Boost Your Productivity!Translate documents (Ms-Word, Ms-Excel, ...) faster and better thanks to artificial intelligence!
https://pro.wordscope.com
https://blog. wordscope .com
Approximation method
D.a.p.
DAP
Double amplitude peak
Double-amplitude peak
Iteration method
Method of successive approximation
Method of successive approximations
P.p.
PP
Peak load plant
Peak load power plant
Peak load power station
Peak load shaving plant
Peak time
Peak to peak
Peak to peak - numeric estimation technique
Peak viewing
Peak viewing hours
Peak viewing time
Peak viewing-time
Peak-load generating station
Peak-load power station
Peak-load shaving facility
Peak-load station
Peak-shaving facility
Peak-shaving plant
Peak-to-peak
Peak-to-peak amplitude
Peak-to-peak value
Peaking plant
Prime time
Successive approximation converter
Trial-and-error method
Trial-and-error search

Vertaling van "peak at approximate " (Engels → Frans) :

TERMINOLOGIE
successive approximation a/d converter | successive approximation analog/digital converter | successive approximation analogue/digital converter | successive approximation converter

convertisseur analogique numérique par approximations successives


peak load power plant [ peak load power station | peak-load power station | peak load plant | peak-load station | peaking plant | peak-load generating station ]

centrale de pointe [ centrale à charge de pointe | centrale de charge de pointe ]


double-amplitude peak | peak-to-peak amplitude | peak-to-peak value | DAP [Abbr.] | PP [Abbr.]

amplitude de crête à crête | amplitude totale d'oscillation


prime time | peak viewing | peak viewing time | peak viewing-time | peak viewing hours | peak time

période de pointe | heure de forte écoute | heure de grande écoute | heure d'écoute maximum | maximum de grande écoute


peak-to-peak amplitude | p.p. | peak-to-peak value | double amplitude peak | d.a.p.

amplitude totale d'oscillation | amplitude de crête à crête


trial-and-error method | method of successive approximation | method of successive approximations | approximation method | iteration method | trial-and-error search

méthode des approximations successives | méthode des approximations | méthode des itérations | méthode itérative | méthode par tâtonnements | méthode d'approximations successives | méthode par approximations successives | méthode approximative | procédé par tâtonnements


successive approximation A/D converter [ successive approximation analogue/digital converter | successive approximation analog/digital converter ]

convertisseur analogique numérique par approximations successives


peak load shaving plant | peak-load shaving facility | peak-shaving facility | peak-shaving plant

installation d'écrêtement des pointes | unité de peak-shaving | usine d'écrêtement de pointes




Peak to peak - numeric estimation technique

méthode d'estimation numérique : crête à crête
IN-CONTEXT TRANSLATIONS
Thence southeasterly in a straight line to a peak at approximate latitude 61°22′00″ and approximate longitude 125°49′00″, the last aforesaid peak being approximately at the position indicated by the spot elevation 4,511 feet (1375 metres) shown on said Virginia Falls map sheet;

De là, en direction sud-est, en ligne droite, jusqu’à un sommet situé par environ 61°22′00″ de latitude et par environ 125°49′00″ de longitude, ledit sommet étant approximativement situé à la cote d’altitude de 4 511 pieds (1 375 mètres) indiquée sur la carte « Virginia Falls » susmentionnée;


Thence northwesterly in a straight line to a peak at approximate latitude 61°24′00″ and approximate longitude 124°35′00″, said peak being approximately at the spot elevation 6,105 feet (1860.8 metres) shown on said Virginia Falls map sheet;

De là, en direction nord-ouest, en ligne droite, vers un sommet situé par environ 61°24′00″ de latitude et par environ 124°35′00″ de longitude, ledit sommet étant approximativement situé à la cote d’élévation de 6 105 pieds (1 860,8 mètres) indiquée sur ladite carte « Virginia Falls »;


Thence easterly in a straight line to a peak at approximate latitude 61°26′30″ and approximate longitude 125°21′00″, the last aforesaid peak being approximately at the position indicated by the spot elevation 4,497 feet (1370.7 metres) shown on said Virginia Falls map sheet;

De là, en direction est, en ligne droite, jusqu’à un sommet situé par environ 61°26′30″ de latitude et par environ 125°21′00″ de longitude, ledit sommet étant approximativement situé à la cote d’altitude de 4 497 pieds (1 370,7 mètres) indiquée sur la carte « Virginia Falls » susmentionnée;


Thence in general southeasterly and easterly directions along the last aforesaid height of land to a peak at approximate latitude 61°45′30″ and approximate longitude 127°17′00″, the last aforesaid peak being approximately at the position indicated by the spot elevation 8,302 feet (2530.5 metres) shown on said Flat River map sheet;

De là, en direction plus ou moins sud-est et est, en suivant la ligne de faîte desdites hauteurs, jusqu’à un sommet situé par environ 61°45′30″ de latitude et par environ 127°17′00″ de longitude, ledit sommet étant approximativement situé à la cote d’altitude de 8 302 pieds (2 530,5 mètres) indiquée sur la carte « Flat River » susmentionnée;


For more results, go to https://pro.wordscope.com to translate your documents with Wordscope Pro!
Thence southerly in a straight line to a peak at approximate latitude 61°50′00″ and approximate longitude 127°25′30″, the last aforesaid peak being approximately at the position indicated by the spot elevation 8,822 feet (2688.9 metres) shown on said Flat River map sheet;

De là, en direction sud, en ligne droite, jusqu’à un sommet situé par environ 61°50′00″ de latitude et par environ 127°25′30″ de longitude; ledit sommet étant approximativement situé à la cote d’altitude de 8 822 pieds (2 688,9 mètres) indiquée sur la carte « Flat River » susmentionnée;


Investment has fallen by approximately 15% since its peak in 2007.

Par rapport à leur niveau record de 2007, une contraction d'environ 15 % a été enregistrée.


In the case of a non-sinusoidal field, the exposure evaluation carried out in accordance with Article 4 shall be based on the weighted peak method (filtering in time domain), explained in the practical guide as set out in Article 13, but other scientifically proven and validated exposure evaluation procedures can be applied, provided that they lead to approximately equivalent and comparable results.

Dans le cas d'un champ non sinusoïdal, l'évaluation de l'exposition effectuée conformément à l'article 4 est fondée sur la méthode de mesure utilisant la technique de crête pondérée (filtrage dans le domaine temporel), expliquée dans le guide pratique, évoqué à l'article 13; d'autres procédures d'évaluation de l'exposition scientifiquement démontrées et validées peuvent néanmoins être appliquées, pour autant qu'elles mènent à des résultats approximativement équivalents et comparables.


In the case of nonsinusoidal fields, exposure evaluation carried out in accordance with Article 4shall be based on the weighted peak method (filtering in time domain), explained in the practical guide set out in Article 14, but other scientifically proven and validated exposure evaluation procedures can be applied provided that they lead to approximately equivalent and comparable results.

Dans le cas de champs non sinusoïdaux, l'évaluation de l'exposition effectuée conformément à l'article 4 est fondée sur la méthode de mesure utilisant la technique de crête pondérée (filtrage dans le domaine temporel), expliquée dans le guide pratique évoqué à l'article 14; d'autres procédures d'évaluation de l'exposition scientifiquement démontrées et validées peuvent néanmoins être appliquées, pour autant qu'elles mènent à des résultats approximativement équivalents et comparables.


In case of non-sinusoidal field the exposure evaluation carried out in accordance with Article 4 shall be based on the weighted peak method (filtering in time domain), explained in the Commission's practical guide as set out in Article 13, but other scientifically proven and validated exposure evaluation procedures can be applied, provided that they lead to approximately equivalent and comparable results.

Dans le cas d'un champ non sinusoïdal, l'évaluation de l'exposition effectuée conformément à l'article 4 est fondée sur la méthode de mesure utilisant la technique de crête pondérée (filtrage dans le domaine temporel), expliquée dans le guide pratique de la Commission évoqué à l'article 13; d'autres procédures d'évaluation de l'exposition scientifiquement démontrées et validées peuvent néanmoins être appliquées, pour autant qu'elles mènent à des résultats approximativement équivalents et comparables.


In the case of non sinusoidal fields, the exposure evaluation carried out in accordance with Article 4 shall be based on the weighted peak method (filtering in time domain), explained in the practical guide set out in Article 13, but other scientifically proven and validated exposure evaluation procedures can be applied provided that they lead to approximately equivalent and comparable results.

Dans le cas de champs non sinusoïdaux, l'évaluation de l'exposition effectuée conformément à l'article 4 est fondée sur la méthode de mesure utilisant la technique de crête pondérée (filtrage dans le domaine temporel), expliquée dans le guide pratique évoqué à l'article 13; d'autres procédures d'évaluation de l'exposition scientifiquement démontrées et validées peuvent néanmoins être appliquées, pour autant qu'elles mènent à des résultats approximativement équivalents et comparables.


w