Boost Your Productivity!Translate documents (Ms-Word, Ms-Excel, ...) faster and better thanks to artificial intelligence!
https://pro.wordscope.com
https://blog. wordscope .com
Activities performed with ship deck equipment
Ambursen dam
Ambursen slab and buttress dam
Cast iron with flake graphite
Cast iron with lamellar graphite
Cast-in-place concrete pile
Cast-in-place pile
Cast-in-situ concrete pile
Cast-in-situ pile
Cast-in-the-ground concrete pile
Cast-in-the-ground pile
Casting deck
Casting floor
Casting platform
Deck dam
Die casting
Die-casting
Ensure suitable quantity of deck equipment
Flake-graphite cast iron
Flat slab and buttress dam
Flat slab dam
Flat-deck buttress dam
Flat-deck dam
Flat-slab buttress dam
Flat-slab dam
Flat-slab deck dam
Functions of deck equipment on vessels
Functions of ship deck equipment
Functions of vessel deck equipment
GJL
Gray cast iron
Grey cast iron
Grey iron
Grey lamellar graphite cast iron
Handle deck equipment
In situ pile
In-situ pile
Install stage decks
Lamellar graphite cast iron
Poured-in-place concrete pile
Pouring platform
Prepare deck equipment
Press casting
Pressure casting
Pressure die casting
Pressure die-casting
Set up stage deck
Set up stage decks
Setting up stage decks
Situ-cast concrete pile
Situ-cast pile
Slab and buttress dam
Two-deck cast iron stove

Traduction de «Casting deck » (Anglais → Français) :

TERMINOLOGIE
voir aussi les traductions en contexte ci-dessous
casting deck | casting floor | casting platform | pouring platform

2 plancher de coulée | plancher de travail | plateforme de coulée


cast in situ deck by means of incremental launching forms

tablier coulé en place sur cintre auto-lanceur




cast iron with flake graphite | cast iron with lamellar graphite | flake-graphite cast iron | gray cast iron | grey cast iron | grey iron | grey lamellar graphite cast iron | lamellar graphite cast iron | GJL [Abbr.]

fonte à graphite lamellaire | fonte grise


cast-in-place pile [ cast-in-place concrete pile | poured-in-place concrete pile | in situ pile | cast-in-situ pile | in-situ pile | cast-in-situ concrete pile | cast-in-the-ground concrete pile | cast-in-the-ground pile | situ-cast concrete pile | situ-cast pile ]

pieu réalisé en place [ pieu moulé dans le sol | pieu exécuté dans le sol | pieu exécuté en place | pieu en béton exécuté en place | pieu réalisé dans le sol | pieu coulé en place ]


ensure suitable quantity of deck equipment | handle deck equipment | ensure appropriate quantity and location of deck equipment | prepare deck equipment

préparer les équipements des ponts


set up stage deck | setting up stage decks | install stage decks | set up stage decks

installer des estrades


activities performed with ship deck equipment | functions of ship deck equipment | functions of deck equipment on vessels | functions of vessel deck equipment

fonctions des équipements du pont d'un navire


die casting | die-casting | pressure die casting | pressure die-casting | pressure casting | press casting

coulée sous pression | moulage sous pression | moulage en coquille | moulage mécanique | moulage en coquille sous pression | coulage sous pression | procédé de moulage sous pression


flat-slab dam [ flat slab dam | flat-slab deck dam | flat-slab buttress dam | flat slab and buttress dam | flat-deck dam | flat-deck buttress dam | slab and buttress dam | deck dam | Ambursen dam | Ambursen slab and buttress dam ]

barrage à dalles planes [ barrage à contreforts à dalle plane | barrage à contreforts et dalle plane | barrage à bouchure en dalle plane | barrage à contreforts minces | barrage du type Ambursen ]
TRADUCTIONS EN CONTEXTE
(4) In every ship of 150 tons, gross tonnage, or over, every side scuttle below the margin line shall be fitted with an efficient hinged deadlight of material other than ordinary cast iron, permanently attached, so that it can be readily and effectively closed and secured watertight, provided that abaft a point one-eighth of the length of the ship from the forward perpendicular and above a line drawn parallel to the bulkhead deck at side and having its lowest point at a height of 3.66 m plus 2 1/2 per cent of the breadth of the ship a ...[+++]

(4) Sur tout navire d’une jauge brute de 150 tonneaux ou plus, tout hublot au-dessous de la ligne de surimmersion sera muni d’une tape à charnière efficace, faite d’un matériau autre que la fonte de fer ordinaire et fixée à demeure, qui permettra de le fermer facilement et effectivement et de le rendre étanche. Toutefois, en arrière d’un point situé au huitième de la longueur du navire depuis la perpendiculaire avant et au-dessus d’une ligne tracée parallèlement au livet du pont de cloisonnement et ayant son point le plus bas à une hauteur de 3,66 m plus 2 1/2 pour cent de la largeur du navire au-dessus de la ligne de charge maximum de c ...[+++]


Today, as we are seeing, the auditor general is casting light on some things (1615) He speaks of a process in which most of the deck is missing, nearly 95 per cent of the information is lacking.

Aujourd'hui, on le voit, le vérificateur général met des choses en lumière (1615) Il énonce un processus dont il manque à peu près 95 p. 100 des cartes, des informations.




datacenter (1): www.wordscope.be (v4.0.br)

'Casting deck' ->

Date index: 2024-07-24
w