Boost Your Productivity!Translate documents (Ms-Word, Ms-Excel, ...) faster and better thanks to artificial intelligence!
https://pro.wordscope.com
https://blog. wordscope .com
Adjust a temperature gauge
Adjust temperature gauges
Adjusting temperature gauges
Chain gage
Chain gauge
Chain-gage
Chain-gauge
Contact lens radius gauge
Depth gauge operating
Gauge point
Loading gauge
Maximum loading gauge
Measure water depth
Measuring point
Modify temperature gauges
Monitor gauge
Monitor gauges
Monitor metered and associated data
One-stop shop
One-stop-shop
Operate water depth gauge
PSC
Point of single contact
Rail loading gauge
Route loading gauge
Single contact point
Single point of contact
Spectacle lens curvature gauge
Supervise gauge
Tape gauge
Vehicle gauge
Water depth measuring
Wire weight gage
Wire weight gauge
Wire-gage
Wire-gauge

Traduction de «Gauge point » (Anglais → Néerlandais) :

TERMINOLOGIE
voir aussi les traductions en contexte ci-dessous


chain gage | chain gauge | chain-gage | chain-gauge | tape gauge | wire weight gage | wire weight gauge | wire-gage | wire-gauge

kettingpeilmeter


loading gauge | maximum loading gauge | rail loading gauge | route loading gauge | vehicle gauge

laadprofiel | spoorweglaadprofiel | voertuigomgrenzingsprofiel


adjust a temperature gauge | modify temperature gauges | adjust temperature gauges | adjusting temperature gauges

temperatuurmeters afstellen | temperatuurmeters bijstellen


monitor metered and associated data | supervise gauge | monitor gauge | monitor gauges

meter controleren


depth gauge operating | water depth measuring | measure water depth | operate water depth gauge

waterdiepte meten


A line extending from the intersection of the internasal and frontonasal sutures, in the midsagittal plane (nasion) and the junction of frontal bone and nasal bone (a point).

cefalometrische lijn van nasion naar A-punt


Spectacle lens curvature gauge

meter voor brillenglaskromming


Contact lens radius gauge

radiusmeter voor contactlenzen


one-stop shop (nom) | one-stop-shop (nom) | point of single contact (nom) | PSC (nom) | single contact point (nom) | single point of contact (nom)

éénloket (nom neutre) | één-loket (nom neutre) | enig aanspreekpunt (nom neutre) | enig contactpunt (nom neutre) | enig loket (nom neutre) | uniek aanspreekpunt (nom neutre) | uniek contactpunt (nom neutre) | uniek loket (nom neutre)
TRADUCTIONS EN CONTEXTE
actions for inland transport, connections to and the development of multimodal logistics platforms including connections to inland and maritime ports and airports, including automatic gauge-changing facilities, and the development of ports including ice-breaking capacities, as well as interconnecting points, with particular attention being given to rail connections, except in the case of Member States with no rail network.

acties met betrekking tot vervoer over land, verbindingen met en de ontwikkeling van multimodale logistieke platforms, met name verbindingen met binnenhavens, zeehavens en luchthavens, met inbegrip van automatische voorzieningen voor het overschakelen naar een andere spoorbreedte, alsmede de ontwikkeling van havens, met inbegrip van ijsbreekcapaciteit, en punten van interconnectie, vooral met spoorwegen, met uitzondering van lidstaten zonder spoorwegnet.


For rolling stock intended to operate on 1 668 mm track gauge network, the first useful step shall comply with the values defined in point 4.2.2.11.1 (5) Table 9), including the rolling stock designed according interoperable gauges running over 1 668 mm track gauge or running over 1 435 mm on three rail track (1 668 and 1 435).

Voor rollend materieel voor gebruik op een netwerk met een spoorwijdte van 1 668 mm moet de eerste nuttige trede voldoen aan de waarden als gedefinieerd in punt 4.2.2.11.1, punt 5, tabel 9, met inbegrip van het rollend materieel dat ontworpen is volgens interoperabele profielen voor een spoorwijdte van 1 668 mm of 1 435 mm op een drierailig spoor (1 668 en 1 435).


6. Member States may decide time periods and deadlines for the schedule for capacity allocation which are different from those referred to in Article 43(2), point 2(b) of Annex VI and points 3, 4 and 5 of Annex VII if the establishment of international train paths in cooperation with infrastructure managers of third countries on a network whose track gauge is different from the main rail network within the Union has a significant impact on the schedule for capacity allocation in general.

6. De lidstaten kunnen voor het tijdschema voor de capaciteitstoewijzing andere periodes en termijnen dan die welke worden genoemd in artikel 43, lid 2, in bijlage VI, punt 2, onder b), en in bijlage VII, punten 3, 4 en 5, vaststellen indien de vaststelling van internationale treinpaden in samenwerking met de infrastructuurbeheerders van derde landen op een net waarvan de spoorwijdte verschillend is van die van het hoofdspoorwegnet in de Unie aanzienlijke gevolgen heeft voor de capaciteitstoewijzing in het algemeen.


The Agency has prepared a dossier proposing to restrict mercury in the following measuring devices used in industrial and professional (including healthcare) applications: mercury containing barometers, hygrometers, manometers, sphygmomanometers, strain gauges used with plethysmographs, tensiometers, thermometers and other non-electrical thermometric applications, mercury metering devices for the determination of softening point and mercury pycnometers.

Het Agentschap heeft een dossier samengesteld waarin wordt voorgesteld kwik te beperken in volgende meettoestellen voor gebruik in industriële en professionele toepassingen, met inbegrip van toepassingen in de gezondheidszorg: kwikhoudende barometers, hygrometers, manometers, sfygmomanometers, bij plethysmografen gebruikte rekstrookjes, tensiometers, thermometers en andere niet-elektrische thermometrische toepassingen, kwikhoudende meetinrichtingen voor het bepalen van het verwekingspunt en kwikhoudende pyknometers.


For more results, go to https://pro.wordscope.com to translate your documents with Wordscope Pro!
Member States may decide time periods and deadlines for the schedule for capacity allocation different from those referred to in Article 43(2), Annex VIII point 4(b) and Annex IX points 3, 4 and 5, for international train paths to be established in cooperation with infrastructure managers from third countries on a network whose track gauge is different from the main rail network within the Union.

Lidstaten kunnen andere perioden en tijdslimieten voor wat betreft het tijdschema voor capaciteitstoewijzing dan die zijn voorzien in artikel 43, lid 2, bijlage VIII, punt 4, onder b), en bijlage IX, punt 3, 4 en 5, vaststellen, met betrekking tot internationale treinpaden die moeten worden toegewezen in samenwerking met de infrastructuurbeheerders van derde landen op een net met een andere spoorbreedte dan het hoofdspoornet in de Unie.


Member States may decide time periods and deadlines for the schedule for capacity allocation different from those referred to in Article 43(2), Annex VIII point 4(b) and Annex IX points 3, 4 and 5, for international train paths to be established in cooperation with infrastructure managers from third countries on a network whose track gauge is different from the main rail network within the Union.

Wat het tijdschema voor de capaciteitstoewijzing betreft, kunnen de lidstaten andere perioden en tijdslimieten dan degene waarin is voorzien in artikel 43, lid 2, bijlage VIII, punt 4, onder b), en bijlage IX, punt 3, 4 en 5, vaststellen, in het geval van internationale treinpaden die moeten worden toegewezen in samenwerking met de infrastructuurbeheerders van derde landen op een net met een andere spoorbreedte dan het hoofdspoornet in de Unie.


All performance levels and specifications of the present TSI are given for lines built with the standard European track gauge, as defined in Point 4.2.2 for lines complying with the present TSI.

Het geheel van prestaties en specificaties van de onderhavige TSI is van toepassing op interoperabele lijnen met de Europese standaardspoorwijdte bepaald in punt 4.2.2.


36. Calls, with a view to the forthcoming revision of the guidelines for the development of the trans-European transport network, for the accelerated, priority development and improvement of the high-capacity north-south and east-west rail corridors and intermodal inland terminals in accordance with the Trans-European Network (TEN) and Transport Infrastructure Needs Assessment (TINA) plans, in order to support the revitalisation of the railways within the European Union and promote links with the applicant countries and the Europe-Mediterranean free trade area; points out that that the large number of different ...[+++]

36. stelt, gezien de aanstaande herziening van de richtsnoeren voor de ontwikkeling van het trans-Europese vervoersnetwerk voor om in het Europese spoorwegvervoer in versneld tempo noord-zuid- en oost-westcorridors met een grote capaciteit en intermodale inlandterminals te creëren, die in het kader van de TEN- en TINA-projecten prioriteit moeten krijgen, teneinde de revitalisering van de spoorwegen binnen de Europese Unie te bevorderen en te zorgen voor betere verbindingen met de kandidaat-lidstaten en met de Euromediterrane vrijhandelszone; wijst erop dat na de uitbreiding met de nieuwe lidstaten in de EU nog meer verschillende spoorbreedtes zullen bestaan dan nu reeds het geval is, en dringt ...[+++]


To gauge the effectiveness of structural assistance, Community measures must be assessed beforehand (ex ante), at the midterm point, and after the event (ex post). Midterm evaluation is the responsibility of the Member States but organised by the managing authority; it must be carried out by an independent assessor (Article 42).

Om de doeltreffendheid van structuurmaatregelen te kunnen bepalen, wordt het optreden van de Gemeenschap ex ante, halverwege de looptijd een expost geëvalueerd. De evaluatie halverwege valt onder de verantwoordelijkheid van de lidstaten, maar wordt door de beheersautoriteit georganiseerd en moet worden uitgevoerd door een onafhankelijke beoordelaar (art. 42).


In cases relating to the loading gauge, track gauge, or minimum track centre distance, as referred to in point (b), the Committee shall deliver its opinion within two months.

In de bij sub b) bedoelde gevallen waarin het profiel, de spoorbreedte of de asafstand tussen de sporen in het geding is, dient het comité binnen een termijn van twee maanden advies uit te brengen;




datacenter (1): www.wordscope.be (v4.0.br)

'Gauge point' ->

Date index: 2022-02-12
w