Boost Your Productivity!Translate documents (Ms-Word, Ms-Excel, ...) faster and better thanks to artificial intelligence!
https://pro.wordscope.com
https://blog. wordscope .com
Car load
Carload
Complete wagon load
Complete wagon-load
Display planned load
Eccentric load
Eccentric loading
Ensure compliance with stowage plan
Ensure goods are loaded according to stowage plan
Ensure safe loading of goods according to stowage plan
Excentric load
Excentric loading
Freeboard load line
Full wagon load
Full wagon-load
LOT procedure
Legal load line
Load capacity
Load carrying capacity
Load line
Load line mark
Load on top
Load on top procedure
Load on top system
Load planned load
Load range
Load rating
Load waterline
Load-carrying capacity
Load-on-top
Load-on-top method
Load-on-top procedure
Load-on-top system
Loading lines
Loadline mark
Maximum design tyre load
Maximum load capacity
Maximum load rating
Maximum load-carrying capacity
Off-centre loading
Perform freight loading preparation
Prepare loading activity resources
Prepare resources for loading activities
Ready loading activity resources
Tire load capacity
Tire load rating
Tire rating
Wagon load

Vertaling van "Loading plan " (Engels → Frans) :

TERMINOLOGIE
ensure compliance with stowage plan | ensure loading of goods in accordance with stowage plan | ensure goods are loaded according to stowage plan | ensure safe loading of goods according to stowage plan

assurer le chargement sécurisé des marchandises selon le plan d'arrimage






tire load capacity | load rating | maximum load rating | load capacity | maximum load capacity | maximum load-carrying capacity | tire rating | load range | tire load rating | load carrying capacity | load-carrying capacity | maximum design tyre load

capacité de charge | capacité de charge maximale | limite de charge | capacité nominale | capacité nominale maximale | charge nominale | charge nominale maximale | limite de charge nominale | charge maximale calculée par pneumatique


load on top [ load-on-top | load on top procedure | load-on-top procedure | LOT procedure | load-on-top system | load on top system | load-on-top method ]

chargement sur résidus [ système de chargement sur résidus | méthode de chargement sur résidus | load on top | chargement sur résidu | chargement par dessus | chargement par le dessus | chargé en dessus ]


eccentric load | eccentric loading | excentric load | excentric loading | off-centre loading

charge excentrée | charge excentrique


complete wagon load | complete wagon-load | full wagon load | full wagon-load | wagon load | carload | car load

charge complète | wagon complet


load line | loading lines | load line mark | loadline mark | freeboard load line | legal load line | load waterline

ligne de charge | ligne de flottaison en charge | marque de ligne de charge


organise loads according to capacity of lifting equipment | organise weight of loads according to lifting device capacity | organise weight of loads according to capacity of lifting equipment | organise weight of loads according to lifting equipment capacity

organiser le poids de charges en fonction de la capacité d’équipements de levage


perform freight loading preparation | ready loading activity resources | prepare loading activity resources | prepare resources for loading activities

préparer des ressources pour les activités de chargement
IN-CONTEXT TRANSLATIONS
Security of supply, interoperability and secure system operation shall be measured in line with the analysis made in the latest available 10-year network development plan in electricity, notably by assessing the impact of the project on the loss of load expectation for the area of analysis as defined in Annex V. 10 in terms of generation and transmission adequacy for a set of characteristic load periods, taking into account expected changes in climate-related extreme weather events and their impact on infrastructure resilience.

sécurité de l'approvisionnement, interopérabilité et sécurité de fonctionnement du système: ces critères sont mesurés conformément à l'analyse effectuée dans le dernier plan décennal de développement du réseau disponible dans le secteur de l'électricité, notamment en estimant l'incidence du projet sur la prévision de perte de charge pour la zone d'analyse définie à l'annexe V, point 10), en termes d'adéquation de la production et du transport pour une série de périodes de charge caractéristiques, compte tenu des changements prévisibles en matière de phénomènes climatiques extrêmes et de leur impact sur la résilience des infrastructures.


Conducting load and non-regression tests (planning, resources management and performance).

Effectuer des tests de charge et de non-régression (planification, gestion des ressources et réalisation).


(c) inspection before loading, in accordance with the frequency specified in the plan and in liaison with marine facilities, of vehicles to be loaded on board ro-ro vessels, car-carriers and passenger vessels; and

c) l’inspection avant le chargement, en collaboration avec des installations maritimes, des véhicules à charger sur des bâtiments rouliers, des bâtiments transportant des véhicules et des bâtiments à passagers, selon la fréquence prévue au plan;


(l) the authorized screening before loading, at the frequency specified in the vessel security plan and in liaison with a marine facility, of a defined percentage of vehicles to be loaded aboard a passenger vessel;

l) le contrôle avant le chargement, en collaboration avec une installation maritime, d’un pourcentage défini des véhicules devant être chargés à bord d’un bâtiment à passagers, selon la fréquence prévue au plan de sûreté du bâtiment;


For more results, go to https://pro.wordscope.com to translate your documents with Wordscope Pro!
The debt loads students are carrying and the implications for long-term family financial planning implicit in those debt loads for many people put a question mark around whether they will be able to keep their kids in school.

La lourde dette des étudiants et les répercussions que cela a pour la planification financière familiale à long terme amènent bien des gens à se demander s'ils pourront garder leurs enfants à l'école.


Mr. Norman: If I understand your question correctly, the answer might be 100 per cent, so that all the projected load growth over the 20-year planning period of the plan will be met largely through conservation.

M. Norman : Si je comprends bien votre question, la réponse pourrait être 100 p. 100, c'est-à-dire que toute la croissance projetée de la charge au cours de la période de 20 ans prévue dans le plan serait largement comblée par la conservation.


those peak load and back-up electricity generating installations which are planned to operate under 1 500 operating hours per year as a rolling average over a period of five years, based on a verification procedure established by the Member States ensuring that this exemption criterion is met.

les installations de production d'électricité utilisées dans les périodes de pointe de charge ou de secours qui sont conçues pour fonctionner moins de 1 500 heures d'exploitation par an en moyenne mobile calculée sur une période de cinq ans, sur la base d'une procédure de vérification établie par les États membres afin de garantir le respect de ce critère.


It should also be possible to exempt peak-load and back-up electricity generation installations which are planned to operate under 1 500 operating hours per year as a rolling average over a period of five years from the requirement to also provide heat.

Il devrait être également possible d'exempter les installations de production d'électricité de pointe et de secours qui sont conçues pour fonctionner moins de 1 500 heures d'exploitation par an en moyenne mobile calculée sur une période de cinq ans de l'obligation de fournir également de la chaleur.


I'm wondering if that's really your position, and how you respond to the off-loading of the federal government over the last decade: billions of dollars in cuts in transfer payments for education and health; dismantling of the Canada Assistance Plan; changes to the EI; loading all of those needs on to the provincial government that isn't resource-rich like Alberta.

Je me demande si c'est vraiment là votre position, et comment vous réagissez au délestage de responsabilités que pratique le gouvernement fédéral depuis 10 ans : réduction des paiements de transfert au titre de l'éducation et de la santé qui totalisent des milliards et des milliards de dollars; démantèlement du Régime d'assistance publique du Canada; modifications apportées à l'A-E. Tous ces besoins doivent être pris en charge par un gouvernement provincial qui n'a pas autant de ressources que l'Alberta.


loading and unloading plans in line with the 1974 SOLAS Convention are agreed between the shipmaster and the terminal representative before any work begins

des plans de chargement ou de déchargement conformes à la convention SOLAS de 1974 soient convenus entre le capitaine de navire et le représentant du terminal avant de procéder à toute opération.


w