Boost Your Productivity!Translate documents (Ms-Word, Ms-Excel, ...) faster and better thanks to artificial intelligence!
https://pro.wordscope.com
https://blog. wordscope .com
Abnormal risk
Absolute risk
Aggravated risk
Audit risk
Bad risk
CDCIR
Centre for documention on industrial risks
Community Documentation Centre on Industrial Risk
Community documentation centre on industrial risks
Company-specific risk
Credit risk
Cross currency exchange risk
Currency exposure
Currency risk
Default risk
Diversifiable risk
ERM
Enterprise risk management
Exchange rate risk
Exchange risk
Explosion hazard
Explosion risk
Financial risk
Fire danger
Fire hazard
Fire risk
Firm-specific risk
Foreign currency exposure
Foreign currency risk
Foreign exchange rate risk
Foreign exchange risk
Idiosyncratic risk
Impaired life
Impaired risk
Increased risk
Industrial hazard
Interest rate risk
Joint risk
Liquidity risk
Loan risk
Macroprudential risk
Market risk
Overall audit risk
Overall risk
Residual risk
Risk analysis
Risk assessment
Risk management
Risk of explosion
Sovereign risk
Specific risk
Substandard life
Substandard risk
Systematic risk
Systemic risk
Technological risk
Toxic hazard
Toxic risk
Ultimate audit risk
Ultimate risk
Under average life
Under average risk
Unique risk
Unsystematic risk

Vertaling van "documentation risk " (Engels → Frans) :

TERMINOLOGIE
Centre for documention on industrial risks | Community Documentation Centre on Industrial Risk | CDCIR [Abbr.]

centre de documentation sur les risques industriels


financial risk [ credit risk | default risk | exchange risk | foreign exchange rate risk | interest rate risk | liquidity risk | loan risk | macroprudential risk | market risk | sovereign risk | systematic risk | systemic risk ]

risque financier [ risque de change | risque de crédit | risque de défaillance | risque de liquidité | risque de marché | risque de taux d'intérêt | risque macroprudentiel | risque souverain | risque systématique | risque systémique ]


risk management [ enterprise risk management | ERM | risk analysis | risk assessment | risk assessment(UNBIS) ]

gestion du risque [ analyse du risque | évaluation du risque | gestion des risques | gestion du risque d’entreprise ]


industrial hazard [ explosion hazard | explosion risk | fire danger | fire hazard | fire risk | risk of explosion | technological risk | toxic hazard | toxic risk ]

risque industriel [ risque d'explosion | risque d'incendie | risque technologique | risque toxique ]


company-specific risk | diversifiable risk | idiosyncratic risk | residual risk | unsystematic risk

risque résiduel


Community documentation centre on industrial risks

Centre communautaire de documentation sur les risques industriels


substandard risk [ impaired risk | under average risk | abnormal risk | impaired life | increased risk | substandard life | under average life | bad risk | aggravated risk ]

risque aggravé


audit risk [ overall audit risk | ultimate audit risk | absolute risk | overall risk | ultimate risk | joint risk ]

risque d'audit [ risque de mission de vérification | risque lié à la vérification | risque global | risque ultime | risque de révision ]


unsystematic risk | diversifiable risk | firm-specific risk | idiosyncratic risk | residual risk | specific risk | unique risk

risque spécifique | risque non systématique | risque intrinsèque | risque idiosyncratique | risque diversifiable


foreign exchange risk [ foreign currency risk | foreign currency exposure | exchange rate risk | exchange risk | currency risk | currency exposure | cross currency exchange risk ]

risque de change [ risque de cours de change | risque de cours ]
IN-CONTEXT TRANSLATIONS
1. The investment product manufacturer shall review the information contained in the key information document regularly and shall revise the document where the review indicates that material changes need to be made in accordance with Article 8 , in particular if materially significant changes have been made to the product and in particular with regard to the appreciation of risks or the creation of value in the investment management and relevant risk in the investment management, and make available promptly the revised version.

1. L'initiateur de produits d'investissement réexamine régulièrement le contenu du document d'informations clés et révise ledit document lorsque ce réexamen montre que des modifications significatives sont nécessaires conformément à l'article 8, en particulier si des changements véritablement significatifs ont été apportés au produit, et notamment en ce qui concerne l'appréciation des risques ou la création de valeur dans la gestion de l'investissement et de risques pertinents dans la gestion de l'investissement, et met rapidement la version révisée à disposition.


1. The investment product manufacturer shall review the information contained in the key information document regularly and shall revise the document where the review indicates that material changes need to be made in accordance with Article 8, in particular if materially significant changes have been made to the product and in particular with regard to the appreciation of risks or the creation of value in the investment management and relevant risk in the investment management, and make available promptly the revised version.

1. L'initiateur de produits d'investissement réexamine régulièrement le contenu du document d'informations clés et révise ledit document lorsque ce réexamen montre que des modifications significatives sont nécessaires conformément à l'article 8, en particulier si des changements véritablement significatifs ont été apportés au produit, et notamment en ce qui concerne l'appréciation des risques ou la création de valeur dans la gestion de l'investissement et de risques pertinents dans la gestion de l'investissement, et met rapidement la version révisée à disposition.


Such policy, risk management measures and arrangements should be clearly described and compiled in the report on major hazards. The report on major hazards should be complementary to the safety and health document referred to in Directive 92/91/EC and it should also include provisions on environmental risk management and emergency plans.

Cette politique et ces mesures et mécanismes de gestion des risques devraient être clairement décrits et figurer dans le rapport sur les dangers majeurs (RDM), lequel devrait compléter le document de sécurité et de santé visé par la directive 92/91/CEE et comprendre également des dispositions relatives à la gestion des risques environnementaux et aux plans d'urgence.


put in place such risk measurement arrangements, processes and techniques as are necessary to ensure that the risks of positions taken and their contribution to the overall risk profile are accurately measured on the basis of sound and reliable data and that the risk measurement arrangements, processes and techniques are adequately documented;

il met en place des dispositions, des procédures et des techniques de mesure des risques suffisantes pour garantir que les risques des positions prises et leur contribution au profil de risque global sont mesurés de manière fiable sur la base de données solides et crédibles et que les dispositions, procédures et techniques de mesure des risques sont documentées d’une manière appropriée;


For more results, go to https://pro.wordscope.com to translate your documents with Wordscope Pro!
That policy should be appropriately documented and should explain, in particular, measures and procedures employed to measure and manage risks, the safeguards for independent performance of the risk management function, the techniques used to manage risks and the details of the allocation of responsibilities within the AIFM for risk management and operating procedures.

Cette politique doit être dûment documentée et doit notamment expliquer les mesures et procédures employées pour mesurer et gérer les risques, les mesures préservant l’indépendance de l’exercice de la fonction de gestion des risques, les techniques de gestion des risques utilisées et les détails de la répartition, au sein du gestionnaire, des responsabilités relatives à la gestion des risques et aux procédures opérationnelles.


75. Notes with satisfaction that the Risk Manager took up his functions on 1 June 2010 and reports directly to the Secretary-General; understands that it is not possible to staff the service fully in 2011 and that the first risk profile is expected to be presented during the first half of 2011 and the approach and strategy for risk management will be developed under the authority of the Secretary-General by summer 2011; expects its competent committee to be fully informed of any new development and strategic document regarding Parliamen ...[+++]

75. constate avec satisfaction que le gestionnaire des risques a pris ses fonctions le 1 juin 2010 et qu'il fait directement rapport au secrétaire général; note qu'il n'est pas possible de doter ce service d'effectifs complets en 2011, que le premier profil de risque devrait être présenté dans le courant du 1 semestre 2011 et que l'approche et la stratégie en matière de gestion des risques seront élaborées sous l'autorité du secrétaire général d'ici l'été 2011; s'attend à ce que sa commission compétente soit pleinement informée de tout nouveau développement et document stratégiq ...[+++]


‘As regards requests for access to European Systemic Risk Board documents, Decision ESRB/2011/5 of the European Systemic Risk Board of 3 June 2011 on public access to European Systemic Risk Board documents (4), adopted on the basis of Article 7 of Council Regulation (EU) No 1096/2010 of 17 November 2010 conferring specific tasks upon the European Central Bank concerning the functioning of the European Systemic Risk Board (5), shall apply.

«En ce qui concerne les demandes d’accès aux documents du Comité européen du risque systémique, la décision CERS/2011/5 du Comité européen du risque systémique du 3 juin 2011 relative à l’accès du public aux documents du Comité européen du risque systémique (4), adoptée sur le fondement de l’article 7 du règlement (UE) no 1096/2010 du Conseil du 17 novembre 2010 confiant à la Banque centrale européenne des missions spécifiques relatives au fonctionnement du Comité européen du risque systémique (5), est applicable.


It should be built on: (a) draft document ‘SOPs for the HSC Network for the risk assessment and risk management of chemical events’ prepared by the Commission with input from the Chemical, Biological and Radio Nuclear (CBRN) Section of the Health Security Committee (HSC) and which is available as part of the outcomes of the CARRA-NET initiative; (b) input provided by the ‘Chemical and Radiation Risk Assessment Network (CARRA-NET)’ project that started in October 2010 under service contract No EAHC/2010/Health/12 for the implementation of framework contra ...[+++]

Cette action devrait s’appuyer; a) sur le projet de document «POS à l’intention du réseau CSS pour l’évaluation et la gestion des risques liés aux incidents chimiques», préparé par la Commission, avec la participation du groupe du comité de sécurité sanitaire (CSS) chargé des risques chimiques, biologiques, radiologiques et nucléaires (CBRN), dans le contexte de l’initiative CARRA-NET; b) sur les résultats du projet CARRA-NET (Chemical and Radiation Risk Assessment Network — ) lancé en octobre 2010 au titre du marché de services no ...[+++]


except where the risk identified in course of the risk assessment procedures referred to in point (b) is negligible, risk mitigation procedures which consist of a set of measures and procedures that are adequate and proportionate to minimise effectively that risk and which may include requiring additional information or documents and/or requiring third party verification.

sauf si le risque identifié au cours des procédures d’évaluation du risque visées au point b) est négligeable, les procédures d’atténuation du risque, qui consistent en une série de mesures et de procédures adéquates et proportionnées pour réduire effectivement le plus possible ledit risque et qui peuvent inclure l’exigence d’informations ou de documents complémentaires et/ou l’exigence d’une vérification par une tierce partie.


The conclusions are that with regard to consumers there is no need for risk reductions measures beyond those already applied, but that there is a need for limiting the risks to worker involved in the manufacture of Bisphenol A, the manufacture of epoxy resins and in all occupational exposure scenarios where there is the potential for skin contact with high concentrations of Bisphenol A. As the risk assessment and the risk reduction strategy were not formally adopted under Council Regulation 793/93 (EEC), which was repealed on 1 June 2008, the Member State Rapporteur, in accordance with Article 136 (3) of REACH, has to submit all ...[+++]

Les conclusions sont les suivantes: en ce qui concerne les consommateurs, il n’y a pas de mesures de réduction des risques nécessaires au-delà de celles qui sont déjà appliqués, mais il est nécessaire de limiter les risques pour les employés impliqués dans la fabrication du bisphénol A, la fabrication des résines époxy et dans tous les scénarios d’exposition professionnelle où existent la possibilité de contacts cutanés avec des concentrations élevées de bisphénol A. L’évaluation des risques et la stratégie de réduction des risques n’ayant pas été formellement adoptées en application du règlement du Conseil 793/93 (CEE), abrogé le 1 juin 2008, le rapporteur de l’État membre, en application de l’article 136, paragraphe 3, de REACH, doit soumettre ...[+++]




datacenter (1): www.wordscope.be (v4.0.br)

'documentation risk' ->

Date index: 2022-06-02
w