Boost Your Productivity!Translate documents (Ms-Word, Ms-Excel, ...) faster and better thanks to artificial intelligence!
https://pro.wordscope.com
https://blog. wordscope .com
Audio visual presentation
Audio-visual display
Audio-visual presentation
Audiovisual display
Audiovisual presentation
Audiovisual show
Auditory and visual presentation
Base of the rail
Conductor rail
Conductor-rail
Continuous lengths of rails
Continuous welded rail track
Flange of rail
Foot of the rail
Improve delivery of rail service
Improve rail service delivery
Live rail
Locomotive
Long lengths of rails
Long welded rails
Operate rail grinder
Operation of rail grinder
Rail base
Rail connection
Rail grinder operation
Rail network
Rail traffic
Rail transport
Railway
Railway carriage
Railway equipment
Railway line
Railway track
Railways
Ribbon rails
Third rail
Train
Trains
Tram
Transport by railway
Use of rail grinder
Vehicle on rails

Traduction de «present rail » (Anglais → Français) :

TERMINOLOGIE
voir aussi les traductions en contexte ci-dessous
continuous lengths of rails | continuous welded rail track | long lengths of rails | long welded rails | ribbon rails

barres longues | barres soudées de grande longueur | longs rails soudés | rails longs | rails soudés en barres longues


rail transport [ rail connection | rail traffic | railway | transport by railway | Railways(ECLAS) ]

transport ferroviaire [ chemin de fer | liaison ferroviaire | trafic ferroviaire | transport par chemin de fer ]


develop and implement rail service improvement procedures | improve delivery of rail service | design and implement rail service improvement processes | improve rail service delivery

améliorer la prestation des services ferroviaires


interpret rail-flaw-detection machine graphical recordings | use graphical recordings produced by rail-flaw-detection machines to identify faults | interpret graphical interface of rail-flaw-detection machine | interpret graphical recordings of rail-flaw-detection machine

interpréter les enregistrements graphiques de la machine de détection des défauts des rails


rail grinder operation | use of rail grinder | operate rail grinder | operation of rail grinder

utiliser une meuleuse de rails


base of the rail | flange of rail | foot of the rail | rail base

patin du rail


conductor rail | conductor-rail | live rail | third rail

rail conducteur | rail d'alimentation | rail de contact | troisième rail de contact


audio-visual presentation [ audio visual presentation | audiovisual presentation | auditory and visual presentation | sound/vision presentation | audiovisual display | audio-visual display | audiovisual show ]

présentation audiovisuelle [ montage audiovisuel | présentation audio-visuelle | montage audio-visuel ]


rail network [ railway line | railway track ]

réseau ferroviaire [ ligne ferroviaire | voie ferrée ]


vehicle on rails [ locomotive | railway carriage | railway equipment | train | tram | Trains(ECLAS) ]

véhicule sur rails [ locomotive | matériel ferroviaire | train | tram | wagon ]
TRADUCTIONS EN CONTEXTE
The present rail transport network has limited available capacity to absorb any increase of trans-European traffic flows, leading to a reduction of attractiveness of rail for freight transport.

Le réseau ferroviaire actuel n'est pas en mesure d'absorber une augmentation des flux de trafic transeuropéens, ce qui le rend moins intéressant pour le transport de marchandises.


(2) projects in the rail sector: Evaluation of the contract of the project manager, presentation of the new master plan for the Thriassio rail complex, examination of contracts and supplements for the purchase of supplies and the construction of the rail projects, monitoring of the rail projects: project No 94/09/65/004 electrification of the Piraeus-Athens-Thessaloniki line, project No 93/94/09/65/009 Evangelismos-Leptokarya, projects Nos 94/09/65/011, 95/09/65/034 rail complex at Thriassio and lines linking Thriassio with the networ ...[+++]

(2) projets du secteur « rails » : Évaluation du contrat du project manager, présentation du nouveau master plan pour le complexe ferroviaire de Thriassio, examen des contrats et leurs avenants relatifs à l'acquisition de fournitures et la construction des projets rails, suivi des projets rails : projet n° 94.09.65.004 électrification de la traction sur la voie des chemins de fer entre Le Pirée Athènes et Thessalonique, projet n° 93,94.09.65.009 Evangelismos - Leptokarya, projets n° 94.09.65.011, 95.09.65.034 Complexe ferroviaire de la gare de Thriassio e ...[+++]


* The "rail infrastructure package": In 1998 the Commission presented three rail infrastructure proposals: the "infrastructure package".

* Le "paquet infrastructure ferroviaire": en 1998, la Commission a présenté trois propositions relatives à l'infrastructure du rail, formant le "paquet infrastructure".


(7) On tenders of the Vanderbilt type, with three filling holes, there shall be a hand rail four inches above the level of the top running board not less than one inch in diameter, extending from the present hand rail, which extends from the coal space to within 20 inches of the first filling hole, to the rear end of the tender at each side of the top running board.

(7) Sur les tenders du type Vanderbilt ayant trois trous de remplissage, il doit y avoir, à quatre pouces au-dessus du niveau de la passerelle du dessus, une main courante d’au moins un pouce de diamètre. Cette main courante doit s’étendre de la main courante existante, qui va de la soute à charbon à moins de 20 pouces du premier trou de remplissage, jusqu’à l’extrémité arrière du tender, de chaque côté de la passerelle du dessus.


For more results, go to https://pro.wordscope.com to translate your documents with Wordscope Pro!
INVITATION - PRESS BRIEFING to present the Court’s Special Report on: Improving transport performance on Trans-European rail axes: Have EU rail infrastructure investments been effective?

INVITATION – POINT DE PRESSE pour la présentation du rapport spécial de la Cour des comptes: Amélioration de la performance des transports sur les axes ferroviaires transeuropéens: les investissements de l'UE en matière d'infrastructures ferroviaires ont-ils été efficaces?


In view of the gradual approach to eliminating obstacles to the interoperability of the rail system and of the time consequently required for the adoption of TSIs, steps should be taken to avoid a situation where Member States adopt new national rules or undertake projects that increase the diversity of the present system.

Compte tenu de l'approche progressive visant à la suppression des obstacles à l'interopérabilité du système ferroviaire et du temps nécessaire pour adopter les STI, il convient d'éviter que les États membres adoptent de nouvelles règles nationales ou s'engagent dans des projets qui accroissent la diversité du système existant.


Question No. 63 Mr. John Cummins: With regard to the expansion of the Roberts Bank Port Facility to include a third berth and a second terminal as per the Tsawwassen Final Agreement and related Side-Agreements, the Memorandum of Agreement between the Tsawwassen Band and the Vancouver Port Authority, and the related Settlement Agreement between the Tsawwassen Band, Canada, British Columbia (B.C.), Vancouver Port Authority, B.C. Ferry Services, B.C. Rail Ltd and B.C. Transportation and Financing Authority: (a) how many acres (or hectares) of farm land will be used for Roberts Bank port and rail related developments now underway or under st ...[+++]

Question n 63 M. John Cummins: En ce qui concerne les travaux d’expansion du port Roberts Bank consistant à ajouter un troisième poste de mouillage et un second terminal selon l’Accord définitif Tsawwassen et les accords parallèles connexes, le Protocole d’entente entre la bande de Tsawwassen et l’Administration portuaire de Vancouver et l’entente de règlement connexe intervenue entre la bande de Tsawwassen, le Canada, la Colombie-Britannique (C.-B.), l’Administration portuaire de Vancouver, B.C. Ferry Services, B.C. Rail Ltd et B.C. Transportation and Financing Authority: a) combien d’acres (ou d’hectares) de terres agricoles seront néc ...[+++]


This Communication looks at the key challenges of harmonisation of rail signalling and its costs and benefits for the different stakeholders, and presents the Commission’s strategy for achieving it.

Cette Communication reprend les principaux enjeux liés à l’harmonisation de la signalisation ferroviaire, ses coûts et ses bénéfices pour les différents acteurs, et présente la stratégie de la Commission pour y parvenir.


Today in Brussels the European Rail Research Advisory Council (ERRAC) presented a comprehensive Strategic Rail Research Agenda (SRRA), which identifies key scientific and technological priorities for both passenger and freight rail transport over the next 20 years.

L'ERRAC (European Rail Research Advisory Council - Conseil consultatif européen pour la recherche sur le rail) a présenté aujourd'hui à Bruxelles un vaste programme stratégique de recherche sur le transport ferroviaire qui recense les grandes priorités scientifiques et techniques du transport ferroviaire de voyageurs et de marchandises pour les 20 prochaines années.


Mr. Raymond Bonin (Nickel Belt, Lib.): Mr. Speaker, I have the honour to present, in both official languages, the fourth report of the Standing Committee on Transport with respect to the review of passenger rail services offered by VIA Rail and the means to revitalize this important mode of transportation within the context of the fiscal and environment concerns facing the government entitled “The Renaissance of Passenger Rail in Canada”.

M. Raymond Bonin (Nickel Belt, Lib.): Monsieur le Président, j'ai l'honneur de présenter, dans les deux langues officielles, le quatrième rapport du Comité permanent des transports concernant l'examen du service passager qu'offre VIA Rail, et les moyens de revitaliser cet important mode de transport dans le contexte des préoccupations financières et environnementales du gouvernement. Ce rapport est intitulé: «La renaissance des services ferroviaires voyageurs au Canada».


w