Boost Your Productivity!Translate documents (Ms-Word, Ms-Excel, ...) faster and better thanks to artificial intelligence!
https://pro.wordscope.com
https://blog. wordscope .com

Vertaling van "proposed runways 09-27 " (Engels → Frans) :

(a) the strip surface associated with proposed runway 09-27 is 1 062 m in total width, being 531 m on either side of the centre line of the proposed runway.

a) la surface de bande associée à la piste proposée 09-27 est d’une largeur totale de 1 062 m, soit 531 m de chaque côté de l’axe de la piste proposée.


The take-off/approach surfaces, shown on the Pickering Airport Site Zoning Plan No. 18-001 02-041, Sheets 4, 5, 9 to 25 and 29, dated October 30, 2002, are surfaces abutting each end of the strip surfaces associated with proposed runways 09-27, 14-32, 08C-26C, 08L-26R and 08R-26L, and are described as follows:

Les surfaces de décollage/d’approche, figurant sur le plan de zonage de la zone aéroportuaire de Pickering n 18-001 02-041, feuilles 4, 5, 9 à 25 et 29, daté du 30 octobre 2002, sont des surfaces attenantes à chacune des extrémités des surfaces de bandes associées aux pistes proposées 09-27, 14-32, 08C-26C, 08L-26R et 08R-26L, et sont décrites comme suit :


(a) the take-off/approach surface abutting the end of the strip surface associated with the approach to proposed runway 09, consisting of an inclined surface having a ratio of 1 m measured vertically to 60 m measured horizontally rising to an imaginary line drawn at right angles to the projected centre line of the strip surface and distant 3 000 m measured horizontally from the end of the strip surface; thence continuing upward at a ratio of 1 m measured vertically to 50 m measured horizontally, rising to the outer edge of the take-off/approach surface drawn at right angles to the projected centre line of the strip ...[+++]

a) la surface de décollage/d’approche attenante à l’extrémité de la surface de bande associée à l’approche de la piste proposée 09 consiste en une surface inclinée à raison de 1 m suivant la verticale pour 60 m suivant l’horizontale jusqu’à une ligne imaginaire tracée à angle droit par rapport au prolongement de l’axe de la surface de bande et à une distance suivant l’horizontale de 3 000 m à partir de l’extrémité de la surface de bande; de là, elle se prolonge vers le haut à raison de 1 m suivant la verticale pour 50 m suivant l’horizontale jusqu’à la limite extérieure de la surface de décollage/d’approche tracée à angle droit par rapp ...[+++]


[14] The Ideas work programme C(2007)4467 of 02.10.07 and the ERC Rules for Submission of proposals C(2007)4429 of 27.09.2007 were modified, to include a provision for the reimbursement of the travel expenses of the applicants invited to interviews with the ERC Panel in Brussels.

[14] Le programme de travail «Idées» C (2007) 4467 du 2.10.2007 et les règles du CER relatives à la soumission de propositions C (2007) 4429 du 27.9.2007 ont été modifiées par l'insertion d'une disposition concernant le remboursement des frais de voyage des candidats invités à une entrevue avec un panel du CER à Bruxelles.




(b) the take-off/approach surface abutting the end of the strip surface associated with the approach to proposed runway 27, consisting of an inclined surface having a ratio of 1 m measured vertically to 60 m measured horizontally rising to an imaginary line drawn at right angles to the projected centre line of the strip surface and distant 3 000 m measured horizontally from the end of the strip surface; thence continuing upward at a ratio of 1 m measured vertically to 50 m measured horizontally, rising to the outer edge of the take-off/approach surface drawn at right angles to the projected centre line of the strip ...[+++]

b) la surface de décollage/d’approche attenante à l’extrémité de la surface de bande associée à l’approche de la piste proposée 27 consiste en une surface inclinée à raison de 1 m suivant la verticale pour 60 m suivant l’horizontale jusqu’à une ligne imaginaire tracée à angle droit par rapport au prolongement de l’axe de la surface de bande et à une distance suivant l’horizontale de 3 000 m à partir de l’extrémité de la surface de bande; de là, elle se prolonge vers le haut à raison de 1 m suivant la verticale pour 50 m suivant l’horizontale jusqu’à la limite extérieure de la surface de décollage/d’approche tracée à angle droit par rapp ...[+++]


The azimuth of the centreline from threshold 07R to threshold 25L is 57°56′36″. Threshold 07R has grid coordinates of 447 897.32 E and 5 016 543.09 N and threshold 25L has grid coordinates of 449 963.64 E and 5 017 837.10 N. There are no additional points between thresholds, along proposed runway 07R-25L, that control the elevation of the proposed runway centreline;

Les coordonnées du quadrillage du seuil 07R sont 447 897,32 E. et 5 016 543,09 N. et celles du seuil 25L sont 449 963,64 E. et 5 017 837,10 N. Il n’existe aucun autre point entre les seuils, le long de la piste proposée 07R-25L, où est déterminée l’altitude de l’axe de la piste proposée.


[14] The Ideas work programme C(2007)4467 of 02.10.07 and the ERC Rules for Submission of proposals C(2007)4429 of 27.09.2007 were modified, to include a provision for the reimbursement of the travel expenses of the applicants invited to interviews with the ERC Panel in Brussels.

[14] Le programme de travail «Idées» C (2007) 4467 du 2.10.2007 et les règles du CER relatives à la soumission de propositions C (2007) 4429 du 27.9.2007 ont été modifiées par l'insertion d'une disposition concernant le remboursement des frais de voyage des candidats invités à une entrevue avec un panel du CER à Bruxelles.


− the rationale of the proposed Directive embedded in the Commission’s Communication on Preventing and Combating Corporate and Financial Malpractice from 27.09.2004 (COM(2004)611 final).

- le raisonnement de la proposition de directive s'inscrit dans la ligne de la communication de la Commission intitulée "Prévenir et combattre les malversations financières et pratiques irrégulières des sociétés" du 27.09.2004 (COM(2004)611 final).




datacenter (1): www.wordscope.be (v4.0.br)

'proposed runways 09-27' ->

Date index: 2024-12-13
w