Boost Your Productivity!Translate documents (Ms-Word, Ms-Excel, ...) faster and better thanks to artificial intelligence!
https://pro.wordscope.com
https://blog. wordscope .com
Comprehensive records schedule
Detailed scheduling
Disposal schedule
Establish priorities in pipeline networks
Operations scheduling
Order scheduling
Passenger car priority schedule
Priority schedule
Priority scheduling
Priority scheduling system
Priority-based scheduling
Production scheduling
Program
Program schedule
Programme
Programme schedule
Programming grid
Radio schedule
Records disposition schedule
Records retention schedule
Retention schedule
Schedule
Scheduling priority
Set management priorities in pipeline networks
Set priorities in pipeline networks
Shop scheduling
Time schedule
Transfer schedule

Vertaling van "priority schedule " (Engels → Frans) :

TERMINOLOGIE


priority scheduling system

système d'ordonnancement par priorité




passenger car priority schedule

liste des priorités pour les voitures de tourisme


priority-based scheduling

ordonnancement des tâches avec priorité


establish priorities in pipeline networks | set priorities in pipeline networks | direct priorities in priorities in pipeline infrastructure networks | set management priorities in pipeline networks

définir les priorités de gestion dans les réseaux de canalisations de transport | définir les priorités de gestion dans les réseaux de pipelines




comprehensive records schedule | disposal schedule | records disposition schedule | records retention schedule | retention schedule | transfer schedule

tableau de gestion


detailed scheduling | operations scheduling | production scheduling | order scheduling | shop scheduling

ordonnancement de la production


program schedule | programme schedule | programming grid | program | programme | radio schedule | schedule | time schedule

grille de programmes | grille horaire | programme des émissions | calendrier des émissions | programme | horaire
IN-CONTEXT TRANSLATIONS
The strategy therefore sets out a list of priorities and a schedule for putting them into practice.

La stratégie établit donc une liste de priorités et un calendrier de réalisation.


To this end, the strategy draws up a list of priorities and a work schedule for the period 2003-2006.

À cette fin, la stratégie établit une liste de priorités et un calendrier de travail pour la période 2003-2006.


Priority schedule for the remainder of 2008

Chapitres prioritaires à clôturer d’ici la fin de 2008


Priority schedule for the second half of 2009

Chapitres prioritaires à clôturer pour le second semestre de 2009


For more results, go to https://pro.wordscope.com to translate your documents with Wordscope Pro!
Priority schedule for the first half of 2009

Chapitres prioritaires à clôturer pour le premier semestre de 2009


In order to reach the final phase of the accession negotiations by the end of 2009, it would be necessary for Croatia to complete its work on the closing benchmarks sufficiently in time as to allow for the closure of chapters according to the following priority schedule:

Pour atteindre la phase finale des négociations d’adhésion d’ici la fin de 2009, la Croatie devrait mener à leur terme les travaux qu’elle a entrepris pour respecter les critères fixés pour la clôture des chapitres, et ce dans un délai suffisant pour permettre cette clôture selon le calendrier des priorités présenté ci-après.


(11) Regular services at airports should be given priority which should be administered strictly without distinction between scheduled and non-scheduled services.

(11) Les opérations à caractère régulier dans un aéroport devraient recevoir une priorité stricte sans distinction entre services réguliers et non réguliers.


(11) Regular services at airports should be given priority which should be administered strictly without distinction between scheduled and non-scheduled services.

(11) Les opérations à caractère régulier dans un aéroport devraient recevoir une priorité stricte sans distinction entre services réguliers et non réguliers.


However, the slower programmes still do not seem to be overly behind schedule; the delays are partly due to implementation periods that are generally longer than the average necessary for aid schemes in the private sector (priority 1) and projects managed at local level (priority 5).

Les retards ne sont cependant pas trop importants. Ils résultent partiellement de délais inutilement longs en ce qui concerne les régimes d'aide au secteur privé (axe 1) et les projets de compétence communale (axe 5).


For the EHRD OP, implementation under the Employment and Adaptability priorities was on schedule. It was somewhat behind under the Entrepreneurship and Equal Opportunities pillars.

En ce qui concerne le programme opérationnel EHRD, la mise en oeuvre au titre des axes prioritaires Emploi et Capacité d'adaptation a respecté le calendrier, mais un léger retard a été constaté au niveau des piliers Esprit d'entreprise et Égalité des chances.


w