Boost Your Productivity!Translate documents (Ms-Word, Ms-Excel, ...) faster and better thanks to artificial intelligence!
https://pro.wordscope.com
https://blog. wordscope .com
Assemble follow spot
Automatic line follower
Clod
Control rod follower
Curve tracer
Draft gear follower
Draft gear follower block
Draw roof*
Draw slate
Emergency Medical Aid Act
Ensure follow-up care following a heart attack
Ensure follow-up of patients after heart attacks
Follow-me
Follow-me diversion
Follow-me facility
Follow-on
Follow-on posting
Follow-up
Follow-up article
Follow-up on heart-attack patients
Follow-up patients with heart attack
Follow-up posting
Follower
Follower block
Follower plate
Follower rod
Following
Following clod
Following dirt
Following stone
Followup
Graphics tracer
Look-on line follower
Pencil Follower
Pencil follower
Ramble
Set up follow spots
Setting up follow spots
Tend vats following a nitration process
Try out follow spot lighting
Vat tending following a nitration process
Vat washing following a nitration process
Wash vats following a nitration process

Traduction de «for aid following » (Anglais → Français) :

TERMINOLOGIE
voir aussi les traductions en contexte ci-dessous
Emergency Medical Aid Act [ An Act to Protect Persons Rendering Aid Following an Accident or in an Emergency ]

Emergency Medical Aid Act [ An Act to Protect Persons Rendering Aid Following an Accident or in an Emergency ]


ensure follow-up of patients after heart attacks | follow-up on heart-attack patients | ensure follow-up care following a heart attack | follow-up patients with heart attack

assurer le suivi des patients après une crise cardiaque


clod | draw roof* | draw slate | following | following clod | following dirt | following stone | ramble

faux-toit


assemble follow spot | try out follow spot lighting | set up follow spots | setting up follow spots

installer des projecteurs de poursuite


vat tending following a nitration process | vat washing following a nitration process | tend vats following a nitration process | wash vats following a nitration process

utiliser des fûts après une nitration


follow-me | follow-me diversion | follow-me facility

renvoi temporaire


control rod follower | follower | follower rod

allongement d'une barre de commande | prolongateur


follow-up posting [ follow-up | follow-up article | follow-on posting | follow-on | followup ]

suivi [ suivi d'article ]


automatic line follower [ pencil follower | look-on line follower | curve tracer | graphics tracer | Pencil Follower ]

suiveur automatique de courbes [ suiveur de lignes | suiveur de courbes ]


follower block | draft gear follower block | draft gear follower | follower plate

plaque d'appui
TRADUCTIONS EN CONTEXTE
Report altitude in metres followed by “METRES” or in feet followed by “FEET” when on QNH. Report “CLIMBING” (followed by the level) when climbing or “DESCENDING” (followed by the level) when descending to a new level after passing the significant point.

Lorsque l'altimètre est calé sur le QNH, indiquer l'altitude en mètres suivie de “MÈTRES” (“METRES”) ou l'altitude en pieds suivie de “PIEDS” (“FEET”).


EUROPA - EU law and publications - EUR-Lex - EUR-Lex - 52016IP0291 - EN - European Parliament resolution of 23 June 2016 on follow-up of the Strategic Framework for European cooperation in education and training (ET 2020) (2015/2281(INI)) // P8_TA(2016)0291 // Follow-up of the Strategic framework for European cooperation in education and training (ET 2020) // European Parliament resolution of 23 June 2016 on follow-up of the Strategic Framework for European cooperation in education and training (ET 2020) (2015/2281(INI))

EUROPA - EU law and publications - EUR-Lex - EUR-Lex - 52016IP0291 - EN - Résolution du Parlement européen du 23 juin 2016 sur le suivi du cadre stratégique pour la coopération européenne dans le domaine de l’éducation et de la formation (ET 2020) (2015/2281(INI)) // P8_TA(2016)0291 // Suivi du cadre stratégique pour la coopération européenne dans le domaine de l’éducation et de la formation (ET 2020) // Résolution du Parlement européen du 23 juin 2016 sur le suivi du cadre stratégique pour ...[+++]


‘A contract may not be concluded following the decision to award a contract falling within the scope of Directive 2014/25/EU or Directive 2014/23/EU before the expiry of a period of at least 10 calendar days with effect from the day following the date on which the contract award decision is sent to the tenderers and candidates concerned if fax or electronic means are used or, if other means of communication are used, before the expiry of a period of either at least 15 calendar days with effect from the day following the date on which ...[+++]

«La conclusion du contrat qui suit la décision d’attribution d’un contrat relevant du champ d’application de la directive 2014/25/UE ou de la directive 2014/23/UE ne peut avoir lieu avant l’expiration d’un délai d’au moins dix jours calendaires à compter du lendemain du jour où la décision d’attribution du contrat a été envoyée aux soumissionnaires et candidats concernés si un télécopieur ou un moyen électronique est utilisé ou, si d’autres moyens de communication sont utilisés, avant l’expiration d’un délai d’au moins quinze jours calendaires à compter du lendemain du jour où la décision d’attribution du contrat est envoyée aux soumissi ...[+++]


‘A contract may not be concluded following the decision to award a contract falling within the scope of Directive 2014/24/EU or Directive 2014/23/EU before the expiry of a period of at least 10 calendar days with effect from the day following the date on which the contract award decision is sent to the tenderers and candidates concerned if fax or electronic means are used or, if other means of communication are used, before the expiry of a period of either at least 15 calendar days with effect from the day following the date on which ...[+++]

«La conclusion du contrat qui suit la décision d’attribution d’un contrat relevant du champ d’application de la directive 2014/24/UE ou de la directive 2014/23/UE ne peut avoir lieu avant l’expiration d’un délai d’au moins dix jours calendaires à compter du lendemain du jour où la décision d’attribution du contrat a été envoyée aux soumissionnaires et candidats concernés si un télécopieur ou un moyen électronique est utilisé ou, si d’autres moyens de communication sont utilisés, avant l’expiration d’un délai d’au moins quinze jours calendaires à compter du lendemain du jour où la décision d’attribution du contrat est envoyée aux soumissi ...[+++]


For more results, go to https://pro.wordscope.com to translate your documents with Wordscope Pro!
2. A contract may not be concluded following the decision to award a contract falling within the scope of this Directive before the expiry of a period of at least 10 calendar days with effect from the day following the date on which the contract award decision is sent to the tenderers and candidates concerned if fax or electronic means are used or, if other means of communication are used, before the expiry of a period of either at least 15 calendar days with effect from the day following the date on which the contract award decision ...[+++]

2. La conclusion du marché qui suit la décision d’attribution d’un marché relevant du champ d’application de la présente directive ne peut avoir lieu avant l’expiration d’un délai d’au moins dix jours calendaires à compter du lendemain du jour où la décision d’attribution du marché a été envoyée aux soumissionnaires et candidats concernés si un télécopieur ou un moyen électronique est utilisé ou, si d’autres moyens de communication sont utilisés, avant l’expiration d’un délai d’au moins quinze jours calendaires à compter du lendemain du jour où la décision d’attribution du marché est envoyée aux soumissionnaires et candidats concernés, o ...[+++]


It is in charge of humanitarian assistance, the initial assistance done in response to international appeals for aid following a disaster.

C'est cette direction qui est responsable de l'aide humanitaire, de l'aide initiale en réponse aux demandes d'aide internationale à la suite d'une catastrophe.


I will make sure to send you that on TRIPS and the position we're promoting at the council right now on the HIV/AIDS follow-up to the Doha thing.

Je vous ferai parvenir ma réponse sur les ADPIC ainsi que sur la position que nous défendons actuellement au conseil sur le suivi à donner après Doha au dossier du VIH/sida.


For Ireland, following technical adjustments, the level of fishing effort expressed in kilowatt/days has been reduced from 17.383.542 kw/days to 10.229.052 kw/days in particular in Ices area VII In Annex I to the Regulation, for scallops in Ices area VII: For Belgium, following technical adjustments, the level of fishing effort expressed in kilowatt/days has been increased from 326.351 kw/days to 354.066 Kw/days. For Ireland ...[+++]

Pour l'Irlande, à la suite d'ajustements d'ordre technique, le niveau de l'effort de pêche exprimé en kilowatts par jour a été réduit de 17 383 542 à 10 229 052 Kw/jour, en particulier dans la zone VII du CIEM Annexe I du règlement, coquilles St-Jacques dans la zone VII du CIEM: Pour la Belgique, à la suite d'ajustements d'ordre technique, le niveau de l'effort de pêche exprimé en kilowatts par jour a été porté de 326 351 à 354 066 Kw/jour Pour l'Irlande, à la suite d'ajustements d'ordre technique, le niveau de l'effort de pêche exprimé en kilowatts par jour a été réduit de 634 407 à 525 012 Kw/jour Annexe I du règle ...[+++]


In Vancouver, the number-one priority that has been identified is child prostitution, with HIV/AIDS following very closely.

À Vancouver, la toute première priorité est la prostitution enfantine, suivie de très près par le VIH/sida.


The main objectives for 1995 in the field of equal opportunities include the following: - Drawing up the Fourth Action Programme on Equal Opportunities; - Preparing for the 4th World Conference on Women in Beijing in September 1995; - A code of practice on equal pay; - An evaluation of the 1991 Recommendation on the protection of the dignity of women and men at work, with appropriate follow up; - Discussing the burden of proof proposal with the soc ...[+++]

Les principaux objectifs de 1995 sont notamment les suivants: - élaborer le quatrième programme d'action sur l'égalité des chances; - préparatifs de la 4ème conférence mondiale sur les femmes (Pékin, septembre 1995); - code de bonnes pratiques en matière d'égalité des rémunérations; - évaluation de la recommandation de 1991 sur la protection de la dignité des femmes et des hommes au travail, et suivi approprié; - examen, avec les partenaires sociaux, de la proposition relative à la charge de la preuve et suivi du débat sur la conciliation de la vie professionnelle et familiale; - suivi de la recommandation de 1992 sur la garde des e ...[+++]




datacenter (1): www.wordscope.be (v4.0.br)

'for aid following' ->

Date index: 2021-10-30
w