Boost Your Productivity!Translate documents (Ms-Word, Ms-Excel, ...) faster and better thanks to artificial intelligence!
https://pro.wordscope.com
https://blog. wordscope .com
Aerial line
Budget constraint line
Budget line
Carrier cable
Center line
Center service line
Center stripe
Centerline
Centre line
Centre service line
Centre stripe
Centreline
Consumer possibility line
Consumption possibility line
Drag line
GEC-Alsthom TGV
Half court line
Half-court line
Haul line
Haulage cable
Haulage line
Income line
Isocost line
Lead line
Line of best fit
Line of closest fit
Line sync.pulse
Line synchronising pulse
Line synchronising signal
Line synchronizing pulse
Line synchronizing signal
Linear regression line
Main cable
Main lead
Main line
Middle-line
Operating line
Regression line
Skidder line
Skidding line
Sky line
Skyline
Track cable
Track line
Traction cable
Traction line
Traction rope
Trend line
Wealth constraint line
Yarding line

Traduction de «tgv line » (Anglais → Français) :

TERMINOLOGIE
voir aussi les traductions en contexte ci-dessous
drag line | haulage cable | haulage line | lead line | main cable | main lead | main line | operating line | skidder line | skidding line | traction cable | traction line | traction rope | yarding line

câble de traction | câble tracteur principal




A very rare tumor of the intestine, originating from the epithelium of the anal canal (including the mucosal surface, anal glands, and lining of fistulous tracts), macroscopically appearing as a nodular, often ulcerated, invasive mass located in the

adénocarcinome du canal anal


line of best fit | line of closest fit | linear regression line | regression line | trend line

droite d'ajustement | droite de régression | ligne de tendance


line sync.pulse | line synchronising pulse | line synchronising signal | line synchronizing pulse | line synchronizing signal

signal de synchronisation de ligne | signal de synchronisation ligne


sky line | skyline | aerial line | track line | track cable | main cable | main line | carrier cable | main lead | lead line | operating line | haul line | haulage line | haulage cable

câble porteur | câble tracteur principal


centre service line [ center service line | centre line | center line | centreline | centerline | half-court line | half court line | centre stripe | center stripe | middle-line ]

ligne médiane de service [ ligne médiane ]


budget line [ consumer possibility line | consumption possibility line | isocost line | income line | budget constraint line | wealth constraint line ]

droite de budget [ ligne d'iso-coût | ligne budgétaire des possibilités de consommation | ligne des possibilités d'achat du consommateur | droite d'iso-dépense ]


Collision of powered aircraft in flight with overhead power lines

collision entre un avion motorisé en vol avec des lignes électriques aériennes


Corneal bur system, line-powered

système de fraise cornéenne sur secteur
TRADUCTIONS EN CONTEXTE
There is also a deficit in the hierarchy of budgetary priorities: it is all well and good to earmark EUR 200 million for the reconstruction of Iraq, to give another EUR 200 million to Afghanistan, and EUR 240 million to Turkey to cover pre-accession costs, but should these really be priorities when the whole of Europe has only EUR 600 million in 2004, with which it can build the equivalent of a few kilometres of TGV line?

Déficit aussi dans la hiérarchie des priorités budgétaires: c’est bien de prévoir 200 millions d’euros pour reconstruire l’Irak, c’est bien d’ajouter 200 millions pour l’Afghanistan, 240 millions pour la préadhésion de la Turquie! Mais est-ce que les priorités se situent là, quand l’Europe entière ne trouve, en 2004, que 600 millions d’euros pour construire l’équivalent d’une dizaine de kilomètres de TGV?


In France, we lose between EUR 2 and EUR 4 billion every year, which is the equivalent of one TGV line every year!

Nous perdons, en France, entre 2 et 4 milliards d’euros chaque année, c’est-à-dire l’équivalent d’une ligne TGV chaque année!


– Mr President, I am glad to be able to raise this matter in the presence of the Commissioner for Transport, Mrs de Palacio, because it is scandalous that the French Government obliges us to come to Strasbourg and has exercised political and emotional pressure - some would say blackmail - to keep us here, but fails both to get a TGV line built and, even as owner of Air France, to ensure decent air services to this beautiful but inconveniently located city.

- (EN) Monsieur le Président, je suis heureuse de pouvoir soulever cette question en la présence de la commissaire aux transports, Mme de Palacio, car il est scandaleux que le gouvernement français nous oblige à venir à Strasbourg et ait exercé une pression sur le plan politique et émotionnel - certains parleraient de chantage - pour que nous restions, alors qu’il ne parvient à garantir ni la construction d’une ligne de TGV ni, même en tant que propriétaire d’Air France, des services aériens convenables à destination de cette ville splendide mais mal située géographiquement.


In France, loans totalling EUR 2.7 billion have been advanced for high-speed rail lines (EUR 341 million for TGV Atlantique, EUR 884 million for TGV Nord Europe, EUR 618 million for TGV Méditerranée and EUR 605 million for TGV Est Europe).

En France, ses prêts en faveur des LGV totalisent 2,7 milliards d'euros (341 millions d'euros pour le TGV Atlantique, 884 millions d'euros pour le TGV Nord Europe, 618 millions pour le TGV Méditerranée et 605 millions pour le TGV Est Europe).


For more results, go to https://pro.wordscope.com to translate your documents with Wordscope Pro!
In the field of transport, priority was given to rail infrastructure through finance for three new sections (Madrid-Chiloeches, Chiloeches-Calatayud and Ricla-Zaragoza) of the Madrid to Lleida stretch (470 km) of the TGV line from Madrid to Barcelona and the French border.

Dans le domaine du transport, la priorité a été donnée aux infrastructures de chemin de fer par le financement de la ligne TGV Madrid-Barcelone-Frontière française, qui complète le tracé Madrid-Lleida (470 km).


I regret that the Council is still examining at state level what intermodal terminals should be included in the European combined transport network, and I am delighted by the change to the specific Project No 8 of the Annex relating to the ‘Lisbon-Valladolid motorway’, as it was formerly known, with its new name ‘the Portugal/Spain multimodal link with the rest of Europe’, for the management of rail, road, sea and air connections in the three Iberian corridors between Galicia and Portugal, between Portugal and Seville/Andalusia, and between Irún (in the Basque Country) and Portugal, which I hope will include the TGV high-speed train, and I also hope that financial aid will reach the so-called Basque ‘Y’, which, like any othe ...[+++]

Je regrette que le Conseil continue à envisager, au niveau étatique, d'inclure les terminaux intermodaux dans le réseau européen de transport combiné et je me réjouis de la modification du projet spécifique numéro 8 de l'annexe, relatif à "la liaison autoroutière Lisbonne-Valladolid", appelée à devenir la "liaison multimodale Portugal-Espagne avec le reste de l'Europe", pour la gestion des connexions ferroviaires, par route, maritimes et aériennes dans les trois corridors ibériques entre la Galice et le Portugal, entre le Portugal et Séville/Andalousie et entre Irún (au Pays basque) et le Portugal, qui inclura, je l'espère, le train à gr ...[+++]


I regret that the Council is still examining at state level what intermodal terminals should be included in the European combined transport network, and I am delighted by the change to the specific Project No 8 of the Annex relating to the ‘Lisbon-Valladolid motorway’, as it was formerly known, with its new name ‘the Portugal/Spain multimodal link with the rest of Europe’, for the management of rail, road, sea and air connections in the three Iberian corridors between Galicia and Portugal, between Portugal and Seville/Andalusia, and between Irún (in the Basque Country) and Portugal, which I hope will include the TGV high-speed train, and I also hope that financial aid will reach the so-called Basque ‘Y’, which, like any othe ...[+++]

Je regrette que le Conseil continue à envisager, au niveau étatique, d'inclure les terminaux intermodaux dans le réseau européen de transport combiné et je me réjouis de la modification du projet spécifique numéro 8 de l'annexe, relatif à "la liaison autoroutière Lisbonne-Valladolid", appelée à devenir la "liaison multimodale Portugal-Espagne avec le reste de l'Europe", pour la gestion des connexions ferroviaires, par route, maritimes et aériennes dans les trois corridors ibériques entre la Galice et le Portugal, entre le Portugal et Séville/Andalousie et entre Irún (au Pays basque) et le Portugal, qui inclura, je l'espère, le train à gr ...[+++]


A twin-track TGV line takes up a strip of land some 13 metres wide: a road capable of carrying the same volume of traffic would be 38 metres wide".

Le train à grande vitesse à double voie nécessite une bande de terrain d'environ treize mètres de largeur, une route capable d'absorber le même volume de trafic nécessite 38 m".


The extension will strengthen the strategy of providing an economic boost to the region, already started with the boring of the fixed cross-Channel link, the inauguration of the Euralille world trade centre and the opening of the TGV line Paris-Lille-London.

Cette réalisation constitue un élément renforçant la stratégie de dynamisation économique de la région, déjà amorcée avec le percement du lien fixe transmanche, l'installation du Centre international d'affaires Euralille et l'ouverture de la ligne TGV Paris-Lille-Londres.


The 280km-long "TGV Atlantique" line, which has already received financing from the European Investment Bank (EIB), will consist of three separate sections: - the first 124 km, linking Paris with Courtalain; - the second section (52 km) from Courtalain to Connerre - where it will connect with the Le Mans-Rennes-Britanny and the Angers-Nantes lines; - the third section (87km) linking Courtalain with St-Pierre-des-Corps, where it will connect with the south-western lines running to Bordeaux, Toulouse and the Spanish frontier.

Longue de 280 km, la nouvelle ligne du TGV Atlantique, qui a déjà bénéficié de financements de la part de la Banque Européenne d'Investisssement (BEI), comprendra trois tronçons distincts : - le premier de 124 km relie Paris à Courtalain; - le deuxième de 52 km relie Courtalain à Connerré en vue de la desserte du Mans, de Rennes et de la Bretagne d'une part, d'Angers et Nantes d'autre part; - le troisième de 87 km reliera Courtalain à St-Pierre-des Corps en vue de la desserte du Sud-Ouest de la France jusqu'à Bordeaux, Toulouse et la frontière espagnole.




datacenter (1): www.wordscope.be (v4.0.br)

'tgv line' ->

Date index: 2023-04-13
w