Boost Your Productivity!Translate documents (Ms-Word, Ms-Excel, ...) faster and better thanks to artificial intelligence!
https://pro.wordscope.com
https://blog. wordscope .com
Activities performed with ship deck equipment
Ambursen dam
Ambursen slab and buttress dam
Anchor deck
Auto deck
CRT based flight deck
CRT configured flight deck
Car deck
Card deck
Card pack
Cathode ray tube-based flight deck
Cathode ray tube-configured flight deck
Deck
Deck O
Deck dam
Deck machinery accident in water transport
Deck of cards
Deck officer
Ensure suitable quantity of deck equipment
Flat slab and buttress dam
Flat slab dam
Flat-deck buttress dam
Flat-deck dam
Flat-slab buttress dam
Flat-slab dam
Flat-slab deck dam
Fo'c'sle deck
Foc'sle deck
Forecastle deck
Functions of deck equipment on vessels
Functions of ship deck equipment
Functions of vessel deck equipment
Handle deck equipment
Install stage decks
Pack
Prepare deck equipment
Set of cards
Set up stage deck
Set up stage decks
Setting up stage decks
Slab and buttress dam
Waggon deck

Vertaling van "Deck O " (Engels → Frans) :

TERMINOLOGIE


ensure suitable quantity of deck equipment | handle deck equipment | ensure appropriate quantity and location of deck equipment | prepare deck equipment

préparer les équipements des ponts


activities performed with ship deck equipment | functions of ship deck equipment | functions of deck equipment on vessels | functions of vessel deck equipment

fonctions des équipements du pont d'un navire


set up stage deck | setting up stage decks | install stage decks | set up stage decks

installer des estrades


cathode ray tube-based flight deck | cathode ray tube-configured flight deck | CRT based flight deck | CRT configured flight deck

poste de pilotage doté d'écrans




card deck | card pack | deck | deck of cards | pack | set of cards

jeu de cartes | paquet de cartes


Deck machinery accident in water transport

accident de machinerie de pont dans un transport maritime


flat-slab dam [ flat slab dam | flat-slab deck dam | flat-slab buttress dam | flat slab and buttress dam | flat-deck dam | flat-deck buttress dam | slab and buttress dam | deck dam | Ambursen dam | Ambursen slab and buttress dam ]

barrage à dalles planes [ barrage à contreforts à dalle plane | barrage à contreforts et dalle plane | barrage à bouchure en dalle plane | barrage à contreforts minces | barrage du type Ambursen ]


forecastle deck [ foc'sle deck | fo'c'sle deck | anchor deck ]

pont de gaillard [ pont de gaillard d'avant | plage avant | pont teugue | pont avant | pont de la teugue ]
IN-CONTEXT TRANSLATIONS
7 (1) If air pipes to tanks extend above the freeboard deck or superstructure decks, the exposed parts of the pipes shall be efficiently constructed and the height from the deck to the point on the pipe where water may downflood shall be at least 760 mm on the freeboard deck, 600 mm on raised quarter-decks and 300 mm on other superstructure decks.

7 (1) Si les tuyaux de dégagement d’air desservant des caisses se prolongent au-dessus du pont de franc-bord ou des ponts de superstructure, les parties exposées de ces tuyaux sont de construction efficace et leur hauteur entre le pont et le point du tuyau d’envahissement par le haut est d’au moins 760 mm sur le pont de franc-bord, d’au moins 600 mm sur la demi-dunette et d’au moins 300 mm sur les autres ponts de superstructure.


(2) As far as practicable the portions of the “A” Class divisions above the bulkhead deck shall be in line with watertight subdivision bulkheads situated immediately below the bulkhead deck and shall extend from deck to deck and to the shell or other boundaries.

(2) Dans la mesure du possible, les parties des cloisons type A qui se trouvent au-dessus du pont du cloisonnement seront alignées avec les cloisons étanches de compartimentage situées immédiatement au-dessous du pont de cloisonnement et s’étendront de pont à pont, jusqu’au bordé extérieur ou autres entourages.


(3) Subject to subsections (4) and (5), the door-sill or coaming top of every exterior crew access opening, other than a wheelhouse door opening, located on the part of a forecastle deck in the bow section or on the main deck and through which flooding could occur into a space below the main deck shall be not less than 610 mm the deck outside the door-sill or coaming.

(3) Sous réserve des paragraphes (4) et (5), le sommet du seuil de porte ou de l’hiloire de tout orifice extérieur d’accès à l’usage de l’équipage, sauf une baie de porte pratiquée dans une timonerie, située dans la partie d’un point du gaillard comprise dans la partie avant du navire ou sur le pont principal et par lequel l’eau pourrait envahir un local situé en dessous du pont principal, doit dépasser d’au moins 610 mm le niveau du pont du côté extérieur du seuil de porte ou de l’hiloire.


(iii) located on any deck, other than the part of a forecastle deck in the bow section or the main deck, and through which flooding could occur into a space below the main deck, and

(iii) donnant sur un pont, sauf sur la partie du pont du gaillard située dans la partie avant du navire ou sur le pont principal, et par lequel l’eau pourrait envahir un local situé en dessous du pont principal, et


For more results, go to https://pro.wordscope.com to translate your documents with Wordscope Pro!
(d) in the case of the uppermost continuous deck and decks above that deck, each means of escape shall be either a stairway, a door or a combination of both and both means of escape shall give direct access to an open deck and thence to lifeboats or liferafts; and

d) au-dessus du pont continu le plus élevé et sur ce pont, chaque moyen d’évacuation doit être un escalier, une porte ou une combinaison des deux, et il doit donner directement accès à un pont découvert et, de là, aux embarcations ou aux radeaux de sauvetage; et


In paragraph 4, the explanation ‘ni = 4 for free deck areas and deck areas with movable furniture; for deck areas with fixed seating furniture such as benches, ni shall be calculated by assuming an area of 0,45 m in width and 0,75 m in seat depth per person’ is replaced by the following:

Au paragraphe 4, l’explication «ni = 4 pour les surfaces de pont libres et les surfaces comportant du mobilier mobile; pour les surfaces comportant des sièges fixes tels que des bancs, ni doit être calculé sur la base d'une largeur d'assise de 0,45 m et d'une profondeur d'assise de 0,75 m par personne» est remplacée par le texte suivant:


For double deck trains it is permitted to reduce this value to 270 mm for the stairs accessing the upper deck.

Dans les rames à deux niveaux, cette valeur peut être réduite à 270 mm pour les escaliers d'accès au niveau supérieur.


Equidae shall not be transported in multi-deck vehicles except if animals are loaded on the lowest deck with no animals on higher deck.

Les équidés ne doivent être transportés dans des véhicules à plusieurs ponts que si les animaux sont chargés sur le pont inférieur et qu'aucun animal n'est chargé sur le pont supérieur.


11.13.2. Decks in the vicinity of winches and bollards, as well as side-decks, engine-room floors, landings, companionways and the top of the side-deck bollards must be non-slip.

11.13.2. Les ponts aux abords des treuils et bollards ainsi que les plats-bords, le plancher des salles des machines, les paliers, les escaliers et le dessus des bollards du plat-bord doivent être antidérapants.


(x) "freeboard" means the distance between the plane of maximum draught and a parallel plane passing through the lowest point of the side deck or, in the absence of a side deck, the lowest point of the upper edge of the full planking or plating;

x) le terme «franc-bord» désigne la distance entre le plan du plus grand enfoncement et le plan parallèle passant par le point le plus bas du plat-bord ou, à défaut de plat-bord, par le point le plus bas de l'arête supérieure du bordé;




datacenter (1): www.wordscope.be (v4.0.br)

'Deck O' ->

Date index: 2024-09-23
w