Boost Your Productivity!Translate documents (Ms-Word, Ms-Excel, ...) faster and better thanks to artificial intelligence!
https://pro.wordscope.com
https://blog. wordscope .com
BBO
Build contacts to maintain news flow
Building contacts to maintain news flow
Buy-Build-Operate
Buy-Build-Operate Projects
Correspond with new contacts to maintain news flow
Financial aid to start new projects
Manage rail construction projects
Manage railway construction projects
Network with new contacts to maintain news flow
New Projects Group
New building
New built house
New projects
Oversee railway building projects
Project manage railway construction initiatives
Standard Rules of Practice for Bid Depositories
Start-up aid
Supervise conservation of heritage buildings projects

Traduction de «build new projects » (Anglais → Français) :

TERMINOLOGIE
voir aussi les traductions en contexte ci-dessous
direct projects for the conservation of heritage buildings | supervise project for the conservation of heritage buildings | supervise conservation of heritage buildings projects | supervise projects for the conservation of heritage buildings

superviser des projets de conservation de bâtiments historiques


new building | new built house

bâtiment neuf | nouvelle construction






Committee on Emergency Power Supply for Buildings (New Standard C2-82)

Committee on Emergency Power Supply for Buildings (New Standard C2-82)


Buy-Build-Operate [ BBO | Buy-Build-Operate Projects ]

achat-construction-exploitation


Standard Rules of Practice for Bid Depositories [ Standard Rules of Practice for Bid Depositories (Federal Government Building Construction Projects) | Standard Canadian Bid Depository Principles and Procedures for Federal Government Projects ]

Règles normatives des bureaux de dépôt des soumissions [ Règles normatives concernant les pratiques des bureaux de dépôt des soumissions (pour les projets de construction d'immeubles du gouvernement fédéral) | Principes et procédures à suivre pour présenter des offres aux dépôts des soumissions concernant les tra ]


start-up aid | financial aid to start new projects

aide financière au démarrage | aide au démarrage | aide financière de départ


manage rail construction projects | oversee railway building projects | manage railway construction projects | project manage railway construction initiatives

gérer des projets de construction de voies ferrées


building contacts to maintain news flow | correspond with new contacts to maintain news flow | build contacts to maintain news flow | network with new contacts to maintain news flow

créer des contacts pour susciter un flux d'informations
TRADUCTIONS EN CONTEXTE
82. Recalls the initial failure to select candidates in connection with the invitation to tender for the Konrad Adenauer Building project because the proposed prices submitted in response to the invitation to tender were considerably higher than the estimates; notes the subsequent decision of the Bureau in 2012 to redesign the calls for tenders for the KAD building, which led to considerably lower offers, allowing for the budget initially agreed upon for this building project to be respected; takes note that works began in September 2013 with a new project manager and enhanced partnership arran ...[+++]

82. rappelle l'échec initial de la procédure de sélection dans l'appel d'offres relatif au projet d'extension du bâtiment Konrad Adenauer, parce que les prix proposés par les soumissionnaires étaient nettement plus élevés que ceux estimés à partir du cahier des charges; prend acte de la décision ultérieure du Bureau en 2012 de reformuler l'appel d'offres pour le bâtiment KAD, qui a abouti à des offres nettement moins élevées, permettant le respect du budget initialement convenu pour ce projet immobilier; constate que les travaux ont débuté en septembre 2013, avec un nouveau chef de projet et des accords de partenariat renforcés assorti ...[+++]


83. Recalls the initial failure to select candidates in connection with the invitation to tender for the Konrad Adenauer Building project because the proposed prices submitted in response to the invitation to tender were considerably higher than the estimates; notes the subsequent decision of the Bureau in 2012 to redesign the calls for tenders for the KAD building, which led to considerably lower offers, allowing for the budget initially agreed upon for this building project to be respected; takes note that works began in September 2013 with a new project manager and enhanced partnership arran ...[+++]

83. rappelle l'échec initial de la procédure de sélection dans l'appel d'offres relatif au projet d'extension du bâtiment Konrad Adenauer, parce que les prix proposés par les soumissionnaires étaient nettement plus élevés que ceux estimés à partir du cahier des charges; prend acte de la décision ultérieure du Bureau en 2012 de reformuler l'appel d'offres pour le bâtiment KAD, qui a abouti à des offres nettement moins élevées, permettant le respect du budget initialement convenu pour ce projet immobilier; constate que les travaux ont débuté en septembre 2013, avec un nouveau chef de projet et des accords de partenariat renforcés assorti ...[+++]


Maximum leverage of the different funding instruments shall be ensured for projects with a Union and Internal Market dimension, which deliver the highest European added-value, and promote social economic and territorial cohesion, in particular those projects implementing the priority transport, energy and digital infrastructure networks as identified in the respective trans-European network policy frameworks, in order to build new infrastructure and substantially upgrade existing infrastructure.

Il convient de maximiser l'effet de levier des différents instruments de financement pour les projets à l'échelle de l'Union et relevant du marché unique, présentant la plus haute valeur ajoutée européenne et qui favorisent la cohésion territorriale et sociale et économique, en particulier pour les projets mettant en œuvre les réseaux prioritaires de transport, d'énergie et d'infrastructures numériques, comme le prévoient les cadres d'action du réseau transeuropéen y afférents, afin de construire de nouvelles infrastructures et de moderniser de manière notable les infrastructures existantes.


Maximum leverage of the different funding instruments shall be ensured for projects with a Union and Internal Market dimension, which deliver the highest European added-value, and promote social economic and territorial cohesion, in particular those projects implementing the priority transport, energy and digital infrastructure networks as identified in the respective trans-European network policy frameworks, in order to build new infrastructure and substantially upgrade existing infrastructure.

Il convient de maximiser l'effet de levier des différents instruments de financement pour les projets à l'échelle de l'Union et relevant du marché unique, présentant la plus haute valeur ajoutée européenne et qui favorisent la cohésion territorriale et sociale et économique, en particulier pour les projets mettant en œuvre les réseaux prioritaires de transport, d'énergie et d'infrastructures numériques, comme le prévoient les cadres d'action du réseau transeuropéen y afférents, afin de construire de nouvelles infrastructures et de moderniser de manière notable les infrastructures existantes.


For more results, go to https://pro.wordscope.com to translate your documents with Wordscope Pro!
Maximum leverage of the different funding instruments shall be ensured for projects with a Union and Internal Market dimension, which deliver the highest European added-value, and promote social economic and territorial cohesion, in particular those projects implementing the priority transport, energy and digital infrastructure networks as identified in the respective trans-European network policy frameworks, in order to build new infrastructure and substantially upgrade existing infrastructure.

Il convient de maximiser l'effet de levier des différents instruments de financement pour les projets à l'échelle de l'Union et relevant du marché unique, présentant la plus haute valeur ajoutée européenne et qui favorisent la cohésion territorriale et sociale et économique, en particulier pour les projets mettant en œuvre les réseaux prioritaires de transport, d'énergie et d'infrastructures numériques, comme le prévoient les cadres d'action du réseau transeuropéen y afférents, afin de construire de nouvelles infrastructures et de moderniser de manière notable les infrastructures existantes.


80. Believes that the Parliament's building policy requires careful analysis and that the administration should continue to develop buildings policy in cooperation with the committee on Budgets; requests therefore to be kept informed on a regular basis on new developments for building projects with a significant financial implications for the budget, such as e.g. the KAD building; the House of European History and building/acquisition projects at the Parliament's places of work; asks to be kept informed about the creation of any ne ...[+++]

80. estime que sa politique immobilière nécessite une analyse minutieuse et que l'administration devrait continuer à développer cette politique en coopération avec la commission des budgets; demande dès lors à être tenu informé à intervalles réguliers de l'évolution des projets immobiliers ayant des implications financières importantes pour le budget, par exemple l'immeuble KAD, la Maison de l'histoire européenne et les projets de construction ou d'acquisition sur ses lieux de travail; demande à être tenu informé de la création de tout nouveau poste dans le cadre du plan triennal de sa direction générale Infrastructures et Logistique, ...[+++]


84. Believes that Parliament's building policy requires careful analysis and that the administration should continue to develop buildings policy in cooperation with the Committee on Budgets; requests therefore to be kept informed on a regular basis on new developments for building projects with a significant financial implications for the budget, such as e.g. the Konrad Adenauer building, the House of European History and building/acquisition projects at Parliament's places of work; asks to be kept informed about the creation of any ...[+++]

84. estime que sa politique immobilière nécessite une analyse minutieuse et que l'administration devrait continuer à développer cette politique en coopération avec la commission des budgets; demande dès lors à être tenu informé à intervalles réguliers de l'évolution des projets immobiliers ayant des implications financières importantes pour le budget, par exemple l'immeuble Konrad Adenauer, la Maison de l'histoire européenne et les projets de construction ou d'acquisition sur ses lieux de travail; demande à être tenu informé de la création de tout nouveau poste dans le cadre du plan triennal de sa direction générale Infrastructures et ...[+++]


Investment projects: projects aiming at building new infrastructure, transforming, modernising, increasing or reducing capacities of existing infrastructure, partial or total decommissioning of existing infrastructure.

Projets d’investissement : projets visant à construire de nouvelles infrastructures, transformer moderniser, accroître ou réduire les capacités des infrastructures existantes, mettre hors service des infrastructures existantes, en tout ou en partie.


It builds on the results of existing projects and initiatives and is supported by a series of new projects co-funded under the e Content plus programme.

Il se fonde sur les résultats de projets et d'initiatives existants et est soutenu par une série de nouveaux projets cofinancés dans le cadre du programme e Content plus.


7. Notes the Court's current buildings projects involving the renovation of the "Palais", a ring-shaped building around the "Palais" and two towers containing offices; asks the Court for a report on the way in which it manages its existing buildings, new building projects, maintenance and infrastructures generally;

7. prend note des projets immobiliers de la Cour, au nombre desquels figure la rénovation du Palais, la construction d'un immeuble de forme annulaire autour du Palais et de deux tours de bureaux; réclame à la Cour un rapport sur la manière dont elle gère ses immeubles actuels, ses nouveaux projets immobiliers, la maintenance et les infrastructures en général;




datacenter (1): www.wordscope.be (v4.0.br)

'build new projects' ->

Date index: 2025-02-15
w