45 (1) When a deviation, change or alteration is required by a company to be made in its pipeline, or any portion of that pipeline, as already constructed or as merely located and approved, a plan, profile and book of reference of the portion of the pipeline proposed to be changed, showing the deviation, change or alteration proposed to be made, shall be submitted for the approval of the Board.
45 (1) La compagnie qui doit modifier ou faire dévier le pipeline qu’elle a construit, ou dont le tracé a déjà été approuvé, doit soumettre à l’Office, pour approbation, les plan, profil et livre de renvoi de la partie à modifier, en y indiquant la déviation ou modification projetée.