Boost Your Productivity!Translate documents (Ms-Word, Ms-Excel, ...) faster and better thanks to artificial intelligence!
https://pro.wordscope.com
https://blog. wordscope .com
Analyse flood risks
Evaluating risks and hazards in aquaculture facilities
Flood risk
Floods Directive
Identify flood risks
Identify risk of flooding
Identify risks in aquaculture facilities
Identify risks of flooding
Identify risks of ship activities
Identify risks of vessel activities
Identify risks of vessel operations
Mapping of the risk of flooding
Recognise risks of ship activities
Risk of flooding

Traduction de «Identify risks flooding » (Anglais → Néerlandais) :

TERMINOLOGIE
voir aussi les traductions en contexte ci-dessous
analyse flood risks | identify risks of flooding | identify flood risks | identify risk of flooding

risico op overstromingen identificeren | risico op overstromingen inschatten | risico op overstromingen vaststellen


evaluating risks and hazards in aquaculture facilities | identifying risks and hazards in aquaculture facilities | identify risks in aquaculture facilities | identify risks in aquaculture facilities

risico’s in aquacultuurvoorzieningen identificeren | risico's in aquacultuurvoorzieningen vaststellen


identify risks of vessel activities | identify risks of vessel operations | identify risks of ship activities | recognise risks of ship activities

risico’s van scheepsactiviteiten vaststellen




Directive on the Assessment and Management of Flood Risks | Floods Directive

hoogwaterrichtlijn | Richtlijn 2007/60/EG van het Europees Parlement en de Raad van 23 oktober 2007 over beoordeling en beheer van overstromingsrisico’s


mapping of the risk of flooding

kaarteren van plaatsen met veel kans op overstroming | karteren van plaatsen met groot overstromingsgevaar
TRADUCTIONS EN CONTEXTE
The second step in the FD’s risk management process was the production of flood hazard maps and flood risk maps for the areas identified as areas of potential significant flood risks by the end of 2013.

De tweede stap in het risicobeheerproces van de overstromingsrichtlijn was het realiseren, voor eind 2013, van overstromingsgevaar- en overstromingsrisicokaarten voor gebieden waar een potentieel aanzienlijk overstromingsrisico is vastgesteld.


The European Commission has requested Poland to bring its national laws on the assessment and management of flood risks into line with the Floods Directive (2007/60/EC. The Directive aims to reduce and manage the risks that floods pose to human health, the environment, economic activity and cultural heritage. Under EU law, Member States have to perform flood risk assessments for their river basins, and draw up emergency plans.The Commission identified shortcomings in Poland's transposition of this legislation into its domestic law, an ...[+++]

De Europese Commissie heeft Polen verzocht om zijn wettelijke regeling betreffende de beoordeling en het beheer van overstromingsrisico's in overeenstemming te brengen met de overstromingsrichtlijn (2007/60/EG). De richtlijn is gericht op de vermindering en de beheersing van de risico's van overstromingen voor de gezondheid van de mens, het milieu, de economische bedrijvigheid en het culturele erfgoed. De lidstaten moeten op grond van het EU-recht overstromingsrisicobeoordelingen voor hun stroomgebieden uitvoeren en noodplannen opstel ...[+++]


Across the European Union, Member States are preparing these steps, which are: firstly, to carry out a preliminary flood risk assessment in 2011 and to identify areas of potential significant flood risks; secondly, to prepare detailed flood hazard maps and flood risk maps by 2013; and, thirdly, to prepare the first flood risk management plans in 2015.

In de hele Europese Unie bereiden de lidstaten deze stappen voor, te weten: ten eerste het uitvoeren van een voorlopige beoordeling van het overstromingsgevaar in 2011 en het signaleren van gebieden met potentieel significante overstromingsrisico’s, ten tweede het opstellen van gedetailleerde kaarten voor overstromingsgevaar en overstromingsrisico voor 2013 en ten derde het opstellen van de eerste beheersplannen voor overstromingsrisico’s in 2015.


1. On the basis of a preliminary flood risk assessment as referred to in Article 4, Member States shall, for each river basin district, or unit of management referred to in Article 3(2)(b), or portion of an international river basin district lying within their territory, identify those areas for which they conclude that potential significant flood risks exist or might be considered likely to occur.

1. Op basis van een voorlopige overstromingsrisicobeoordeling, als bedoeld in artikel 4, stellen de lidstaten voor ieder stroomgebiedsdistrict of iedere in artikel 3, lid 2, onder b), bedoelde beheerseenheid of voor het deel van een internationaal stroomgebiedsdistrict dat op hun grondgebied is gelegen, de gebieden vast waarvoor zij concluderen dat een potentieel significant overstromingsrisico bestaat of kan worden verwacht.


For more results, go to https://pro.wordscope.com to translate your documents with Wordscope Pro!
2. Member States shall establish appropriate objectives for the management of flood risks for the areas identified under Article 5(1) and the areas covered by Article 13(1)(b), focusing on the reduction of potential adverse consequences of flooding for human health, the environment, cultural heritage and economic activity, and, if considered appropriate, on non-structural initiatives and/or on the reduction of the likelihood of flooding.

2. De lidstaten stellen adequate doelstellingen vast voor het beheer van de overstromingsrisico’s in de in artikel 5, lid 1, en de in artikel 13, lid 1, onder b), bedoelde gebieden, waarbij aandacht wordt besteed aan de vermindering van de potentiële negatieve gevolgen van overstromingen voor de gezondheid van de mens, het milieu, het culturele erfgoed en de economische bedrijvigheid, en, indien nodig geacht, aan niet-structurele initiatieven en/of aan de vermindering van de kans op overstromingen.


the conclusions of the preliminary flood risk assessment as required in Chapter II in the form of a summary map of the river basin district, or the unit of management referred to in Article 3(2)(b), delineating the areas identified under Article 5(1) which are the subject of this flood risk management plan.

de conclusies van de overeenkomstig hoofdstuk II opgestelde voorlopige overstromingsrisicobeoordeling in de vorm van een summiere kaart van het stroomgebiedsdistrict of van de in artikel 3, lid 2, onder b), bedoelde beheerseenheid, waarop de in artikel 5, lid 1, bedoelde gebieden zijn afgebakend die onder dit overstromingsrisicobeheersplan vallen.


1. Member States shall, at the level of the river basin district, or unit of management referred to in Article 3(2)(b), prepare flood hazard maps and flood risk maps, at the most appropriate scale for the areas identified under Article 5(1).

1. De lidstaten stellen op het niveau van stroomgebiedsdistrict of van in artikel 3, lid 2, onder b), bedoelde beheerseenheid, overstromingsgevaarkaarten en overstromingsrisicokaarten met de meest geschikte schaal op voor de in artikel 5, lid 1, bedoelde gebieden.


On this basis and following extensive consultations with the interested parties, the Commission tabled its proposal, which contains the following main points: preliminary evaluation of the flood risk, in order to identify the areas at high risk (with the possible repercussions of climate change on future floods being taken into account), flood risk maps, on which citizens and planning authorities can see the possible extent of floods and the damage which they may cause to man, businesses and t ...[+++]

Op grond hiervan, en na uitgebreid overleg te hebben gevoerd met de belanghebbende partijen, heeft de Commissie een voorstel ingediend waarin de volgende belangrijke punten zijn opgenomen: overstromingsbeoordeling om de risicogebieden op te sporen (rekening dient te worden gehouden met de eventuele gevolgen van de klimaatverandering voor toekomstige overstromingen); overstromingsrisicokaarten aan de hand waarvan de burgers en de met de planning belaste autoriteiten kunnen vaststellen hoe groot de overstromingen kunnen zijn en welke schade zij kunnen aanrichten aan de bevolking, het bedrijfsleven en het milieu; en grensoverschrijdende c ...[+++]


On this basis and following extensive consultations with the interested parties, the Commission tabled its proposal, which contains the following main points: preliminary evaluation of the flood risk, in order to identify the areas at high risk (with the possible repercussions of climate change on future floods being taken into account), flood risk maps, on which citizens and planning authorities can see the possible extent of floods and the damage which they may cause to man, businesses and t ...[+++]

Op grond hiervan, en na uitgebreid overleg te hebben gevoerd met de belanghebbende partijen, heeft de Commissie een voorstel ingediend waarin de volgende belangrijke punten zijn opgenomen: overstromingsbeoordeling om de risicogebieden op te sporen (rekening dient te worden gehouden met de eventuele gevolgen van de klimaatverandering voor toekomstige overstromingen); overstromingsrisicokaarten aan de hand waarvan de burgers en de met de planning belaste autoriteiten kunnen vaststellen hoe groot de overstromingen kunnen zijn en welke schade zij kunnen aanrichten aan de bevolking, het bedrijfsleven en het milieu; en grensoverschrijdende c ...[+++]


- Identifying flood risks and setting up a rapid-warning system In Honduras, a Community grant of ECU 51 600 will prevent flooding by the River Cholecutal, which threatens some 500 000 people.

- Bepaling van het risico op overstroming en het instellen van een vroegtijdig waarschuwingssysteem In Honduras zal hulp van de Gemeenschap ter waarde van 51.600 ecu bijdragen aan het voorkomen van overstromingen van de rivier Cholecutal; deze overstromingen bedreigen 500.000 mensen.




datacenter (1): www.wordscope.be (v4.0.br)

'Identify risks flooding' ->

Date index: 2022-07-16
w