However, when the initial verification takes place in the manufacturer's workshops, the tests may be carried
out with the cover removed as long as it has been previously accepted as having practically no effect on the performance of the meter. Nevertheless, when dielectric properties are checked, the meter cover shall be fitted. After the dielectric strength test has been satisfactorily carried out, but before any other test, the meters sha
ll be supplied with electricity for at least half an hour at the reference voltage and with a cu
...[+++]rrent of about 0.1 Ib, at unity power factor.Après l'épreuve satisfaisante de rigidité diélectrique mais avant tout autre contrôle, les compteurs doivent être alimentés pendant au moins une demi-heure à la tension de référence et avec un courant d'environ 0,1 Ib, à facteur de puissance unité.