Boost Your Productivity!Translate documents (Ms-Word, Ms-Excel, ...) faster and better thanks to artificial intelligence!
https://pro.wordscope.com
https://blog. wordscope .com
Anti-diffusion grid
Anti-scatter grid
Antiscatter grid
Bucky
Bucky diaphragm
Bucky grid
Catapult Bucky grid
Computational grid
Computing grid
Draw grid
Draw up assembly drawings
Electricity grid supply
Grid
Grid distance
Grid length
Grid method drawing
Grid spacing
Grid step
Grid supply
Hering-Hermann grid
Hermann grid
Hermann's grid
Hermann-Hering grid
Mains operation
Mains supply
Mobile antiscatter grid
Potter Bucky grid
Potter-Bucky diaphragm
Power grid supply
Prepare assembly drawing
Prepare assembly drawings
Preparing assembly drawings
Reciprocating Bucky frame
Secondary radiation grid

Traduction de «Draw grid » (Anglais → Français) :

TERMINOLOGIE
voir aussi les traductions en contexte ci-dessous






anti-diffusion grid | antiscatter grid | anti-scatter grid | Potter-Bucky diaphragm | secondary radiation grid

antidiffuseur | filtre antidispersion | grille antidiffusante | grille d'antidiffusion


Bucky | Bucky diaphragm | Bucky grid | catapult Bucky grid | mobile antiscatter grid | Potter Bucky grid | reciprocating Bucky frame

cadre de Bucky | diaphragme de Potter-Bucky | grille antidiffusante mobile | grille de Potter Bucky | grille mobile | grille oscillante | Potter Bucky


draw up assembly drawings | prepare assembly drawing | prepare assembly drawings | preparing assembly drawings

préparer des schémas de montage


Hermann grid [ Hermann-Hering grid | Hermann's grid | Hering-Hermann grid ]

grille de Hermann [ quadrillage de Hering-Hermann | quadrillage de Hermann ]


grid supply | Grid supply | mains supply | mains operation | power grid supply | electricity grid supply

alimentation secteur | alimentation par le secteur | alimentation sur secteur | alimentation par le réseau | alimentation réseau


computational grid | grid | computing grid | grid

grille informatique


grid length [ grid distance | grid spacing | grid step ]

distance de grille [ dimension de maille | maille ]
TRADUCTIONS EN CONTEXTE
17. Calls on all regions to consider investments into skills and training for these new jobs, taking into account the fact that a significant number of new local jobs can also be created in ICT services, the transport sector and sectors that supply smart equipment, infrastructure and services, for instance for new installations, but also to avoid any shortage of specialist labour and enable adaptation to the needs arising from the emergence of new professions in the respective fields; calls on the Member States and regions to support training initiatives both at the academic and the craftsmanship level in the field of renewable energy, such as environmental technical studies and the development of new apprenticeships, for example solateur; ...[+++]

17. invite toutes les régions à envisager d'investir dans les compétences et la formation relatives à ces nouveaux emplois, tout en tenant compte du fait qu'un nombre considérable de nouveaux emplois locaux peuvent également être créés dans les services des TIC, le secteur du transport et ceux qui approvisionnent les équipements, infrastructures et services intelligents, notamment ceux destinés aux nouvelles installations, mais aussi afin d'éviter une pénurie de main-d'œuvre spécialisée et de s'adapter aux demandes qui font suite à l'apparition de nouveaux métiers dans ces différents domaines; invite les États membres et les régions à soutenir des initiatives de formation tant au niveau universitaire qu'artisanal dans le domaine de l'énerg ...[+++]


21. Draws attention to the initiatives which the EIT is pursuing in the KIC InnoEnergy for research and development relating to smart grids and training of professionals in this sector; also draws attention, in this context, to the new scope for establishing Regional Innovation Schemes (RIS), as facilitated by the EIT in the period 2014-2020;

21. rappelle les initiatives prises par l'Institut européen d'innovation et de technologie, dans le cadre du KIC InnoEnergy, en matière de recherche et de développement concernant les réseaux intelligents, ainsi qu'en faveur de la formation de professionnels dans ce secteur; rappelle en outre, dans ce contexte, les nouvelles possibilités d'élaboration de Plans régionaux pour l'innovation, dans la mesure où l'Institut européen d'innovation et de technologie les a autorisés pour la période 2014-2020;


Member States should take all necessary measures to follow this Recommendation and to draw it to the attention of all stakeholders involved in designing and operating smart grid applications within the Union.

Les États membres devraient prendre toutes les mesures nécessaires pour suivre la présente recommandation et la porter à la connaissance de toutes les parties prenantes participant à la conception et à l’exploitation d’applications de réseaux intelligents dans l’Union.


Member States should take all necessary measures to follow this Recommendation and to draw it to the attention of all stakeholders involved in designing and operating smart grid applications within the Union.

Les États membres devraient prendre toutes les mesures nécessaires pour suivre la présente recommandation et la porter à la connaissance de toutes les parties prenantes participant à la conception et à l’exploitation d’applications de réseaux intelligents dans l’Union.


For more results, go to https://pro.wordscope.com to translate your documents with Wordscope Pro!
53. Notes that significant risks are associated with energy infrastructure, including operational risks (e.g. congestion and discontinuity of supply), natural risks (e.g. earthquakes and floods), environmental risks (e.g. pollution, and habitat and biodiversity loss) and anthropogenic/political risks (e.g. safety risks and terrorism); therefore calls for decisions on the development of smart grids to be implemented, as provided for in Directive 2008/114/EC on critical infrastructures; suggests that the Member States draw up a risk map as a ...[+++]

53. constate que des risques importants sont associés aux infrastructures énergétiques, y compris des risques opérationnels (notamment des encombrements et la discontinuité de l'approvisionnement), des risques naturels (par exemple des tremblements de terre et des inondations), des risques environnementaux (comme la pollution, la perte d'habitat et de biodiversité) et des risques anthropiques/politiques (notamment les risques pour la sûreté et le terrorisme); demande par conséquent que les décisions relatives au développement des réseaux intelligents soient mises en œuvre, comme prévu par la directive 2008/114/CE sur les infrastructures critiques; suggère aux États membres d'une part d'établir une ...[+++]


9. Notes that significant risks are linked to energy infrastructure such as operational (e.g. congestions, continuity of supply), natural (e.g. earthquakes, floods), environmental (e.g. pollution, habitat and biodiversity loss) or anthropogenic/political (e.g. safety, terrorism); therefore calls for decisions on smart grids development to be implemented, as foreseen by EC Directive 2008/114 on critical infrastructures; suggests to the Member States to draw-up a mapping of risks as a tool for decision-making and monitoring the result ...[+++]

9. constate que des risques importants sont associés aux infrastructures énergétiques: des risques opérationnels (notamment des encombrements, la continuité de l'approvisionnement), des risques naturels (par exemple des tremblements de terre, des inondations), des risques environnementaux (comme la pollution, la perte d'habitat et de biodiversité) et des risques anthropiques/politiques (notamment la sûreté, le terrorisme); demande par conséquent que les décisions relatives au développement des réseaux intelligents soient mises en œuvre, comme prévu par la directive 2008/114/CE sur les infrastructures critiques; suggère aux États membres d'une part d'établir une c ...[+++]


26. Notes that significant risks are associated with energy infrastructure, including operational risks (e.g. congestion and discontinuity of supply), natural risks (e.g. earthquakes and floods), environmental risks (e.g. pollution, and habitat and biodiversity loss) and anthropogenic/political risks (e.g. safety risks and terrorism); therefore calls for decisions on the development of smart grids to be implemented, as provided for in Directive 2008/114/EC on critical infrastructures; suggests that the Member States draw up a risk map as a ...[+++]

26. constate que des risques importants sont associés aux infrastructures énergétiques, y compris des risques opérationnels (notamment des encombrements et la discontinuité de l'approvisionnement), des risques naturels (par exemple des tremblements de terre et des inondations), des risques environnementaux (comme la pollution, la perte d'habitat et de biodiversité) et des risques anthropiques/politiques (notamment les risques pour la sûreté et le terrorisme); demande par conséquent que les décisions relatives au développement des réseaux intelligents soient mises en œuvre, comme prévu par la directive 2008/114/CE sur les infrastructures critiques; suggère aux États membres d'une part d'établir une ...[+++]


EU Member States are encouraged to take all necessary measures to follow the recommendation and to draw it to the attention of all stakeholders involved in designing and operating smart grid applications within the EU.

Les États membres de l’UE sont encouragés à prendre toutes les mesures nécessaires pour suivre la recommandation et la porter à la connaissance de toutes les parties prenantes participant à la conception et à l’exploitation d’applications de réseaux intelligents dans l’Union.


Are you aware of any economic modelling that would illustrate that there is a return that would convince the developer that in the longer term, the best first course of action would be to implement new technologies, as opposed to just taking the traditional approach, which is interfacing with the existing electrical grid and drawing power toward that redevelopment? I'm not aware of any specific models.

Connaissez-vous des modèles économiques qui affichent un rendement qui convaincrait le promoteur qu'à long terme, la meilleure façon de procéder au départ est de mettre en place de nouvelles technologies plutôt que de suivre l'approche traditionnelle, c'est-à-dire de se brancher au réseau électrique existant et d'y puiser l'énergie pour la zone réaménagée?


EU Member States are encouraged to take all necessary measures to follow the recommendation and to draw it to the attention of all stakeholders involved in designing and operating smart grid applications within the EU.

Les États membres de l’UE sont encouragés à prendre toutes les mesures nécessaires pour suivre la recommandation et la porter à la connaissance de toutes les parties prenantes participant à la conception et à l’exploitation d’applications de réseaux intelligents dans l’Union.




datacenter (1): www.wordscope.be (v4.0.br)

'Draw grid' ->

Date index: 2023-04-23
w