Boost Your Productivity!Translate documents (Ms-Word, Ms-Excel, ...) faster and better thanks to artificial intelligence!
https://pro.wordscope.com
https://blog. wordscope .com
Delay differential equation
Delay distortion
Delay equation
Delay frequency distortion
Delay interval
Delay number
Delay period
Delay time
Delayed fall
Delayed freefall
Delayed opening descent
Delayed opening jump
Delayed-opening jump
Differential equation with delayed argument
Differential equation with delays
Differential equation with lag
Differential equation with lagging argument
Envelope delay distortion
Group delay distortion
Group-delay distortion
Hand lasting craftsman
Hand lasting operator
Hand lasting technician
Interval
Last dialed number recall
Last number recall
Last number redial
Last number repeat
Last seen area
Last seen point
Last seen spot
Last-seen area
Lasting machine operator
Lasting machine tender
Lasting-machine operator
Machine puller and laster
Manual lasting operator
Operate CAD software for lasts
Phase distortion
Phase shift distortion
Time delay distortion
Use CAD for lasts
Use computer-aided design for lasts
Victim's last seen point

Vertaling van "delays lasting " (Engels → Frans) :

TERMINOLOGIE
last seen point [ last seen area | last-seen area | last seen spot | victim's last seen point ]

dernier point de disparition [ dernier point observé ]


delay distortion [ delay/frequency distortion | delay frequency distortion | phase distortion | phase shift distortion | group delay distortion | envelope delay distortion | time delay distortion ]

distorsion de temps de propagation [ distorsion de la durée de propagation de groupe | distorsion de phase | distorsion de temps de propagation de groupe ]


hand lasting technician | manual lasting operator | hand lasting craftsman | hand lasting operator

monteur à la main | monteur à la main/monteuse à la main | monteuse à la main


operate CAD software for lasts in the footwear industry | use computer-aided design for lasts | operate CAD software for lasts | use CAD for lasts

utiliser la CAO pour réaliser des formes à monter


last number redial | last number recall | last dialed number recall | last number repeat

recomposition automatique du dernier numéro | recomposition du dernier numéro | rappel automatique du dernier numéro | rappel du dernier numéro composé | rappel du dernier numéro | répétition du dernier numéro composé | fonction bis


delayed freefall [ delayed fall | delayed opening descent | delayed opening jump | delayed-opening jump ]

saut à ouverture retardée


delay interval | delay number | delay period | delay time | interval

echelonnement | numero de retard


delay/frequency distortion | delay distortion | group delay distortion | group-delay distortion | phase distortion

distorsion de la durée de propagation de groupe | distorsion de phase | distorsion de temps de propagation | distorsion de retard | distorsion de délai | distorsion de temps de propagation de groupe | distorsion du temps de propagation de groupe


delay differential equation | differential equation with delayed argument | differential equation with delays | differential equation with lagging argument | differential equation with lag | delay equation

équation différentielle à argument retardé | équation différentielle à retardement


lasting-machine operator | machine puller and laster | lasting machine operator | lasting machine tender

monteur en chaussures | monteur en chaussures/monteuse en chaussures | monteuse en chaussures
IN-CONTEXT TRANSLATIONS
However, research has shown that significant delays were being experienced by young people who were suffering from psychosis before they started on treatment, and delays lasting up until two years before they were initiated into treatment.

Grâce à ces recherches, on a découvert que les jeunes souffrant de psychose devaient attendre très longtemps avant de commencer leur traitement, des fois jusqu'à deux ans.


When the process for obtaining treatment authorization involves a tribunal, the court or a substitute decision-maker, there may be delays lasting a few days, months or even years before treatment can be provided.

Quand, pour obtenir l’autorisation de traitement, il faut avoir recours à un tribunal ou à une autre personne chargée de prendre la décision, les délais peuvent aller de quelques jours à quelques années avant que le traitement ne commence.


A warm test phase 2 shall follow cold test phase 1 without delay, lasting a total of 448 seconds and comprising four elementary cycles. The warm test phase 2 shall be carried out without interruption;

on exécute ensuite immédiatement une phase 2 d’essai à chaud d’une durée totale de 448 secondes, comprenant quatre cycles élémentaires. La phase 2 d’essai à chaud est réalisée sans interruption;


the en route ATFM delay is the delay calculated by the central unit of ATFM as defined in Commission Regulation (EU) No 255/2010 laying down common rules on air traffic flow management (1) and expressed as the difference between the estimated take-off time requested by the aircraft operator in the last submitted flight plan and the calculated take-off time allocated by the central unit of ATFM;

le retard ATFM en route est le retard calculé par l’unité centrale d’ATFM, telle que définie dans le règlement (UE) no 255/2010 de la Commission du 25 mars 2010 établissant des règles communes relatives à la gestion des courants de trafic aérien (1), et exprimé par la différence entre l’heure estimée de décollage demandée par l’exploitant de l’aéronef dans le dernier plan de vol soumis et l’heure de décollage calculée et attribuée par l’unité centrale d’ATFM;


For more results, go to https://pro.wordscope.com to translate your documents with Wordscope Pro!
the en route ATFM delay is the delay calculated by the central unit of ATFM as defined in Regulation (EU) No 255/2010 and expressed as the difference between the estimated take-off time requested by the aircraft operator in the last submitted flight plan and the calculated take-off time allocated by the central unit of ATFM;

le retard ATFM en route est le retard calculé par l’unité centrale d’ATFM, telle que définie dans le règlement (UE) no 255/2010, et exprimé par la différence entre l’heure estimée de décollage demandée par l’exploitant de l’aéronef dans le dernier plan de vol soumis et l’heure de décollage calculée et attribuée par l’unité centrale d’ATFM;


the en route ATFM delay is the delay calculated by the central unit of ATFM as defined in Commission Regulation (EU) No 255/2010 of 25 March 2010 laying down common rules on air traffic flow management (1) and expressed as the difference between the take-off time requested by the aircraft operator in the last submitted flight plan and the calculated take-off time allocated by the central unit of ATFM;

le retard ATFM en route est le retard calculé par l’unité centrale d’ATFM, telle que définie dans le règlement (UE) no 255/2010 de la Commission du 25 mars 2010 établissant des règles communes relatives à la gestion des courants de trafic aérien (1), et exprimé par la différence entre l’heure de décollage demandé par l’exploitant de l’aéronef dans le dernier plan de vol soumis et l’heure de décollage calculée et attribuée par l’unité centrale d’ATFM;


North American refinery production right now is temporarily limited by routine maintenance, much of which was delayed last year in the wake of hurricane Katrina.

Les opérations de raffinage en Amérique du Nord sont actuellement ralenties temporairement par des mesures d'entretien normal, dont bon nombre ont été reportées l'an dernier en raison de l'ouragan Katrina.


For most projects declared to be of European interest, a significant current or prospective delay could be a delay expected to last between one and two years.

Pour la plupart des projets déclarés d'intérêt européen, la durée escomptée du retard significatif qu'ils ont, ou auront, pourrait être comprise entre un et deux ans.


So the hand-over date of 31 December 2003 will be subject to a late-delivery penalty by which the old rent payment will not give way to the new instalment payment as long as the delay lasts.

Tout dépassement de la date de 31 décembre 2003, prévue pour la livraison du bâtiment de base, entraîne une pénalité: aussi longtemps que le retard persiste, l'ancien loyer n'est pas remplacé par la nouvelle annuité.


It's on the aspect of the Minister of the Environment's capacity to delay a project, given that he or she may deem it to be problematic, and have that delay last for a period of 14 days.

Il concerne le pouvoir qu'a le ministre de l'Environnement de retarder un projet, étant donné qu'il pourrait le juger problématique, pour un délai de 14 jours.


w