Boost Your Productivity!Translate documents (Ms-Word, Ms-Excel, ...) faster and better thanks to artificial intelligence!
https://pro.wordscope.com
https://blog. wordscope .com
Asphalt prepared roofing
Asphalt roll roofing
Asphalt rolled-strip roofing
Asphaltic felt
Cold-process roofing
Double-ridged roof
Establish green roof
Establishing vegetation on roof
Green roof establishing
Lay non-interlocking roof tiles
Laying of non-interlocking roof tiles
Mend roof
NOT
NOT circuit
NOT element
NOT gate
NOT operator
Negation gate
Negator
Non-interlocking roof tile laying
North-light roof
Northlight roof
Not circuit
Not element
Not gate
Not-circuit
Not-element
Perform roof maintenance
Performing roof maintenance
Prepared roofing
Repair roofs
Roll roofing
Rolled roofing
Rolled strip roofing
Roof base
Roof deck
Roof lift arm
Roof not used as a walking deck
Roof substrate
Roof substructure
Roof support beam
Roof suspension arm
Roof swing
Roof tiling
Roof-rotating mechanism
Roof-swinging mechanism
Roofing felt
Sanded bituminous felt
Saturated felt
Saw-tooth roof
Sawteeth roof
Sawtooth roof
Self-finished roofing felt
Shed roof
Vegetation on roof establishing

Vertaling van "not roofs " (Engels → Frans) :

TERMINOLOGIE
green roof establishing | vegetation on roof establishing | establish green roof | establishing vegetation on roof

installer une toiture végétalisée


roof base | roof deck | roof substrate | roof substructure

toiture


laying of non-interlocking roof tiles | non-interlocking roof tile laying | lay non-interlocking roof tiles | roof tiling

poser des tuiles non mécaniques


mend roof | performing roof maintenance | perform roof maintenance | repair roofs

entretenir une toiture


roof swing | roof-rotating mechanism | roof-swinging mechanism

pivotement de la voûte | rotation de la voûte | vérin de pivotement de la voûte | vérin de rotation de la voûte


roof lift arm | roof support beam | roof suspension arm

grue porte-voûte | portique porte-voûte | potence de voûte




NOT element [ negator | negation gate | NOT gate | NOT circuit | not circuit | not-circuit | NOT operator | not-element | NOT | not element | not gate ]

porte NON [ porte non | circuit NON | circuit non ]


asphalt prepared roofing [ asphalt roll roofing | asphalt rolled-strip roofing | asphaltic felt | cold-process roofing | prepared roofing | roll roofing | rolled roofing | rolled strip roofing | roofing felt | sanded bituminous felt | saturated felt | self-finished roofing felt ]

rouleau asphalté [ matériau à couverture en rouleau | papier toiture en rouleaux ]


sawtooth roof | saw-tooth roof | sawteeth roof | northlight roof | north-light roof | shed roof | double-ridged roof

toiture à redans | toiture à redents | toit à redents | toit à redans | comble à redents | shed
IN-CONTEXT TRANSLATIONS
For a new version of a vehicle in which the solar roof panel is installed the baseline vehicle should be the vehicle in which the solar roof panel is disconnected and the change in mass due to the installation of the solar roof is taken into account.

Pour une nouvelle version d'un véhicule équipé du toit solaire, le véhicule de base devrait être un véhicule dont le panneau de toit solaire est débranché et dont la modification de la masse résultant de l'installation du toit solaire a été prise en compte.


‘contactable edges’ means edges which can be contacted by the surface of a testing apparatus and can consist of structures, elements or components located anywhere in the vehicle, including but not limited to the passenger compartment floor, sides, doors, windows, roof, roof pillars, roof ribs, sun visors, instrument panel, steering control, seats, head restraints, safety belts, levers, knobs, covers, compartments and lights;

123) «bords susceptibles d’être touchés»: les bords qui peuvent être touchés par la surface d’un appareil d’essai et peuvent être des structures, éléments ou composants situés à n’importe quel endroit du véhicule, notamment le plancher, les côtés, les portières, les vitres, le toit, les montants de toit, les nervures de toit, les pare-soleil, le tableau de bord, la commande de direction, les sièges, les appuie-tête, les ceintures de sécurité, les leviers, les poignées, les couvercles, les compartiments et les dispositifs d’éclairage de l’habitacle;


Clay roofing tiles as defined in EN 1304:2005 excluding blue braised roof tiles and accessories.

Tuiles en terre cuite telles que définies dans la norme EN 1304:2005, excepté les tuiles «bleu fumé» et les accessoires.


Clay roofing tiles as defined in EN 1304:2005 excluding blue braised roof tiles and accessories

Tuiles en terre cuite telles que définies dans la norme EN 1304:2005, excepté les tuiles «bleu fumé» et les accessoires.


For more results, go to https://pro.wordscope.com to translate your documents with Wordscope Pro!
At least 50 % of campsite buildings which have suitable roofs (flat roofs or roofs with a small angle of inclination) and are not used for other purposes, shall be grassed or planted.

Au moins 50 % des bâtiments du camping qui s’y prêtent (bâtiments avec un toit plat ou faiblement incliné) et qui ne sont pas utilisés à d’autres fins ont un toit recouvert d’herbe ou d’autres végétaux.


At least 50 % of the tourist accommodation building(s) which have suitable roofs (flat roofs or roofs with a small angle of inclination) and are not used for other purposes, shall be grassed or planted.

Au moins 50 % des bâtiments du lieu d’hébergement touristique qui s’y prêtent (bâtiments avec un toit plat ou faiblement incliné) et qui ne sont pas utilisés à d’autres fins ont un toit recouvert d’herbe ou d’autres végétaux.


in the case of a solar photovoltaic or solar thermal installer: training as a plumber or electrician and have plumbing, electrical and roofing skills, including knowledge of soldering pipe joints, gluing pipe joints, sealing fittings, testing for plumbing leaks, ability to connect wiring, familiar with basic roof materials, flashing and sealing methods as a prerequisite; or

pour les installateurs de systèmes solaires photovoltaïques ou solaires thermiques: une formation préalable de plombier ou d’électricien et des compétences en plomberie, en électricité et en matière de couverture (notamment connaissance de l’assemblage par brasage, de l’assemblage par collage, du scellement d’accessoires, des essais d’étanchéité, aptitude à connecter des fils de câblage, bonne connaissance des matériaux de base pour la couverture, ainsi que des méthodes de pose de solins d’étanchéité et de calfeutrement); ou


At least 50 % of the tourist accommodation building(s) which have suitable roofs (flat roofs or roofs with a small angle of inclination) and are not used for other purposes, shall be grassed or planted.

Au moins 50 % des bâtiments du lieu d’hébergement touristique qui s’y prêtent (bâtiments avec un toit plat ou faiblement incliné) et qui ne sont pas utilisés à d’autres fins ont un toit recouvert d’herbe ou d’autres végétaux.


At least 50 % of campsite buildings which have suitable roofs (flat roofs or roofs with a small angle of inclination) and are not used for other purposes, shall be grassed or planted.

Au moins 50 % des bâtiments du camping qui s’y prêtent (bâtiments avec un toit plat ou faiblement incliné) et qui ne sont pas utilisés à d’autres fins ont un toit recouvert d’herbe ou d’autres végétaux.


1.3.4.The pendulum block shall be pulled back so that the height of its centre of gravity above that at the point of impact is given by one of the following two formulae, to be chosen according to the reference mass of the tractors subjected to the tests:H = 25 + 0,20 mt for tractors with a reference mass of less than 2 000 kilograms,H = 125 + 0,15 mt for tractors with a reference mass of more than 2 000 kilograms.The pendulum block must then be released so as to strike the protection structure.1.4.Crushing at the rearThe beam shall be positioned over the rear uppermost structural member(s) and the resultant of the crushing forces shall be located in the tractor's median plane.A force, Fv = 20 mt shall be applied.Where the rear part of the protection ...[+++]

1.3.4.Le mouton pendule doit être tiré vers l'arrière de façon que la hauteur de son centre de gravité dépasse celle qu'il aura au point d'impact d'une valeur donnée par l'une des deux formules suivantes à choisir en fonction de la masse de référence des tracteurs soumis aux essais:H = 25 + 0,20 mt pour les tracteurs d'une masse de référence inférieure à 2 000 kg,H = 125 + 0,15 mt pour les tracteurs d'une masse de référence supérieure à 2 000 kg.On lâche ensuite le mouton pendule qui vient heurter le dispositif de protection.1.4.Écrasement à l'arrièreLa poutre doit être placée sur la (les) traverse(s) supérieure(s) la (les) plus à l'arri ...[+++]


w