Boost Your Productivity!Translate documents (Ms-Word, Ms-Excel, ...) faster and better thanks to artificial intelligence!
https://pro.wordscope.com
https://blog. wordscope .com
Break down the connection
Break off the call
Clear the line
Close the line
Connected electrical load
Connected load
Disconnect the call
Disconnect the lines
Disconnect the telephone line
Free the line
Hang up
Hoisting hook
Lifting hook
Load hook
Load hook and connections
Load hook up
Off-hook connection
Place the receiver on the hook
Put the receiver down
Replace the receiver
Ring off
Safe working load
Severe the connection
Sling hook
Top
Working load of a lifting hook

Traduction de «Load hook and connections » (Anglais → Français) :

TERMINOLOGIE
voir aussi les traductions en contexte ci-dessous


hoisting hook | lifting hook | sling hook | load hook

crochet de levage | crochet de charge | crochet porte-charge






connected load | connected electrical load

puissance raccordée


safe working load | working load of a lifting hook

charge d'utilisation d'un crochet de levage


hang up | close the line | disconnect the telephone line | free the line | replace the receiver | place the receiver on the hook | severe the connection | break off the call | disconnect the lines | disconnect the call | break down the connection | top

raccrocher | couper la communication | céder la communication | arrêter | rompre la communication | intercepter la communication | fermer la ligne | lâcher la ligne


hang up [ ring off | replace the receiver | place the receiver on the hook | put the receiver down | close the line | free the line | severe the connection | break down the connection | break off the call | disconnect the call | disconnect the lines | clear the line ]

raccrocher [ rompre la communication | couper la communication | interrompre la communication | libérer la ligne | céder la ligne | fermer la ligne | lâcher la ligne | couper la ligne ]




TRADUCTIONS EN CONTEXTE
(2) Pipelines used for loading or unloading tank cars shall be equipped with shut-off valves both at the loading or unloading connections and at the storage tanks.

(2) Les canalisations utilisées pour le chargement ou le déchargement des wagons-citernes seront munies de soupapes d’arrêt aux extrémités de chargement ou de déchargement ainsi qu’aux réservoirs d’emmagasinage.


(c) where in the case of any ship the subdivision load line marks assigned are located below the lowest of the ordinary load lines, the latter load lines, if the owner so desires, need not be placed on the ship’s sides; for such cases the ship’s sides shall be marked with the deck line, the disc, the horizontal line through the centre of the disc, the subdivision load line or lines and the fresh water load line; the fresh water load line mark shall be placed at the same distance above the disc as if the disc were in its normal position; the fresh water mark shall be designated by the letter F at its after end and the forward end of th ...[+++]

c) dans le cas de tout navire, on pourra omettre de marquer sur la muraille du navire les lignes de charge ordinaires les plus basses, si le propriétaire le désire, lorsque les marques de lignes de charge de compartimentage assignées seront situées au-dessous; dans ce cas, le livet de pont, le disque, la ligne horizontale passant par le centre du disque, la ou les lignes de charge de compartimentage et la ligne de charge en eau douce seront marqués sur la muraille; la marque de la ligne de charge en eau douce sera placée à la même distance au-dessus du disque que si le disque était à sa position normale; la ligne de charge en eau douce sera désignée par l ...[+++]


45 (1) Where the working space in a hold is confined to the hatchway, cargo hooks shall not be hooked into bands or fastenings securing the loads.

45 (1) Si, dans une cale, l’espace disponible pour travailler se limite au passage d’écoutille, les crochets de manutention ne seront pas fixés aux liens ou autres attaches des charges.


Trading ports, piers for loading and unloading connected to land and outside ports (excluding ferry piers) which can take vessels of over 1 350 tonnes.

Ports de commerce, quais de chargement et de déchargement reliés à la terre et avant-ports (à l’exclusion des quais pour transbordeurs) accessibles aux bateaux de plus de 1 350 tonnes.


For more results, go to https://pro.wordscope.com to translate your documents with Wordscope Pro!
(b)Trading ports, piers for loading and unloading connected to land and outside ports (excluding ferry piers) which can take vessels of over 1 350 tonnes.

b)Ports de commerce, quais de chargement et de déchargement reliés à la terre et avant-ports (à l’exclusion des quais pour transbordeurs) accessibles aux bateaux de plus de 1 350 tonnes.


The draw hook shall be located at a height between 920 and 1 045 mm above rail level in all loading and wear conditions.

le crochet de traction doit se situer à une hauteur comprise entre 920 et 1 045 mm au-dessus du niveau du rail, quelles que soient les conditions de charge et d’usure,


Heat loads shall include existing heat loads, such as an industrial installation or an existing district heating system, and also, in urban areas, the heat load and costs that would exist if a group of buildings or part of a city were provided with and/or connected into a new district heating network.

Les charges calorifiques comprennent les charges calorifiques existantes, telles qu'une installation industrielle ou un réseau de chaleur existant, ainsi que, dans les zones urbaines, la charge calorifique et les coûts qui résulteraient de l'alimentation d'un ensemble de bâtiments ou d'une partie de la ville par un nouveau réseau de chaleur ou de leur raccordement à celui-ci.


maximum vertical load provided for on the coupling hook, in Newtons (N).

l'effort vertical maximal prévu sur le crochet d'attelage en newtons (N).


- That Clause 98 be amended by replacing lines 27 to 37 on page 58 with the following: " 98 (1) The Governor in Council may make regulations for the management, control, development and use of the Seaway and property and undertakings in connection with the Seaway, including regulations respecting (a) the navigation and use by ships of the navigable waters of the Seaway, including the mooring, berthing and loading and unloading of ships and equipment for the loading and unloading of ships; (b) the use and environmental protection of the Seaw ...[+++]

– Que l’article 98 soit modifié par substitution, aux lignes 29 à 41, page 58, de ce qui suit : « 98 (1) Le gouverneur en conseil peut prendre des règlements en vue de la gestion, du contrôle, de l'aménagement et de l'utilisation de la voie maritime et des immeubles ou entreprises connexes, notamment en ce qui touche : a) la navigation et l'usage des eaux navigables de la voie maritime par des navires, y compris le mouillage, l'amarrage, le chargement et le déchargement de ceux-ci, ainsi que l'équipement de chargement et de déchargement; b) l'usage de la voie maritime et des terrains relatifs à la voie maritime et la protection de leur ...[+++]


7 (a) Construction of lines for long-distance railway traffic and of airports [2] with a basic runway length of 2 100 m or more (b) Construction of motorways and express roads [3] (c) Construction of a new road of four or more lanes, or realignment and/or widening of an existing road of two lanes or less so as to provide four or more lanes, where such new road, or realigned and/or widened section of road would be 10 km or more in a continuous length. 8 (a) Inland waterways and ports for inland-waterway traffic which permit the passage ...[+++]

7. a) Construction de voies pour le trafic à grande distance des chemins de fer ainsi que d'aéroports [2] dont la piste de décollage et d'atterrissage a une longueur d'au moins 2 100 mètres. b) Construction d'autoroutes et de voies rapides [3] . c) Construction d'une nouvelle route à quatre voies ou plus, ou alignement et/ou élargissement d'une route existante à deux voies ou moins pour en faire une route à quatre voies ou plus, lorsque la nouvelle route ou la section de route alignée et/ou élargie doit avoir une longueur ininterrompu ...[+++]




datacenter (1): www.wordscope.be (v4.0.br)

'Load hook and connections' ->

Date index: 2023-09-15
w