Boost Your Productivity!Translate documents (Ms-Word, Ms-Excel, ...) faster and better thanks to artificial intelligence!
https://pro.wordscope.com
https://blog. wordscope .com
Analyse drill engineering
Analyse drilling performance
Analysing of drill engineering
Analysing of drilling performance
Angle drilling
Dental drill engine
Deviated drilling
Directional drilling
Downhole deviation drilling
Drill engineering monitoring
Drilling
Drilling and completion engineer
Drilling engineer
Drilling rig
Drilling rigs
Drilling technician
Engine room
Evaporator room
Fire room
Galley
Gasfield driller
Hand drill
Jumper
Jumping drill
Laundry
Loading
Machinery
Miner's drill
Offshore drilling
Offshore drilling machinery
Offshore equipment
Offshore structure
Oil platform
Oil rig
Percussion drill
Record drilling
Recording drilling
Report on well drilling
Well drilling

Traduction de «Drilling engineer » (Anglais → Néerlandais) :

TERMINOLOGIE
voir aussi les traductions en contexte ci-dessous
analysing of drill engineering | drill engineering monitoring | analyse drill engineering | report on well drilling

boortechniek analyseren


drilling and completion engineer | gasfield driller | drilling engineer | drilling technician

booropzichter | boormeester | drilling engineer




drilling [ well drilling | Well drilling(ECLAS) ]

boren [ boren van een boorgat ]


angle drilling | deviated drilling | directional drilling | downhole deviation drilling

gericht boren


analyse drilling performance | analysing of drilling performance | record drilling | recording drilling

booractiviteiten registeren


hand drill | jumper | jumping drill | miner's drill | percussion drill

beitel | kroon


offshore structure [ drilling rig | offshore drilling machinery | offshore equipment | oil platform | oil rig | drilling rigs(UNBIS) ]

offshore-installatie [ aardolieplatform | boorplatform | off-shore-installatie | offshoremateriaal ]


accidental poisoning by gases or fumes on ship atomic reactor malfunction in watercraft crushed by falling object on ship excessive heat in:boiler room | engine room | evaporator room | fire room | explosion of boiler on steamship fall from one level to another in watercraft fall on stairs or ladders in watercraft injuries in watercraft caused by:deck | engine room | galley | laundry | loading | machinery | localized fire on ship machinery accident in watercraft

door storing van atoomreactor in vaartuig | explosie van ketel op stoomschip | ongeval met machine op vaartuig | onopzettelijke vergiftiging door gassen of dampen op schip | overmatige hitte in | ketelruim | overmatige hitte in | machinekamer | overmatige hitte in | stookkamer | overmatige hitte in | verdampingskamer | plaatselijk brand op schip | val van ene niveau naar andere op vaartuig | val van trap of ladder op vaartuig | vermorzeld door vallend voorwerp op schip | verwondingen op vaartuig veroorzaakt door | dek | machines | verwondingen op vaartuig veroorzaakt door | kombuis | machines | verwondingen op vaartuig veroorzaakt door | ...[+++]


TRADUCTIONS EN CONTEXTE
Drilling and foundation equipment — Safety — Part 2: Mobile drill rigs for civil and geotechnical engineering, quarrying and mining

Boor- en funderingsuitrusting — Veiligheid — Deel 2: Mobiele boorwerktuigen voor civiele en geotechnische engineering, delfstoffen en mijnbouw


Extraction may give rise to a variety of impacts over time, such as the in early phases by diesel- or natural gas-fuelled engines powering drilling equipment and pumps, and in extraction by pumps and compressors.

De uitlopende fases van de winning brengen uiteenlopende soorten effecten met zich mee. Zo zijn er in de eerste fase door diesel of aardgas aangedreven boormachines en pompen nodig en bij de winning zelf pompen en compressoren.


Includes the following services rendered on a fee or contract basis: advisory and consulting services relating to mining, on-land site preparation, on-land rig installation, drilling, drilling bits services, casing and tubular services, mud engineering and supply, solids control, fishing and downhole special operations, wellsite geology and drilling control, core taking, well testing, wireline services, supply and operation of completion fluids (brines) supply and installation of completion devices, cementing (pressure pumping), stimu ...[+++]

Omvat de volgende diensten verleend voor een vast bedrag op op contractbasis: adviseurs en consulenten met betrekking tot de mijnbouw, het exploitatierijp maken van terreinen, het installeren van booruitrusting, boren, boorkronen, bekledingsbuizen en exploitatiebuizen, modder-engineering en bevoorrading, controle van vaste stoffen, vissen en speciale operaties in de boorput, geologie van de bronnen en boorcontrole, het nemen van bodemmonsters door middel van boren, het testen van bronnen, kabels, bevoorrading met en gebruik van opvulvloeistoffen (pekel), bevoorrading met en installatie van opvulinrichtingen, cementeren (pompen onder druk ...[+++]


CEBO International B.V (Cebo) is active in the processing of different minerals, including bentonite, for several industrial purposes, such as the production of oil and water-based drilling muds or bentonite products used in underground engineering and environmental engineering.

CEBO International B.V (Cebo) houdt zich bezig met de verwerking van verschillende mineralen, met inbegrip van bentoniet, voor een aantal industriële doeleinden, zoals de productie van boorgruis op olie- en waterbasis en bentonietproducten die gebruikt worden voor ondergrondse civiele techniek en milieutechniek.


For more results, go to https://pro.wordscope.com to translate your documents with Wordscope Pro!
Operational requirements including crew communication, drills, training, bridge and engine room operations and security.

· Operationele vereisten, inclusief communicatie met de bemanning, training, opleiding, werking en veiligheid van de brug en de machinekamer.


Operational requirements including crew communication, drills, training, bridge and engine room operations and security.

· Operationele vereisten, inclusief communicatie met de bemanning, training, opleiding, werking en veiligheid van de brug en de machinekamer.


c". Technology" "required" for the "development" or "production" of gas turbine engine components using "laser", water jet, ECM or EDM hole drilling processes to produce holes having any of the following sets of characteristics:

c". technologie" "noodzakelijk" voor de "ontwikkeling" of de "productie" van gasturbinemotoronderdelen met gebruikmaking van "laser"-, waterstraal- of ECM/EDM-procédés voor het boren van gaatjes met één of meer van de volgende reeksen kenmerken:


The barriers of the underground storage site (e.g. the waste quality, engineered structures, back filling and sealing of shafts and drillings), the performance of the host rock, the surrounding strata and the overburden should be quantitatively assessed over the long-term and evaluated on the basis of site-specific data or sufficiently conservative assumptions.

Ten aanzien van de barrières van de ondergrondse opslaglocatie (bijvoorbeeld de kwaliteit van de afvalstoffen, aangelegde structuren, aanaarding en afdichting van schachten en boorgaten), het gedrag van het opberggesteente, de omringende lagen en de deklaag is een kwantitatieve langetermijnbeoordeling nodig op basis van voor de opslagplaats specifieke gegevens of voldoende voorzichtige veronderstellingen.




datacenter (1): www.wordscope.be (v4.0.br)

'Drilling engineer' ->

Date index: 2024-10-10
w