line | load waterline ]

ligne de charge


length on load water line | length at loaded waterline | length at load line

longueur à la flottaison en charge | longueur à la flottaison


IN-CONTEXT TRANSLATIONS
134. For the purpose of 4.2.1 of the Timber Code, uprights shall be fitted on a vessel that is within a seasonal winter load line zone and is loaded in a Canadian port within the period during which the winter load line is applicable if

134. Pour l’application de 4.2.1 du Recueil de bois en pontée, les montants sont installés sur un bâtiment qui est dans une zone de ligne de charge d’hiver et qui est chargé à un port canadien pendant la période où la ligne de charge d’hiver s’applique si, selon le cas :


(6) The winter fresh water load line shall be placed so that its upper edge marks the assigned winter fresh water freeboard and the letter “W” shall be marked forward of this line.

(6) La ligne de charge d’hiver en eau douce doit être placée de façon que son bord supérieur indique le franc-bord d’hiver en eau douce assigné et la lettre « W » est marquée à l’avant de cette ligne.




datacenter (1): www.wordscope.be (v4.0.br)

'Winter Load Line' ->

Date index: 2023-03-05
w