Boost Your Productivity!Translate documents (Ms-Word, Ms-Excel, ...) faster and better thanks to artificial intelligence!
https://pro.wordscope.com
https://blog. wordscope .com
Building with blocks of gypsum
Construct non-load bearing walls
Deposit of load
Gypsum-block wall building
LOT procedure
Load capacity
Load carrying capacity
Load heavy items on pallets
Load on top
Load on top procedure
Load on top system
Load range
Load rating
Load timber onto a skidder
Load-carrying capacity
Load-on-top
Load-on-top method
Load-on-top procedure
Load-on-top system
Loading point
Loading timber onto a skidder
Maximum design tyre load
Maximum load capacity
Maximum load rating
Maximum load-carrying capacity
Peak load plant
Peak load power plant
Peak load power station
Peak-load generating station
Peak-load power station
Peak-load station
Peaking plant
Place gypsum blocks
Place of loading
Place of loading on IWT vessel
Place of loading on inland waterways transport vessel
Placing heavy items on pallets
Placing of load
Placing timber onto a skidder
Stack heavy items on pallets
Stacking heavy items on pallets
Timber loading onto a skidder
Tire load capacity
Tire load rating
Tire rating

Traduction de «Place loading » (Anglais → Français) :

TERMINOLOGIE
voir aussi les traductions en contexte ci-dessous
place of loading on inland waterways transport vessel | place of loading on IWT vessel

lieu de chargement sur un bateau


placing timber onto a skidder | timber loading onto a skidder | load timber onto a skidder | loading timber onto a skidder

charger du bois sur une débusqueuse




placing heavy items on pallets | stacking heavy items on pallets | load heavy items on pallets | stack heavy items on pallets

charger des objets lourds sur des palettes


construct non-load bearing walls | gypsum-block wall building | building with blocks of gypsum | place gypsum blocks

poser des carreaux de plâtre




placing of load [ deposit of load ]

déposé de la charge


tire load capacity | load rating | maximum load rating | load capacity | maximum load capacity | maximum load-carrying capacity | tire rating | load range | tire load rating | load carrying capacity | load-carrying capacity | maximum design tyre load

capacité de charge | capacité de charge maximale | limite de charge | capacité nominale | capacité nominale maximale | charge nominale | charge nominale maximale | limite de charge nominale | charge maximale calculée par pneumatique


load on top [ load-on-top | load on top procedure | load-on-top procedure | LOT procedure | load-on-top system | load on top system | load-on-top method ]

chargement sur résidus [ système de chargement sur résidus | méthode de chargement sur résidus | load on top | chargement sur résidu | chargement par dessus | chargement par le dessus | chargé en dessus ]


peak load power plant [ peak load power station | peak-load power station | peak load plant | peak-load station | peaking plant | peak-load generating station ]

centrale de pointe [ centrale à charge de pointe | centrale de charge de pointe ]
TRADUCTIONS EN CONTEXTE
(c) where in the case of any ship the subdivision load line marks assigned are located below the lowest of the ordinary load lines, the latter load lines, if the owner so desires, need not be placed on the ship’s sides; for such cases the ship’s sides shall be marked with the deck line, the disc, the horizontal line through the centre of the disc, the subdivision load line or lines and the fresh water load line; the fresh water load line mark shall be placed at the same distance above the disc as if the disc were in its normal posit ...[+++]

c) dans le cas de tout navire, on pourra omettre de marquer sur la muraille du navire les lignes de charge ordinaires les plus basses, si le propriétaire le désire, lorsque les marques de lignes de charge de compartimentage assignées seront situées au-dessous; dans ce cas, le livet de pont, le disque, la ligne horizontale passant par le centre du disque, la ou les lignes de charge de compartimentage et la ligne de charge en eau douce seront marqués sur la muraille; la marque de la ligne de charge en eau douce sera placée à la même distance au-dessus du disque que si le disque était à sa position normale; la ligne de charge en eau douc ...[+++]


12. The master of a Canadian vessel that holds an International Load Line Certificate, a Local Load Line Certificate or an International Load Line Exemption Certificate shall, before leaving a place to proceed on an international voyage, post the particulars of the draughts and freeboards in a conspicuous place on board the vessel and keep them legible until the vessel arrives at another place.

12. Le capitaine d’un bâtiment canadien titulaire d’un certificat international de franc-bord, d’un certificat local de franc-bord ou d’un certificat international d’exemption pour le franc-bord affiche, avant de quitter un lieu pour entreprendre un voyage international, les renseignements détaillés sur les tirants d’eau et les francs-bords à un endroit bien en vue à bord du bâtiment et s’assure qu’ils demeurent lisibles jusqu’à ce que le bâtiment arrive à un autre lieu.


17. If a load is kept on a weighing and load-receiving element under stable environmental conditions, the difference between the weight indication obtained immediately after placing the load on the element and the weight indication observed during the following 30 minutes shall not exceed the absolute value of the applicable limits of error for that load.

17. Pour toute charge maintenue sur le dispositif peseur et récepteur de charge dans des conditions ambiantes stables, l’écart entre l’indication pondérale obtenue immédiatement après le dépôt de la charge et l’indication observée pendant les trente minutes qui suivent ne peut excéder la valeur absolue de la marge de tolérance applicable à cette charge.


Each line shall be 230 mm long and 25 mm wide, extend abaft the vertical line, be placed so that its upper edges mark the appropriate assigned salt water freeboards and be marked with letters in the same fashion as for the fresh water load lines but placed abaft the salt water load lines.

Chaque bande est d’une longueur de 230 mm et d’une largeur de 25 mm, s’étend à l’arrière de la ligne verticale et est placée de façon que ses bords supérieurs indiquent les francs-bords en eau salée assignés appropriés et sont marquées au moyen de lettres comme pour les lignes de charge en eau douce, mais placées à l’arrière de ces lignes de charge en eau salée.


For more results, go to https://pro.wordscope.com to translate your documents with Wordscope Pro!
(Return tabled) Question No. 129 Mr. Alex Atamanenko: With regard to the horse slaughter industry in Canada: (a) what is the government’s policy on requiring medical history on equine identity documents (EID) only for the last six months of a horse’s life, and not for an entire lifespan; (b) does the government have information on what happened to the meat from the racehorse Backstreet Bully, who had been administered several courses of a variety of banned medications throughout its lifetime, prior to being sold into the slaughter pipeline, and what are the details of Backstreet Bully’s EID and all other traceability documents and records; (c) does the government have information on what happened to the meat from the racehorse Silky Shark ...[+++]

(Le document est déposé) Question n 129 M. Alex Atamanenko: En ce qui concerne l’industrie de l’abattage des chevaux au Canada: a) quelle est la politique du gouvernement relative au fait qu’il n’est pas nécessaire d’avoir un document d’information équine (DIE) sauf pour les derniers six mois de la vie d’un cheval et non depuis sa naissance; b) le gouvernement dispose-t-il d’information sur ce qui est advenu de la viande du cheval de course Backstreet Bully, auquel on a administré plusieurs séries de médicaments bannis tout au long de sa vie, avant d’être vendue à la chaîne d’abattage, et quels sont les détails du DIE de Backstreet Bull ...[+++]


The hand pallet trucks are only designed to raise a load, by pumping the tiller, to a height sufficient for transporting and do not have any other additional functions or uses such as for example: (i) to move and to lift the loads in order to place them higher or assist in storage of loads (highlifters); (ii) to stack one pallet above the other (stackers); (iii) to lift the load to a working level (scissorlifts); or (iv) to lift and to weigh the loads (weighing trucks).

Les transpalettes à main sont uniquement conçus pour soulever une charge, en actionnant le timon comme une pompe, jusqu’à une hauteur suffisante pour en permettre le transport, et n’ont aucune fonction ou utilisation additionnelles qui permettraient, par exemple: i) de déplacer et de soulever les charges en vue de les placer à une hauteur plus grande ou de faciliter le stockage des charges (élévateurs); ii) d’empiler une palette sur l’autre (gerbeurs); iii) de soulever la charge jusqu’à la hauteur d’un plan de travail (tables élévatrices); ou iv) de soulever ou de peser les charges (chariots peseurs).


The hand pallet trucks are only designed to raise a load, by pumping the tiller, to a height sufficient for transporting and do not have any other additional functions or uses such as for example (i) to move and to lift the loads in order to place them higher or assist in storage of loads (highlifters), (ii) to stack one pallet above the other (stackers), (iii) to lift the load to a working level (scissorlifts) or (iv) to lift and to weigh the loads (weighing trucks).

Les transpalettes à main sont uniquement conçus pour soulever une charge, en actionnant le timon comme une pompe, jusqu'à une hauteur suffisante pour le transport et n'ont aucune fonction ou utilisation additionnelle, qui permettrait, par exemple: i) de déplacer et de soulever les charges en vue de les placer à une plus grande hauteur ou de faciliter le stockage des charges (élévateurs); ii) d'empiler une palette sur l'autre (gerbeurs); iii) de soulever la charge jusqu'à la hauteur d'un plan de travail (tables élévatrices); ou iv) de soulever et de peser les charges (chariots peseurs).


HPT are only designed to raise a load, by pumping the tiller, to a height sufficient for transporting and do not have any other additional functions or uses such as for example (i) to move and to lift the loads in order to place them higher or assist in storage of loads (highlifters), (ii) to stack one pallet above the other (stackers), (iii) to lift the load to a working level (scissorlifts) or (iv) to lift and to weigh the loads (weighing trucks).

Les TM sont uniquement conçus pour soulever une charge, en actionnant le timon comme une pompe, jusqu’à une hauteur suffisante pour en permettre le transport, et n’ont aucune fonction ou utilisation additionnelles qui permettraient, par exemple: i) de déplacer et de soulever les charges en vue de les placer à une hauteur plus grande ou de faciliter le stockage des charges (élévateurs); ii) d’empiler une palette sur l’autre (gerbeurs); iii) de soulever la charge jusqu’à la hauteur d’un plan de travail (tables élévatrices); ou iv) de soulever ou de peser les charges (chariots peseurs).


If a lock-off device is fitted to the child restraint and acts upon the diagonal belt, place load cell 2 at a convenient position behind the child restraint between the lock-off device and the buckle as shown above.

Si une pince d’arrêt est montée sur le dispositif de retenue et agit sur la sangle diagonale, placer le dynamomètre no 2 en un point approprié derrière le dispositif de retenue pour enfants, entre la pince d’arrêt et la boucle, comme indiqué ci-dessus.


lifting accessory’ means a component or equipment not attached to the lifting machinery, allowing the load to be held, which is placed between the machinery and the load or on the load itself, or which is intended to constitute an integral part of the load and which is independently placed on the market; slings and their components are also regarded as lifting accessories;

«accessoire de levage»: composant ou équipement non lié à la machine de levage, permettant la préhension de la charge, qui est placé soit entre la machine et la charge, soit sur la charge elle-même, ou qui est destiné à faire partie intégrante de la charge et est mis isolément sur le marché; sont également considérés comme accessoires de levage les élingues et leurs composants;


w