Boost Your Productivity!Translate documents (Ms-Word, Ms-Excel, ...) faster and better thanks to artificial intelligence!
https://pro.wordscope.com
https://blog. wordscope .com
Flood Hazard Mapping Program
Flood control structure
Flood control works
Flood defence structure
Flood hazard
Flood hazard map
Flood mitigation works
Flood protection structure
Flood protection works
Flood risk
Inundation hazard
Risk of flood damage
Risk of flooding

Vertaling van "Flood hazard " (Engels → Frans) :

TERMINOLOGIE
flood hazard | risk of flooding | inundation hazard

danger d'inondation | risque d'inondation




flood hazard [ risk of flood damage ]

risque d'inondation [ risque de crue ]


flood hazard | flood risk

danger de crue | danger lié aux crues | risque de crue






Flood Hazard Mapping Program

Programme de cartographie des zones inondables




Canada-Saskatchewan: An Agreement Respecting Flood Hazard Mapping and Studies

Canada-Saskatchewan : Accord concernant l'établissement des cartes des zones inondables et l'étude de ces zones


flood protection structure | flood control structure | flood defence structure | flood protection works | flood control works | flood mitigation works

ouvrage de protection contre les crues
IN-CONTEXT TRANSLATIONS
As regards the implementation of Union legislation on disaster risk prevention and management related to the nature of the disaster Bulgaria has transposed Directive 2007/60/EC of the European Parliament and of the Council of 23 October 2007 on the assessment and management of flood risks (the “Floods Directive”) in 2010 into national law and a preliminary flood risk assessment for each river basin district has been conducted based on a methodology for flood risk and flood hazard assessment developed by the Ministry of Environment and Water.

En ce qui concerne la mise en œuvre de la législation de l'Union sur la prévention et la gestion des risques de catastrophes liées à la nature de la catastrophe, c'est en 2010 que la Bulgarie a transposé en droit national la directive 2007/60/CE du Parlement Européen et du Conseil du 23 octobre 2007 relative à l'évaluation et à la gestion des risques d'inondation (la directive "Inondations"); une évaluation préliminaire des risques d'inondation a été effectuée pour chaque district de bassin hydrographique grâce à une méthode d'évaluation des risques d'inondation et des zones inondables mise au point par le ministère de l'environnement e ...[+++]


Across the European Union, Member States are preparing these steps, which are: firstly, to carry out a preliminary flood risk assessment in 2011 and to identify areas of potential significant flood risks; secondly, to prepare detailed flood hazard maps and flood risk maps by 2013; and, thirdly, to prepare the first flood risk management plans in 2015.

Partout dans l’Union européenne, les États membres préparent ces mesures, qui sont les suivantes. Premièrement, en 2011, établir des évaluations préliminaires concernant les risques d’inondation et identifier les zones où les risques d’inondation sont potentiellement importants. Deuxièmement, élaborer des cartes détaillées des zones inondables et des cartes des risques d’inondation d’ici 2013. Troisièmement, établir les premiers plans de gestion des risques d’inondations en 2015.


In order to have available an effective tool for information, as well as a valuable basis for priority setting and further technical, financial and political decisions regarding flood risk management, it is necessary to provide for the establishing of flood hazard maps and flood risk maps showing the potential adverse consequences associated with different flood scenarios, including information on potential sources of environmental pollution as a consequence of floods.

Afin de disposer d’un outil d’information efficace, ainsi que d’une base valable pour la fixation de priorités et les décisions techniques, financières et politiques ultérieures en matière de gestion des risques d’inondation, il est nécessaire de prévoir l’établissement de cartes des zones inondables et de cartes des risques d’inondation montrant les conséquences négatives potentielles associées à différents scénarios d’inondation, y compris des informations sur les sources potentielles de pollution environnementale à la suite d’inondations.


1. In accordance with applicable Community legislation, Member States shall make available to the public the preliminary flood risk assessment, the flood hazard maps, the flood risk maps and the flood risk management plans.

1. Conformément à la législation communautaire applicable, les États membres mettent à la disposition du public l’évaluation préliminaire des risques d’inondation, les cartes des zones inondables, les cartes des risques d’inondation et les plans de gestion des risques d’inondation.


For more results, go to https://pro.wordscope.com to translate your documents with Wordscope Pro!
1. Member States shall make available the preliminary flood risk assessment, the flood hazard maps, the flood risk maps and flood risk management plans referred to in Articles 4, 6 and 7, as well as their review and, where applicable, their updates to the Commission within three months after the dates indicated respectively in Articles 4(4), 6(8), 7(5) and 14.

1. Les États membres mettent à la disposition de la Commission l’évaluation préliminaire des risques d’inondation, les cartes des zones inondables, les cartes des risques d’inondation et les plans de gestion des risques d’inondation visés aux articles 4, 6 et 7, ainsi que leurs réexamens et, le cas échéant, leurs mises à jour dans les trois mois qui suivent les dates indiquées respectivement à l’article 4, paragraphe 4, à l’article 6, paragraphe 8, à l’article 7, paragraphe 5, et à l’article 14.


decided, before 22 December 2010, to prepare flood hazard maps and flood risk maps and to establish flood risk management plans in accordance with the relevant provisions of this Directive.

soit décidé, avant le 22 décembre 2010, d’élaborer des cartes des zones inondables et des cartes des risques d’inondation ainsi que d’établir des plans de gestion des risques d’inondation conformément aux dispositions pertinentes de la présente directive.


To prevent duplication of work, Member States should be entitled to use existing preliminary flood risk assessments, flood hazard and risk maps and flood risk management plans for the purposes of achieving the objectives and satisfying the requirements of this Directive.

Afin d’éviter tout double travail, il convient que les États membres aient la faculté, pour réaliser les objectifs de la présente directive et satisfaire à ses exigences, d’utiliser les évaluations préliminaires des risques d’inondation, les cartes des zones inondables, les cartes des risques d’inondation et les plans de gestion des risques d’inondation existants.


(11) In order to have available an effective tool for information, as well as a valuable basis for priority setting and further technical, financial and political decisions regarding flood risk management it is necessary to provide for the establishing of flood hazard maps and flood risk maps showing the potential adverse consequences associated with different flood scenarios including the risk of environmental pollution as a consequence of floods.

(11) Afin de disposer d'un outil d'information efficace, ainsi que d'une base valable pour la fixation de priorités et les décisions techniques, financières et politiques ultérieures en matière de gestion des risques d'inondation, il est nécessaire de prévoir l'établissement de cartes des zones inondables et de cartes des risques d'inondation montrant les conséquences négatives potentielles associées à différents scénarios d'inondation, y compris le risque de pollution environnementale résultant des inondations.


(11) In order to have available an effective tool for information, as well as a valuable basis for priority setting and further technical, financial and political decisions regarding flood risk management it is necessary to provide for the establishing of flood hazard maps and flood risk maps showing the potential adverse consequences associated with different flood scenarios.

(11) Afin de disposer d'un outil d'information efficace, ainsi que d'une base valable pour la fixation de priorités et les décisions techniques, financières et politiques ultérieures en matière de gestion des risques d'inondation, il est nécessaire de prévoir l'établissement de cartes des zones inondables et de cartes des risques d'inondation montrant les conséquences négatives potentielles associées à différents scénarios d'inondation.


(b) decided, before 22 December 2010, to prepare flood hazard maps and flood risk maps and to establish flood risk management plans in accordance with the relevant provisions of this Directive.

(b) soit décidé, avant le 22 décembre 2010, d'élaborer des cartes des zones inondables et des cartes des risques d'inondation ainsi que d'établir des plans de gestion des risques d'inondation conformément aux dispositions pertinentes de la présente directive.




datacenter (1): www.wordscope.be (v4.0.br)

'Flood hazard' ->

Date index: 2022-05-27
w