Boost Your Productivity!Translate documents (Ms-Word, Ms-Excel, ...) faster and better thanks to artificial intelligence!
https://pro.wordscope.com
https://blog. wordscope .com
Aerial feeder line
Aerial feedline
Antenna feed
Antenna feeder line
Antenna feedline
Area checking for power line installation
Assess areas for power line installation
Assessing areas for power line installation
Check areas for power line installation
Electric powerline system worker
Electrical transmission system operator
Electricity power line system worker
Electricity transmission system technician
Exposure to electric transmission lines
Feeder
High power transmission line
Install power lines
Installing power lines
Power lines commissioning
Power lines installing
Power rail
Power transmission line
Transmission line of an aerial
Transmission line of an antenna

Vertaling van "power transmission line " (Engels → Nederlands) :

TERMINOLOGIE
high power transmission line

transmissie-lijn voor hoog vermogen


power rail | power transmission line

stroomdraad | stroomrail


aerial feeder line | aerial feedline | antenna feed | antenna feeder line | antenna feedline | feeder | transmission line of an aerial | transmission line of an antenna

voedingslijn van de antenne


Exposure to electric transmission lines

blootstelling aan elektrische hoogspanningsleidingen


electricity power line system worker | electricity transmission system technician | electric powerline system worker | electrical transmission system operator

elektricien kabels en netwerken | hoofdmonteur laag- en middenspanningsnetten | exploitatietechnicus elektriciteitsleidingen | voorman kabelwerker laag- en middenspanningsnetten


assessing areas for power line installation | check areas for power line installation | area checking for power line installation | assess areas for power line installation

gebieden beoordelen om hoogspanningskabels te plaatsen | gebieden beoordelen om hoogspanningsleidingen te plaatsen | gebieden beoordelen om elektriciteitsleidingen te plaatsen | gebieden beoordelen om stroomleidingen te plaatsen


installing power lines | power lines installing | install power lines | power lines commissioning

stroomleidingen installeren | elektriciteitskabels installeren | stroomkabels installeren


Collision of powered aircraft in flight with overhead power lines

botsing van aangedreven luchtvaartuig in vlucht met hoogspanningskabels


Corneal bur system, line-powered

corneafreessysteem op netvoeding


Corneal bur handpiece, line-powered

handvat voor corneafrees op netvoeding
IN-CONTEXT TRANSLATIONS
The terms and conditions for sub-stations, transformers and transmission lines with a minimum voltage threshold of 60kV located outside the renewable energies power plant site boundary shall not be more generous than those for the renewable energies power plant.

de voorwaarden voor onderstations, transformatoren en transmissielijnen met een minimumspanningsdrempel van 60kv buiten het terrein van de duurzame-energiecentrale mogen niet gunstiger dan die voor de duurzame-energiecentrale zijn.


the maximum repayment term for sub-stations, transformers and transmission lines with a minimum voltage threshold of 100 kV shall be the same as that for the non-nuclear power plant.

de maximale krediettermijn voor onderstations, transformatoren en transmissielijnen met een minimumspanningsdrempel van 100 kV is dezelfde als die voor de niet-nucleaire elektriciteitscentrale.


Sub-stations, transformers and transmission lines located outside the nuclear power plant site boundary.

onderstations, transformatoren en transmissielijnen buiten het terrein van de kerncentrale;


As identified by CEPT reports, the categories of portable or mobile wireless video links and cordless cameras that can be used for programme making and special events (‘video PMSE’) may include among others cordless cameras as handheld or otherwise mounted cameras with integrated or clip-on transmitters, power packs and antennae for carrying broadcast-quality videos together with sound signals over short-ranges, line-of-sight and non-line-of-sight; portable video links via small transmitters, for deployment over greater ranges, typic ...[+++]

Zoals vastgesteld in de CEPT-verslagen, kunnen de categorieën draagbare of mobiele draadloze videoverbindingen en draadloze camera's die kunnen worden gebruikt voor programmaproductie en speciale evenementen („video-PMSE”) onder meer het volgende omvatten: draadloze camera's, in draagbare of anderszins gemonteerde uitvoering, met geïntegreerde zenders of zenders met bevestigingsclip, voedingen en antennes voor het overdragen van video's van uitzendkwaliteit met geluidssignalen over korte afstanden, via een direct-zichtverbinding en via een niet-direct-zichtverbinding; draagbare videoverbindingen via ...[+++]


For more results, go to https://pro.wordscope.com to translate your documents with Wordscope Pro!
* Transmission capacity: the capacity of fixed infrastructure, such as power lines, to transport electricity.

* Transmissiecapaciteit: de capaciteit van een vaste infrastructuur, zoals elektriciteitskabels, om elektriciteit te transporteren.


5. Transmission system operators shall, as far as technically possible, net the capacity requirements of any power flows in opposite direction over the congested interconnection line in order to use that line to its maximum capacity.

5. De transmissiesysteembeheerders vereffenen, voor zover dit technisch mogelijk is, de behoeften aan capaciteit voor elektriciteitsstromen in tegengestelde richting over de overbelaste koppellijn, teneinde de capaciteit van deze lijn maximaal te benutten.


Concern is expressed, primarily by the power industry, about the authorisation of new power plants and transmission lines.

Vooral elektriciteits bedrijven geven hun bezorgdheid te kennen over de vergunningen voor nieuwe centrales en transportleidingen.


Concern is expressed, primarily by the power industry, about the authorisation of new power plants and transmission lines.

Vooral elektriciteits bedrijven geven hun bezorgdheid te kennen over de vergunningen voor nieuwe centrales en transportleidingen.


5. Transmission system operators shall, as far as technically possible, net the capacity requirements of any power flows in opposite direction over the congested interconnection line in order to use this line to its maximum capacity.

5. De transmissiesysteembeheerders vereffenen, voorzover dit technisch mogelijk is, de behoeften aan capaciteit voor elektriciteitsstromen in tegengestelde richting over de overbelaste koppellijn, teneinde de capaciteit van deze lijn maximaal te benutten.


| | 402.6 | Specialist activities in other fields of civil engineering (including installation of roads signs and signals and seamarks, installation of mains and pipelines for gas, water and hydrocarbons, and installation of electric power transmission and telecommunication lines) |

* * 402.6 * Andere gespecialiseerde aannemersbedrijven van de weg - en waterbouwkundige werken ( hiertoe behoren de bedrijven welke rivier - , zee - en wegbebakeningswerkzaamheden uitvoeren ; buizen - en kabelleggersbedrijven ; installatiebedrijven van elektriciteitsnetten en dergelijke ) *


w