Boost Your Productivity!Translate documents (Ms-Word, Ms-Excel, ...) faster and better thanks to artificial intelligence!
https://pro.wordscope.com
https://blog. wordscope .com
Apply principles of Pilates training
Combine principles for training in Pilates
Combined speed indicator
European high-speed rail network
European high-speed train network
European network of high speed trains
HST
High speed
High speed train
High-speed train
High-speed transport
Integrate Pilates principles in training
Integrate principles of Pilates training
Low-speed train
Rapid-transit railway
Speed training
Ultra-fast train
Ultra-high-speed train

Vertaling van "speed train combined " (Engels → Frans) :

TERMINOLOGIE
high-speed transport [ high speed | high-speed train | rapid-transit railway | high-speed train(GEMET) ]

transport à grande vitesse [ grande vitesse | TGV | train à grande vitesse ]


European high-speed rail network | European high-speed train network | European network of high speed trains

réseau européen de trains à grande vitesse | réseau européen TGV


apply principles of Pilates training | integrate Pilates principles in training | combine principles for training in Pilates | integrate principles of Pilates training

intégrer les principes de l'entraînement de Pilates


high-speed train [ HST | high speed train ]

train à grande vitesse


European high-speed rail network | European high-speed train network

réseau européen de trains à grande vitesse


ultra-high-speed train [ ultra-fast train ]

train ultra-rapide








combined speed indicator

anémomachmètre (1) | anémo-machmètre (2)
IN-CONTEXT TRANSLATIONS
The new specific projects are: (1) the Galileo global navigation and positioning satellite system, (2) the high-capacity rail link across the Pyrenees, (3) the Stuttgart-Munich-Salzburg/Linz-Vienna high-speed train/combined transport project for Eastern Europe, (4) the Danube river improvement between Vilshofen and Straubing, (5) high-speed rail interoperability on the Iberian peninsula and (6) the Fehmarn Belt fixed link between Germany and Denmark.

Ces nouveaux projets spécifiques sont: (1) le système mondial Galileo de navigation et de positionnement par satellite; (2) la liaison ferroviaire à haute capacité pour la traversée des Pyrénées; (3) le projet de train à grande vitesse/transport combiné sur les axes Stuttgart-Munich-Salzbourg/Linz-Vienne pour l'Europe orientale; (4) l'amélioration de la navigabilité du Danube entre Vilshofen et Straubing; (5) l'interopérabilité ferroviaire à grande vitesse sur la péninsule ibérique; (6) la liaison fixe sur le Fehmarn Belt entre l'Allemagne et le Danemark.


PP6 (High-speed train/combined transport: France-Italy Lyons - Turin): a treaty committing France and Italy to build the section by 2015 was signed in Turin on 29 January 2001.

PP6 (train à grande vitesse/transport combiné: France-Italie, Lyon-Turin): un traité engageant la France et l'Italie à construire ce tronçon d'ici 2015 a été signé à Turin le 29 janvier 2001.


launching new priority projects, such as the Stuttgart-Munich-Salzburg/Linz-Vienna TGV/combined transport link, the Fehmarn Belt linking Denmark and Germany, improving navigability on the Danube between Straubing and Vilshofen, the Galileo radionavigation project, the Iberian high-speed train network and addition of the Verona-Naples and Bologna-Milan rail links plus extension of the southern European TGV network to N?mes in France.

lancer de nouveaux projets prioritaires, tels que TGV/transport combiné Stuttgart-Munich-Salsbourg/Linz-Vienne, Fehmarn reliant le Danemark à l'Allemagne, améliorer la navigabilité du Danube entre Straubing-Vilshofen, le projet de radionavigation Galileo, le réseau TGV ibérique et l'ajout de la ligne ferroviaire Vérone-Naples et Bologne-Milan, et la continuité vers Nîmes du TGV Sud Européen.


The new specific projects are: (1) the Galileo global navigation and positioning satellite system, (2) the high-capacity rail link across the Pyrenees, (3) the Stuttgart-Munich-Salzburg/Linz-Vienna high-speed train/combined transport project for Eastern Europe, (4) the Danube river improvement between Vilshofen and Straubing, (5) high-speed rail interoperability on the Iberian peninsula and (6) the Fehmarn Belt fixed link between Germany and Denmark.

Ces nouveaux projets spécifiques sont: (1) le système mondial Galileo de navigation et de positionnement par satellite; (2) la liaison ferroviaire à haute capacité pour la traversée des Pyrénées; (3) le projet de train à grande vitesse/transport combiné sur les axes Stuttgart-Munich-Salzbourg/Linz-Vienne pour l'Europe orientale; (4) l'amélioration de la navigabilité du Danube entre Vilshofen et Straubing; (5) l'interopérabilité ferroviaire à grande vitesse sur la péninsule ibérique; (6) la liaison fixe sur le Fehmarn Belt entre l'Allemagne et le Danemark.


For more results, go to https://pro.wordscope.com to translate your documents with Wordscope Pro!
PP6 (High-speed train/combined transport: France-Italy Lyons - Turin): a treaty committing France and Italy to build the section by 2015 was signed in Turin on 29 January 2001.

PP6 (train à grande vitesse/transport combiné: France-Italie, Lyon-Turin): un traité engageant la France et l'Italie à construire ce tronçon d'ici 2015 a été signé à Turin le 29 janvier 2001.


6 High Speed Train/Combined Transport France - Italy Lyon-Torino; 11.0000 5.5000 5.5000 ( 50.00% )

6 Train à grande vitesse/transport combiné France - Italie Lyon-Turin; 11.0000 5.5000 5.5000 ( 50,00% )


1. High-speed train/combined transport north-south: Munich-Nuremberg-Erfurt-Halle/Leipzig-Berlin Brenner axis: Napoli-Verona-Munich and Bologna-Milano

Axe du Brenner: Naples‑Vérone‑Munich et Bologne‑Milan – et l'aménagement du TGV Rhin-Rhône Méditerranée par l'axe Francfort / Lyon / Perpignan / Barcelone


As part of a review of the above-mentioned guidelines, the Commission proposed, last year, to include in the list of specific projects the East European combined transport/high speed train link (Stuttgart-Munich-Salzburg/Linz-Vienna), which will be carried out in phases until its completion in 2012.

Dans le cadre de la révision des dites orientations, la Commission a proposé, l’année dernière, d’inclure dans la liste des projets spécifiques le "transport combiné/train à grande vitesse Est-européen : "Stuttgart-Munich-Salzbourg/Linz-Vienne" dont la réalisation s’échelonne jusqu’en 2012.


I regret that the Council is still examining at state level what intermodal terminals should be included in the European combined transport network, and I am delighted by the change to the specific Project No 8 of the Annex relating to the ‘Lisbon-Valladolid motorway’, as it was formerly known, with its new name ‘the Portugal/Spain multimodal link with the rest of Europe’, for the management of rail, road, sea and air connections in the three Iberian corridors between Galicia and Portugal, between Portugal and Seville/Andalusia, and between Irún (in the Basque Country) and Portugal, which I hope will include the TGV ...[+++]

Je regrette que le Conseil continue à envisager, au niveau étatique, d'inclure les terminaux intermodaux dans le réseau européen de transport combiné et je me réjouis de la modification du projet spécifique numéro 8 de l'annexe, relatif à "la liaison autoroutière Lisbonne-Valladolid", appelée à devenir la "liaison multimodale Portugal-Espagne avec le reste de l'Europe", pour la gestion des connexions ferroviaires, par route, maritimes et aériennes dans les trois corridors ibériques entre la Galice et le Portugal, entre le Portugal et Séville/Andalousie et entre Irún (au Pays basque) et le Portugal, qui inclura, je l'e ...[+++]


To facilitate the provision of services, it would be desirable for the sake of legal certainty to provide for an appropriate mechanism; this is not easy to formulate, however, since speed must be combined with certainty that there is no substantial shortfall in the training.

Pour faciliter les prestations de services, il serait souhaitable pour la sécurité juridique de prévoir un mécanisme approprié; sa formulation n'est toutefois pas aisée car il faut concilier rapidité et vérification de l'absence de déficit important dans la formation.




datacenter (1): www.wordscope.be (v4.0.br)

'speed train combined' ->

Date index: 2022-09-29
w