Second plea in law alleging, in the case of supply contracts, an infringement, on account of incorrect application, of Article 20(2)(e) of Council Directive 93/38/EEC of 14 June 1993 coordinating the procurement procedures of entiti
es operating in the water, energy, transport and telecommunications sector (OJ 1993 L 199, p. 84) and, in the case of contracts for works and contracts for services the subject of correction, an infringement, on account of incorrect application, of Article 20(2)(f) of that Directive, since the contracting of additional services is a conceptually distinct matter from the amendment of a cont
...[+++]ract at the performance phase provided for by Spanish legislation in relation to public contracts and consequently such amendment does not fall within the scope of Directive 93/38.Tweede middel, wat leveringsovereenkomsten betreft, ontleend aan schending, door onjuiste toepassing, van artikel 20, lid 2, sub e, van richtlijn 93/38/EEG van de Raad van 14 juni 1993 houdende coördinatie van de procedures voor het plaatsen van opdrac
hten in de sectoren water- en energievoorziening, vervoer en telecommunicatie (PB L 199, blz. 84) en, in het geval van de overeenkomsten tot aanneming van werk en de dienstovereenkomsten waarop de correctie wordt toegepast, ontleend aan schending, door onjuiste toepassing, van artikel 20, lid 2, sub f, van richtlijn 93/38, doordat een opdracht voor aanvullende diensten een figuur is die con
...[+++]ceptueel verschilt van de wijziging van een overeenkomst in de fase van uitvoering waarin de Spaanse wetgeving inzake overheidsopdrachten voorziet, zodat deze wijziging niet onder de werkingssfeer van deze richtlijn valt.