Boost Your Productivity!Translate documents (Ms-Word, Ms-Excel, ...) faster and better thanks to artificial intelligence!
https://pro.wordscope.com
https://blog. wordscope .com
Bare finish worsted
Cocked finish
Coordinate finishing room for footwear manufacturing
Coordinate finishing room in footwear manufacturing
Coordinate footwear finishing room
Dipped finish
Finish-to-finish
Finish-to-finish link
Finishing straight
Hammer
Hand lasting craftsman
Hand lasting operator
Hand lasting technician
Hard finish worsted
Home straight
Last delivery
Last dialed number recall
Last number recall
Last number redial
Last number repeat
Last rock
Last seen area
Last seen point
Last seen spot
Last stone
Last straight
Last-seen area
Manual lasting operator
Napless finish worsted
Operate CAD software for lasts
Pileless finish worsted
Set-over finish
Slack finish
Tilted finish
Use CAD for lasts
Use computer-aided design for lasts
Victim's last seen point

Traduction de «finished last » (Anglais → Français) :

TERMINOLOGIE
voir aussi les traductions en contexte ci-dessous
finishing straight [ home straight | last straight ]

ligne droite d'arrivée [ droite d'arrivée | dernier droit ]


last seen point [ last seen area | last-seen area | last seen spot | victim's last seen point ]

dernier point de disparition [ dernier point observé ]


cocked finish | dipped finish | set-over finish | slack finish | tilted finish

bague défore


operate CAD software for lasts in the footwear industry | use computer-aided design for lasts | operate CAD software for lasts | use CAD for lasts

utiliser la CAO pour réaliser des formes à monter


hand lasting technician | manual lasting operator | hand lasting craftsman | hand lasting operator

monteur à la main | monteur à la main/monteuse à la main | monteuse à la main


last number redial | last number recall | last dialed number recall | last number repeat

recomposition automatique du dernier numéro | recomposition du dernier numéro | rappel automatique du dernier numéro | rappel du dernier numéro composé | rappel du dernier numéro | répétition du dernier numéro composé | fonction bis


finish-to-finish | finish-to-finish link

dépendance de fin à fin


bare finish worsted | hard finish worsted | napless finish worsted | pileless finish worsted

apprêt rasé


coordinate finishing room for footwear manufacturing | organise finishing room activities in footwear manufacturing | coordinate finishing room in footwear manufacturing | coordinate footwear finishing room

coordonner un atelier de finition dans la production d’articles chaussants


hammer [ last rock | last stone | last delivery ]

marteau [ dernière pierre | dernier lancer ]
TRADUCTIONS EN CONTEXTE
Following a technical evaluation, the financial evaluation of 12 projects was completed in 2001 and that of the last three projects (Intourism, Tommy and Toursax) will be finished during 2002.

Après l'évaluation technique de ceux-ci, l'évaluation financière de douze projets a été complétée en 2001; l'évaluation financière des trois derniers projets (Intourism, Tommy et Toursax) sera terminée dans le courant de 2002.


Thus I have arrived at the point where I finished last night and I am continuing today.

J'en arrive au point où je me suis interrompu hier, et je vais maintenant poursuivre.


I've been consulting with CAVEAT and Victims of Violence to help facilitate this committee, and I finally got it finished last night.

J'ai consulté CAVEAT et Victimes de violence, pour aider le comité, et je n'ai vraiment terminé le mémoire qu'hier soir.


Mrs. Karen Kraft Sloan: The national advisory group was finished last year?

Mme Karen Kraft Sloan: Le groupe consultatif national a-t-il été dissout l'année dernière?


For more results, go to https://pro.wordscope.com to translate your documents with Wordscope Pro!
The pre-study, honourable senators, had a report, which we finished last week, after two or three weeks of five meetings per week.

Honorables sénateurs, l'étude préalable a débouché sur un rapport que nous avons complété la semaine dernière, après deux ou trois semaines à cinq réunions par semaine.


Assessment and verification: the applicant shall provide a calculation of the total use of VOCs during final shoe production, together with supporting data, test results and documentation as appropriate, with the calculation made using EN 14602 (Registration of purchased leather, adhesives, finishes and production of footwear during at least the last six months is required.)

Évaluation et vérification: le demandeur doit préciser la quantité totale de COV utilisée au cours de la production finale des chaussures, calculée à l’aide de la méthode EN 14602, et présenter des données complémentaires, des résultats d’essais et des documents justificatifs, suivant le cas (les achats de cuir, de colles et de produits de finition ainsi que la production d’articles chaussants au cours des six derniers mois au moins doivent être consignés).


Crude oil and NGLs should be reported as coming from the country of ultimate origin; refinery feedstocks and finished products should be reported as coming from the country of last consignment.

Le pétrole brut et les LGN doivent être indiqués comme provenant du pays de première origine; pour les produits d'alimentation des raffineries et les produits finis, c'est le dernier pays de provenance qui est pris en considération.


For an investigational medicinal product, sufficient samples of each batch of bulk formulated product and of key packaging components used for each finished product batch shall be retained for at least two years after completion or formal discontinuation of the last clinical trial in which the batch was used, whichever period is the longer.

Dans le cas d'un médicament expérimental, des échantillons suffisants de chaque lot de produits formulés en vrac et des principaux éléments de l'emballage utilisé pour chaque lot de produits finis sont conservés pendant au moins deux années après l'achèvement ou l'interruption officielle du dernier essai clinique dans lequel le lot a été utilisé si ce délai est plus long.


Objective 2 shows an implementation rate lower than Objective 1 because programming under Objective 2 did not finished until 2002 with the adoption of the last programmes and the Commission's reception of the programming complements.

L'objectif 2 affiche un taux d'exécution inférieur à celui de l'objectif 1, car sa programmation ne s'est achevée qu'en 2002 avec l'adoption des derniers programmes et la réception, par la Commission, des compléments de programmation.


We approved the construction of a tunnel between Centre Block and the East Block so that even in winter, tourists can visit the historic 1910 wing that was finished last year.

Nous avons approuvé la construction d'un tunnel entre l'édifice du Centre et l'édifice de l'Est pour que même en hiver, les touristes puissent visiter l'aile historique de 1910 qui a été parachevée l'an dernier.




datacenter (1): www.wordscope.be (v4.0.br)

'finished last' ->

Date index: 2023-03-10
w